This is a Statement of Work (SOW) for the removal and installation of water slides at Barksdale Air Force Base Main Base Pool, located at 2938 Daedalus Avenue, Barksdale AFB, Louisiana. The contract, identified as FA460826QS026, was updated May 11, 2026.
The contractor must remove existing water slides from the pool deck and install four new Flum slides with an attached climbing structure. The new slides consist of: (1) a 72-foot long spiral slide starting at 18 feet high in yellow; (2) an 18-foot high curved slide in green; (3) a 16-foot high curved slide in red; and (4) a 12-foot high curved slide in blue. The contractor is responsible for all removal and disposal of existing slides, providing all personnel, equipment, tools, supervision, and related services necessary for completion. Installation services must occur during the off-season between Labor Day and Memorial Day. The contractor must ensure all hardware is in good condition and replace any hardware as needed. Work areas must be maintained in an organized and clean manner, and all waste disposal must follow proper procedures including hazardous materials handling.
The SOW includes comprehensive security and conduct requirements for contractor employees working on the military installation. Contractors must obtain visitor passes via 2SFS/SFA Form 74, coordinate with the Commercial Visitor Control Center, and comply with all base traffic regulations and security protocols. Employees are prohibited from possessing weapons, firearms, or ammunition on base. The contractor must maintain a safety plan meeting OSHA standards, provide appropriate Personal Protective Equipment, and report all accidents and incidents to the Main Base Pool Point of Contact. The contractor bears responsibility for safeguarding government property, managing records according to Air Force instructions, retrieving identification media from departing employees, and cooperating fully with any government accident investigations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
MAIN BASE POOL WATER SLIDE REMOVAL & INSTALLATION
May 11
Attachment
Description of work:
Scope of Work. Contractor will remove the existing water slides from the pool and then install new waterslides in their place.
Place of Performance. At the Barksdale Air Force Base Main Base Pool: 2938 Daedalus Avenue, Barksdale AFB, LA.
Background: Barksdale AFB is completing a renovation to update the existing pool facilities to update the safety and appearance of the existing pool.
Discussion: Contractor will be removing the current water slides from the pool deck and installing new waterslides in their place to ensure the installation meets OSHA standards.
Removal of Existing Slides: Contractor will be responsible for the removal and disposal of the existing slides.
Installation of New Slides: The new slides will be installed into the on the pool deck
Contractor will be responsible for ensuring the hardware is in good condition and replacing any hardware needed.
Equipment and Supplies: The contractor shall provide all personnel, equipment, tools, supervision, and other items and/or services necessary for water slide removal and installation.
Slide Replacement: Contractor will provide and install a new 4 Flum slide with an attached climbing structure.
Slide1 – Seventy-two feet (72’) long spiral slide starting at eighteen feet (18’) high,yellow Slide 2- Eighteen feet (18’) high curved slide, green Slide 3 – Sixteen feet (16’) high curved slide, red Slide 4 - Twelve feet (12’) high curved slide, blue
Further details can be found in Attachment 3 – Salient Characteristics
Time Frame: Installation services will take place during the off season, between Labor Day and Memorial Day.
Work Area: Work area should be kept in an organized and clean manner.
Waste Disposal:
Follow proper procedures for waste disposal, including hazardous materials Security Requirements:
Visitor Passes: To receive a visitor, pass the contactor much complete a 2SFS/SFA Form 74, and fax that form to the Contract Administrator. This form will be sent to the successful offer or upon request. This information will be reviewed and forwarded to the passing office. If a pass is approved, the Commercial Visitor Control Center will issue a SFMIS AF Form 75 (Visitor Pass) to the contractor and his/her employees
FA460826QS026
Attachment 1 upon completion of screening process for the duration of the contract. The screening process takes time, and the contractor shall visit the Commercial Visitor Control Center prior to expecting base entry to receive the required forms and instruction on the application process (to include estimated time of receiving the visitor pass). Although contractors will not be issued vehicle passes, vehicles will be subject to search while on the installation.
Employees privately owned vehicles will not be allowed access to the restricted/controlled
End of Statement of Work
FA460826QS026