This document is a Statement of Work (SOW) for the installation of a Paxton Access Control System in Building 6000 at Barksdale AFB, Louisiana. The key details are:
The SOW requires the installation of 16 Paxton Access Control Units (ACUs) and Net2 Plus POE keypads at door locations deemed necessary by the Facility Manager. This includes installing electric strikes where needed. The contractor must be a Paxton certified installer with a minimum of 3 years' experience and provide 3 references from recently completed similar jobs. The period of performance is 15 days after the award date. The related federal contract opportunity is a Request for Quotation (RFQ) under solicitation number FA460824QS021, which is a total small business set-aside with a NAICS code of 561622 and $25.0M size standard. Quotes are due by 12:00 PM CST on 7/19/2024 and must be valid for 120 days. A site visit is scheduled for 7/9/2024 with an RSVP deadline of 7/8/2024. Questions are due by 7/11/2024 with answers posted by 7/15/2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Install Paxton Access Control in Security Forces Building (Bldg. 6000)
OBJECTIVE: Install turn-key Paxton Access Control System throughout Bldg 6000 as outlined below.
All parts shall be new, used or refurbished strictly prohibited. Parts and pieces must be compatible with existing Paxton system.
QUALIFICATIONS:
1. Paxton certified installer with minimum 3-years’ experience.
2. Provide (3) references from recently completed similar jobs.
SCOPE OF WORK:
1. Install (16) Paxton Access Control Units (ACU’s) and Net2 Plus POE keypads at door locations where Facility Manager deems necessary
2. Install Electric Strikes where needed
3. Proposed ACU locations will be discussed with facility manager prior to doing any installs.
MATERIALS
1. Parts to be used:
Nomenclature/Part# UI Qty
US Net2 Pro Software (To be turned over to 2 SFS) EA 1
Cabling and Misc Hardware EA 16
US Net2 Plus with POE EA 16
US Proximity Keypad KP75 EA 16
Electric Strike HES 9600 EA 9
Electric Strike HES 1006C EA 6
Black Box Network Services LPJ016A-T-R2 Poe Injector EA 2
2. Submittals required on all parts and pieces.
3. An area will be provided on or near work site as required to store contractors LOM.
SPECIFICS:
1. Install ACU, keypad and wire to MLR trigger provided by customer at the Facility Manager’s requested locations.
2. Install ACU, keypad and wire to ET provided by customer at Facility Manager’s requested locations.
3. Cut-in electric door strikes (ES’s) and install ACU, keypad and applicable wiring harness at Facility
Manager’s requested locations.
4. There’s no old equipment to be removed from new ACU install locations.
5. Facility ceilings are suspended type.
6. No computers required.
7. No UPS’s required.
8. No CAD design required.
9. Bond & Insurance Per 2 CONS requirement.
INSTALLATION
1. Each ACU installation location shall be discussed and approved by the facility manager prior to install.
2. Installation will be done in a neat and professional manner, to include but not limited to the use of mounting hardware and cable management.
3. Any damage to the facility caused by the contractor will be repaired by the contractor in conjunction with 2 CES.
Attachment 1 - Paxton Access Control SOW 24 July 2024
FA460824QS021
1010816536C Highlight
1010816536C Highlight
1605337143A Highlight
1605337143A Highlight
1605337143A Highlight
1605337143A Highlight
1605337143A Highlight
1605337143A Highlight
INSPECTION, TESTING and CERTIFICATION:
1. Each install location will be tested by 2 SFS facility manager to verify 100 percent serviceability.
WORKSITE LOCATION:
1. 1200 Chappie James Rd
(B6000) Barksdale AFB, LA
71110
2. Contractor Working Days/Hours:
a. Normal duty time M-F, 0700-1630
b. Days and hours can be adjusted as required with prior approval from 2 CONS and 2
SFS 48 hrs prior to a proposed change.
2 SFS Shall:
1. Coordinate contractor base access as required to complete project.
PERMITS:
1. No permits required for this project.
PERIOD OF PERFORMANCE:
1. Completed NLT fifteen (15) days after period start date.
2. 2 CONS and contractor will determine award date when funding becomes available
Attachment 1 - Paxton Access Control SOW 24 July 2024
FA460824QS021
ACRONYMS
1. POE Power over Ethernet
2. ES Electrified Strike
3. EL Electrified Lock
4. ET Electrified Trim
5. MLR Motorized Latch Retraction
Attachment 1 - Paxton Access Control SOW 24 July 2024