This document is a Statement of Work (SOW) for the installation of a Paxton Access Control System in Building 6000 on Barksdale AFB, Louisiana. The key details are:
The objective is to install a turn-key Paxton Access Control System throughout Building 6000, including 15 Paxton Access Control Units (ACUs) and Net2 Plus POE keypads at designated door locations. The work requires a Paxton-certified installer with a minimum of 3 years' experience and 3 references from recently completed similar jobs. The scope includes installing the ACUs, electric strikes, and associated wiring. All materials must be new, and submittals are required. The installation must be completed within 15 days after the award date, with normal duty hours of Monday-Friday, 0700-1630. The work site is Building 6000 at 1200 Chappie James Rd, Barksdale AFB, LA 71110. This requirement is a total small business set-aside under NAICS code 561622, with a size standard of $25.0M.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Install Paxton Access Control in Security Forces Building (Bldg. 6000)
OBJECTIVE: Install turn-key Paxton Access Control System throughout Bldg 6000 as outlined below.
All parts shall be new, used or refurbished strictly prohibited. Parts and pieces must be compatible with existing Paxton system.
QUALIFICATIONS:
1. Paxton certified installer with minimum 3-years’ experience.
2. Provide (3) references from recently completed similar jobs.
SCOPE OF WORK:
1. Install (15) Paxton Access Control Units (ACU’s) and Net2 Plus POE keypads at door locations where Facility Manager deems necessary
2. Install Electric Strikes where needed
3. Proposed ACU locations will be discussed with facility manager prior to doing any installs.
MATERIALS
1. Parts to be used:
Nomenclature/Part# UI Qty
US Net2 Pro Software (To be turned over to 2 SFS) EA 1
Cabling and Misc Hardware EA 15
US Net2 Plus with POE EA 15
US Proximity Keypad KP75 EA 15
Electric Strike HES 9600 EA 9
Electric Strike HES 1006C EA 6
Black Box Network Services LPJ016A-T-R2 Poe Injector EA 2
2. Submittals required on all parts and pieces.
3. An area will be provided on or near work site as required to store contractors LOM.
SPECIFICS:
1. Install ACU, keypad and wire to MLR trigger provided by customer at the Facility Manager’s requested locations.
2. Install ACU, keypad and wire to ET provided by customer at Facility Manager’s requested locations.
3. Cut-in electric door strikes (ES’s) and install ACU, keypad and applicable wiring harness at Facility
Manager’s requested locations.
4. There’s no old equipment to be removed from new ACU install locations.
5. Facility ceilings are suspended type.
6. No computers required.
7. No UPS’s required.
8. No CAD design required.
9. Bond & Insurance Per 2 CONS requirement.
INSTALLATION
1. Each ACU installation location shall be discussed and approved by the facility manager prior to install.
2. Installation will be done in a neat and professional manner, to include but not limited to the use of mounting hardware and cable management.
3. Any damage to the facility caused by the contractor will be repaired by the contractor in conjunction with 2 CES.
Attachment 1 - Paxton Access Control SOW
FA460824QS021
1010816536C Highlight
1010816536C Highlight
INSPECTION, TESTING and CERTIFICATION:
1. Each install location will be tested by 2 SFS facility manager to verify 100 percent serviceability.
WORKSITE LOCATION:
1. 1200 Chappie James Rd
(B6000) Barksdale AFB, LA
71110
2. Contractor Working Days/Hours:
a. Normal duty time M-F, 0700-1630
b. Days and hours can be adjusted as required with prior approval from 2 CONS and 2
SFS 48 hrs prior to a proposed change.
2 SFS Shall:
1. Coordinate contractor base access as required to complete project.
PERMITS:
1. No permits required for this project.
PERIOD OF PERFORMANCE:
1. Completed NLT fifteen (15) days after period start date.
2. 2 CONS and contractor will determine award date when funding becomes available
Attachment 1 - Paxton Access Control SOW
FA460824QS021
ACRONYMS
1. POE Power over Ethernet
2. ES Electrified Strike
3. EL Electrified Lock
4. ET Electrified Trim
5. MLR Motorized Latch Retraction