Attachment 3 - Carpet Specifications(Updated 01 May 2024)_Redacted.pdf
PDF 650 KB Posted
- Attached to
- 2 LRS Carpet Replacement
- Solicitation number
- FA460824QC044
About this file
This document is a Request for Quotation (RFQ) for carpet removal and installation in 18 rooms of Building 6237 - Hanger 13 at Barksdale Air Force Base in Louisiana. The solicitation number is FA460824QC044, and it is a total small business set-aside with a North American Industry Classification System (NAICS) code of 314110 and a size standard of 1,500 employees.
The contract consists of three contract line item numbers (CLINs): carpet cost, adhesive cost, and installer cost (including shipping). A site visit is scheduled for April 23, 2024, and questions are due by April 26, 2024, with answers provided by May 1, 2024. Quotes are requested by May 6, 2024. The RFQ references several attachments, including the Statement of Work, carpet specifications, and other relevant documents. This procurement is part of the United States Air Force (USAF) Carpet II mandatory-use program, and Tier I carpet manufacturers are identified for the installer to coordinate material quotes and orders.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CARPET REPLACEMENT IN 18 ROOMS/AREAS IN BUILDING 6237 HANGER 13
TRAININ ROOM 105/106 overall 664 sq ft
OFFICE: RM 105 ATTACH OFFICE: RM 105 TESTING ROOM RM 106
192” x 300” = 400 sq ft 168” x 132” = 154 sq ft 120” x 132” = 110 sq ft
16’x25’ 14’x11’ 10’ x 11’
Tiles # 104 42 30
CUSTOMER SERVICE Room 108/112/113/114/overall 1223 sq ft
Main Office: RM 108 Stewart Office RM 112 Ray Office RM 114 Middle Area 1 RM 113
468” x 252” = 819 sq ft 120” x 110” = 110 sq ft 168” x 96” = 112 sq ft 156” x 168” = 182 sq ft 39’ x 21’ 10’ x 11’ 14’ x 8’ 13’ x 14’
Tiles # 209 30 28 49
RM 203 CSS (Orderly Room) overall 1502 sq ft
Main Office Area Entry Way before and after double glass doors 612” x 264” = 1122 sq ft 120” x 240” = 380 sq ft 51’ x 22’ 20’ x 10’
Tiles # 275 50
DO Room 204 in the CSS (Orderly Room) 132” x 168” = 154 sq ft 11’ x 14’
Tiles # 42
CEM Room 205 240” x 132” = 220 sq ft 20’ x 11’
Tiles # 60
CC Room 206 252” x 240” = 420 sq ft 21’ X 20’
Tiles # 120
LOG MGR Room 207 180” x 240” = 300 sq ft 15’ x 20’
Tiles # 60
HERITAGE Room 210 overall 628 sq ft Main Area 192” x 408” = 544 sq ft 16’ x 34’
Tiles # 136
CONFERENCE Room 211 Room 211a L-shape part 360” x 180” = 450 sq ft 48” x 192” = 240 sq ft 30’ x 15’ 4’ x 16’
Tiles # 120 16
SAFETY Room 102 QA Room 103 BJ Room 104 155” x 217” = 233.5 sq ft 234” x 294” = 477.75 sq ft 156” x 212” = 229.67 sq ft 13’x18’ 19.5’x24.5’ 13’x18’
Tiles # 42 130 63
LAN Room 107 EQ RM 116 EQ NCO 115 224” x 198” = 302 sq ft 224” x 198” = 374 sq ft 75” X 144” = 219 sq ft 19’x16.5’ 19’x16.5’ 9’x12’
Tiles # 70 70 16
Over total tile 1,762 Extra tiles 50
CARPET REPLACEMENT IN 18 ROOMS
File details come from the government source that posted it. Updated .