Attachment 2 - Statement of Work.pdf
PDF 933 KB Posted
- Attached to
- 2 LRS Carpet Replacement
- Solicitation number
- FA460824QC044
About this file
This document is a Statement of Work (SOW) for a contract opportunity to replace carpet in 18 rooms in Building 6237 (Hanger 13) at Barksdale Air Force Base in Louisiana. The vendor will provide the carpet tiles and adhesive, and the installer will provide all labor, materials, tools, and incidentals to install the carpet within 45 days of contract award. The work will be coordinated with the 2d Logistics Readiness Squadron POCs. The related federal contract opportunity is a Request for Quotation (RFQ) solicitation number FA460824QC044 issued by the Department of the Air Force Global Strike Command for the carpet removal and installation. The solicitation is a total small business set-aside with a 1,500-employee size standard. A site visit is scheduled for April 23, 2024, and quotes are due by May 6, 2024. The contractor must purchase the carpet from one of the awarded Tier I manufacturers under the USAF Carpet II program, and contractor markup or profit on those Tier I purchases is not allowed.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Version 2; Current As Of 09 April 2024
Carpet Replacement In Building 6237 (Hanger 13)
1. Descrip on of Work
1.1. Objec ve: Vendor will provide the carpet les and glue. The installer shall provide all labor, materials, tools, parts, and incidentals to install the carpet and glue provided by the vendor in eighteen (18) different rooms.
1.2. Place of Performance: The work will be completed in Building 6237 (Hanger 13) located on Barksdale
Air Force Base (AFB), in Louisiana.
1.3. Period of Performance: Work is to be completed within 45 days from the date contract is awarded.
1.4. Scope: Installa on of new carpet.
2. Deliverables
2.1. Installa on of carpet in eighteen (18) different rooms in Building 6237 (Hanger 13).
2.1.1. Once carpet/glue is delivered, do a room at a me.
2.1.2. Customer will empty room to include old carpet and clean floor.
2.1.3. Installer will prep the floor and install the carpet.
2.1.4. Installer will remove any waste created.
3. Addi onal Requirements
3.1. Installer will work with the customer to determine the dates and mes of install. It can be on weekends.
4. Equipment List
4.1 Eighteen hundred (1800) 24”x24” carpet les and seventeen (17) each of four (4) gallons of adhesive
(recommended).
5. Government Point of Contacts (POCs)
5.1. All work within contract, coordina on of delivery of carpet les; glue; scheduling of installa on dates/ mes shall be coordinated with the 2d Logis cs Readiness Squadron (2 LRS) POCs listed here ‐
5.1.1. Primary POC:
Mrs. Beverly Weiser
Email: beverly.weiser.3@us.af.mil
Phone: (318) 456‐8942
5.1.2. Alternate POC:
Mr. Cedric Sco
Email: cedric.sco .1@us.af.mil
Phone: (318) 456‐8445
‐‐‐‐‐‐‐‐ END OF SOW ‐‐‐‐‐‐‐‐
FA460824QC044
Attachment 2
File details come from the government source that posted it. Updated .