Questions_Answers V2.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Paint Hangars B5766 & B5778 Federal contract opportunity
Solicitation number
FA460822B0002
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Paint Hangars B5766 & B5778, newest first.
File Type Posted
Lead Test.pdf PDF
Solicitation Amendment FA460822B00020001 SF 30.pdf PDF
Questions_ Answers.xlsx XLSX spreadsheet
Site Visit Sign-In.pdf PDF
Attachment 3 - Drawings B5778.pdf PDF
Attachment 6 - Schedule of Material Submittals.pdf PDF
Attachment 8 - Financial Information Request.pdf PDF
Solicitation - FA460822B0002.pdf PDF
Attachment 4 - Environmental Requirements.pdf PDF
Attachment 7 - Wage Determination LA20220030.pdf PDF
Attachment 9 - Barksdale AFB Map.pdf PDF
Attachment 1 - SOW.pdf PDF
Attachment 5 - Proof of Insurance.pdf PDF
Attachment 2 - Drawings B5766.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Answers

QuestionsGOVT. Response
1.SOW talks about washing and repainting walls, but barely touches on preparation. Some areas of the walls will require scraping where paint has failed. This can remove paint layers all the way to the substrate. If all paint layers everywhere are not removed there will be a height difference visible between the substrate and the remaining paint layers. Must the edges of the remaining layers be smoothed down? Or must all existing layers be removed?Loose paint should be removed back to solid material. Edges of the remaing layers do not need to be sanded down to a smooth transition. We did not plan to remove all layers of the existing coatings/paint back to the substrate.

2. The SOW seems to require full prime. Does it, or is spot priming OK? KTR should provide full prime(-ing) of the facilities.

3. Other surfaces besides walls are mentioned in passing, like handrails. What surfaces are included and which are not? See attached chart for clarification of surfaces to be painted.

4. Other items are attached to the walls but not specified in the SOW, e.g., sheds, electrical boxes, conduits, wires, awnings. Again, what surfaces are included and which are not? See attached chart for clarification of surfaces to be painted.

5. SOW states “Work will include abrasive blasting to remove visible rust on any metal stair or handrails”. Must blasting be used, or can the contractor use other methods, including rust penetrating primers? We will be deleting media blasting of the metal surfaces from the SOW. Clean visible rust using SSPC-SP1, Solvent Cleaning and SSPC-SP3, Power Tool Cleaning prior to priming and painting.

6. Has a hazardous materials survey been conducted on any of the buildings? The KTR should assume the presence of lead-based paints. No current lead-based paint survey has be performed on B5778, B5766, B5755, and B5743. We have requested sampling for lead-based paint to be performed on the four (4) hangars, but results have not be returned as of this date.

7. How is this to be accomplished if lead is present in any layer of the previous applied paint? The KTR should assume the presence of lead-based paints. The KTR should utilize appropriate level of PPE to perform the work specified by the SOW/PPI, but the KTR should not provide any lead abatement activities other than the steps the GOVT has called out during the RFP process. 2CES Environmental will brief the KTR/subKtr prior to cleaning/scraping the building regarding lead in its collection and disposal. 2CES Environmental (HAZ-Waste) will provide containers to dispose of paint chips/debris and tarps, i.e. plastic sheeting in them. KTR/subKTR should tarp the surrounding ground around the buildings and protect the adjacent storm water drains (with filter fabric/socks) from loose paint chips/debris from entering the drainage system. KTR/subKTR can (low/high) pressure wash the building with WATER ONLY and spot clean tough spots with brushes/rags and a cleaning product, but they cannot wash the residue of the product into the drains. The cleaning product(s) should be turned in to the Government as a submittal to 2CES Environmental for approval on-base. Any water that accumulates on the tarps should be left to evaporate. After cleaning/scraping of the buildings, KTR/subKTR should collect the paint chips/debris and/or the tarps and place them into the containers and dispose of them with 2CES (Mr. Bill Lee). Also, they should remove any paint chips/debris off of the (ground) tarps at the end of the each work day and prior to any rain events. Then, KTR/subKTR can continue with priming and painting as stated in the SOW.

8. If such a survey has been performed, will the results of the survey be published in an addendum/amendment? No survey has been performed.

9. Due to the age of the buildings, and the condition and thickness of the existing coatings, there is a likelihood that lead containing coatings are present. Has a lead paint assessment been performed? No survey has been performed.

10. If there is lead containing paint will the government require it to be removed under current regulations concerning lead in paint removal, and what is to be done with the generated waste? See Answer 7

11. If lead paint is present will a licensed lead abatement contractor be required for the project and to address lead issues? See Answer 7

12. In addition to the potential presence of lead containing coatings, there is also the potential for friable asbestos containing building materials to be present on the building exterior. Has a hazardous materials assessment or survey been performed on these buildings? No lead-based paint survey has be performed on B5778, B5766, B5755, and B5743, but there is no asbestos-containing materials (ACM) present on these building exteriors.

13. Pressure washing of the buildings will produce wash water containing detergents and other contaminants. Whose responsibility will the blocking of storm drains fall upon. Most are on the streets surrounding the buildings. KTR will be responsible to protect stormwater catch basins from contaminants, i.e. paint chips with filter cloth/filter booms. Also, pressure (low or high) washing shall be WITH WATER ONLY per 2CES Envirnomental. If there is a stubborn spot that needs to have more attention to clean to spec before painting, it can be spot washed using a brush or rag. However, residues will not be washed down after and all chemicals must be pre-approved through 2CES Environmental with a provided SDS.

14. What is to be done with the water that might be captured at storm drains? KTR will be responsible to protect stormwater catch basins from contaminants, i.e. paint chips with filter cloth/filter booms. The water that pools on the plastic sheeting should be left to evaporate.

15. Will the Government provide sanitary sewer or a wash tank for clean-up of waterborne coatings wash water to be disposed of? The KTR should provide all necessary items to perform their work.

16. If equipment and supplies can be contained in a closed covered trailer, will that suffice in lieu of the lay down area fencing? A closed, covered trailer(s) will suffice in lieu of a fenced lay down area.

17. Considering the current state for the multiple coating failures and substrate failure beneath the existing coatings is there an assumed percentage of failure to be determined for estimating reasons, or will additional site visits be allowed to provide destructive testing to verify exact quantities of failed material? It appears that there is significant areas of failure and further testing is required. No additional site visits or destructive testing will be offered.

18. Can all buildings awarded be worked concurrently? All building can be worked concurrently with a approved schedule.

19. With the potential for hazardous materials, extensive coating removal, and substrate repairs the performance period could be extremely difficult and require additional resources as compared to a standard project; can the performance period be reviewed when the additional work requirements determined, or should we develop our proposal based on the performance period and the additional resources needed if any? See Answer 7

20. Do disruptive operations such as abrasive blast operations need to be performed during off hours or can we plan on all standard hours? We will not be performing any media blasting as stated in the SOW. All work will be performed during normal working hours.

21. Will restroom use be allowed at the facility, or will portable restrooms need to be provided? No. KTR should provide portable restroom facilities for their employees.

22. Are we painting the non-attached structures? See attached chart regarding pump house, sheds, storage, and etc. per building.

23. Are we painting the roof top vents and turbans? Yes, KTR plan to prep and paint roof top vents, sewer vents, and etc. to match roof color.

24. Are we required to perform metal repairs? You will not perform any metal repairs. You can inform the GOVT of any such needed repairs.

25. Are we required to perform concrete repairs? You will not perform any concretel repairs. You can inform the GOVT of any such needed repairs.

26. Are we painting the bronze window trim? No, we are not painting the trim associated with the translucent building panels, i.e. "Kalwall", but KTR should be pressure washing to clean them.

27. Are the windows to be painted completely or just the trim only? KTR is not painting the translucent building panels.

28. What extent is the rust removal/corrosion to be removed? Just pressure washed and primed only or does it need to be sandblasted down to the clean steel? We will be deleting media blasting of the metal surfaces from the SOW. Clean visible rust using SSPC-SP1, Solvent Cleaning and SSPC-SP3, Power Tool Cleaning prior to priming and painting.

29. Are all associated buildings included in the painting of the hangers, such as pump houses, sheds, storage, etc.? See attached chart regarding pump house, sheds, storage, and etc. per building.

30. Are the painting flaking areas to pressure washed and primed only or does it need to be scraped and sandblasted down to the clean steel? We will be deleting media blasting of the metal surfaces from the SOW. Clean visible rust using SSPC-SP1, Solvent Cleaning and SSPC-SP3, Power Tool Cleaning prior to priming and painting.

31. What is the paint mileage thickness required for this project? Steel/Ferrous Surfaces = 5.25 mils System DFT; Wood = 5 mils System DFT; Stucco = 4.5 mils System DFT; Surfaces adjacent to painted surfaces, i.e. electrical = 5.25 mils System DFT. Provide testing to prove mil thickness was achieved @ each of the different surfaces to recieve work.

32. Are the letters and numbers on the hangers to be painted? No. See attached chart regarding building letters, street numbers, building numbers.

33. There are several out building/covers on the perimeter of the hangars that are painted the same as the hangars. Are these buildings/covers/patios included in the scope of work? See attached chart regarding these exterior buildings/covers/patios.

34. Are roll up doors included in the scope of work? See attached chart regarding coiling doors per building.

35. Will the lettering and numbers on the buildings need to be removed and reinstalled as part of the scope of work? See attached chart regarding coiling doors per building.

36. Are stairs and handrails painting part of the scope of work? Yes. KTR should provide pricing for stair(s) and handrails(s) and their associated structure as part of the required work.

37. Is access provided to water and electricity for power washing, etc.? GOVT will provide a water connection point(s) to be used along with a source of electrical power @ the buildings.

38. Will man-lifts be provided or is that contractor supplied? No. KTR should provide any equipment that is needed to complete the work.

39. Will temporary facilities (e.g., trailers, storage pods) be provided or is that contractor supplied? No. KTR should provide any temporary facilities that are needed to complete the work.

Chart

B5788B5766
West sideWest side
Remove letters prior to work and install after work is complete.Remove letters prior to work and install after work is complete.
Mask building number prior to work.Mask building number prior to work.
Painted louvers in "Kalwall" should be prep'ed and painted to existing paint color.Man door (in coiling door) should be prep'ed and painted to building trim color.
Coiling door should be prep'ed and painted to match building body color.Coiling door should be prep'ed and painted to match building body color.
Electrical conduits should be prep'ed and painted to match building body color.Parapet (metal) cap should be prep'ed and painted to match building trim color (both sides).
North sideAwning structure should be prep'ed and painted to match building body color.
Stairs/landings/structure (2) should be prep'ed and painted to match building body color. (NE, NW)North side
Stair threads should be painted w/anti-skid coating to reduce falls.Awning structure should be prep'ed and painted to match building body color.
Gutters should be prep'ed and painted to match building trim color.Gutters should be prep'ed and painted to match building trim color.
Downspouts should be prep'ed and painted to match building body color.Downspouts should be prep'ed and painted to match building body color.
Electrical panels/conduits should be prep'ed and painted to match building body color.Electrical panels/conduits should be prep'ed and painted to match building body color.
Lean-to structures (3) should be prep'ed and painted to match building body color.Gas piping should be prep'ed and painted to match building body color.
Awning structure should be prep'ed and painted to match building body color.Coiling door (2) should be prep'ed and painted to match building body color.
East sideMan door (in coiling door) (2) should be prep'ed and painted to building trim color.
Remove letters and street numbers prior to work and install after work is complete.Lean-to structure "The Roost" should be prep'ed and painted to match building body color. (NW)
South sideShed structure should be prep'ed and painted to match building body color. (NW)
Electrical panels/conduits should be prep'ed and painted to match building body color.East side
Gutters should be prep'ed and painted to match building trim color.Remove letters and street numbers prior to work and install after work is complete.
Downspouts should be prep'ed and painted to match building body color.Parapet (metal) cap should be prep'ed and painted to match building trim color (both sides).
Transformer should be prep'ed and painted to match building trim color. (SW)
Stairs/landings/structure (1) should be prep'ed and painted to match building body color. (SW)South sideLean-to structure (Compressor Room) should be prep'ed and painted to match building body color.
Stair threads should be painted w/anti-skid coating to reduce falls.Electrical panels/conduits should be prep'ed and painted to match building body color.
Awning structure should be prep'ed and painted to match building body color.Piping should be prep'ed and painted to match building body color.
NOTES:Gutters should be prep'ed and painted to match building trim color.
1. "Kalwall translucent building panels and associated trim" - No painting is required, but should be pressured washed.Downspouts should be prep'ed and painted to match building body color.
Man door (in coiling door) should be prep'ed and painted to building trim color.
Transformer - No work. (SW)
NOTES:
1. "Kalwall translucent building panels and associated trim" - No painting is required, but should be pressured washed.
B5755B5743
West sideWest side
Remove letters prior to work and install after work is complete.Remove letters prior to work and install after work is complete.
Mask building number prior to work.Mask building number prior to work.
Coiling door should be prep'ed and painted to match building body color.Man door should be prep'ed and painted to building trim color.
Man door (in coiling door) should be prep'ed and painted to building trim color.North side
Bollards @ equipment should be prep'ed and painted to match building trim color.Coiling door should be prep'ed and painted to match building body color.
Electrical panels/conduits should be prep'ed and painted to match building body color.Gutters should be prep'ed and painted to match building trim color.
North sideDownspouts should be prep'ed and painted to match building body color.
Coiling door should be prep'ed and painted to match building body color.Electrical panels/conduits should be prep'ed and painted to match building body color.
Man door (in coiling door) should be prep'ed and painted to building trim color.Lean-to structure should be prep'ed and painted to match building body color.
Metal (pre-fab) shed structure - no work.East side
Gutters should be prep'ed and painted to match building trim color.Remove letters and street numbers prior to work and install after work is complete.
Downspouts should be prep'ed and painted to match building body color.Coiling door should be prep'ed and painted to match building body color.
Painted "red" letter sign should be removed and replaced after painting is complete.Man door (in coiling door) should be prep'ed and painted to building trim color.
Transformers (2) should be prep'ed and painted to match building trim color. (NE)Transformer should be prep'ed and painted to match building trim color.
East sideSouth side
Remove letters and street numbers prior to work and install after work is complete.Bollards @ HVAC unit should be prep'ed and painted to match building trim color.
Man door (in hangar doors) should be prep'ed and painted to building trim color.Coiling door should be prep'ed and painted to match building body color.
South sideElectrical panels/conduits should be prep'ed and painted to match building body color.
Shed structure - no work. (SW)Gutters should be prep'ed and painted to match building trim color.
Painted panels in "Kalwall" should be prep'ed and painted to match existing paint color, i.e. dark bronze.Downspouts should be prep'ed and painted to match building body color.
Lean-to structure (Offices) should be prep'ed and painted to match building body/trim colors as currently represented.NOTES:
Electrical panels/conduits should be prep'ed and painted to match building body color.1. "Kalwall translucent building panels and associated trim" - No painting is required, but should be pressured washed.
Gutters should be prep'ed and painted to match building trim color.
Downspouts should be prep'ed and painted to match building body color.
Enclosure (dog house) structure should be prep'ed and painted to match building body color. (SE)
NOTES:
1. "Kalwall translucent building panels and associated trim" - No painting is required, but should be pressured washed.