Q A__3_Clarifications_as_of_10Feb.pdf

PDF 55 KB Posted

Attached to
Repair Electrical Equipment with Pad Mounted on Davis Rd Federal contract opportunity
Solicitation number
FA4608-15-R-0006
Issued by
Department of the Air Force Global Strike Command

About this file

Clarifications as of 10 Feb 2015

View the file

Other files for this federal contract opportunity

Other files attached to Repair Electrical Equipment with Pad Mounted on Davis Rd, newest first.
File Type Posted
Clarification_as_of_12_Feb_15.pdf PDF
Q A__2_ _Clarifications_as_of_6_Feb.pdf PDF
Questions_and_Answers_as_of_3_Feb_2015.pdf PDF
Pull_Box_Example_or_Equivalent.pdf PDF
SOW__AWUB_07-0110_REVISED_27_Jan_2015.pdf PDF
Attendance_Sheet.pdf PDF
Feeder_10_fault_current_info.pdf PDF
Drawings.pdf PDF
FA4608-15-R-0006.pdf PDF
Attachment_4_-_WD_LA_150034.pdf PDF
Attachment_1_-_SOW.pdf PDF
Attachment_2_-_Environmental_Requirements.pdf PDF
Attachment_7_-_AFI_32-1001.pdf PDF
Attachment_3_-_Insurance_Certification.pdf PDF
Attachment_5_-_BAFBI_33-2.pdf PDF
Attachment_6_-_AF66.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLARIFICATIONS

As of 10 Feb 2015

FA4608-15-R-0006 AWUB 07-0110

Repair Electrical Equipment with Pad Mounted on Davis Rd

1) The Bid Documents contain only non-scaled sketches showing the building at a schematic level of the existing equipment. This makes it impractical to determine the lengths and routes of the feeders.

There are no electrical drawings available for B4173, the site visit provided the opportunity for everyone to investigate and gather all information necessary to bid this project.

2) Please refer to Sheet E2, Circuit # 1-11. The revised SOW provides no way to determine the length of service for this circuit.

There are no electrical drawings available for B4173. Obviously, investigation by the contractor with measurement apparatus is required.

3) The Bid Documents do not contain sufficient information to determine the number, sizes, and types of breakers in the existing panels to be replaced. In addition the site visit did not provide the opportunity to ascertain this information.

The site visit afforded ample opportunity for the bidders to ask questions, take measurements, pictures and investigate all existing conditions of this project.