Solicitation No.: FA4608-R-0005 Attachment 1
BASE YEAR (1 NOV 2013 – 31 OCT 2014)
LINE
NO. ITEM
UNIT
MEAS QUAN EST
UNIT
COST TOTAL
Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost. SF 30000
Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000
Demolish & remove insulation board.
Includes labor cost.
SF 60000
Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.
SF 30000
Demolish & remove tapered insulation, rigid. Includes labor.
SF 6000
Demolish & remove existing soffit, metal. Includes labor cost.
SF 1500
Demolish &remove existing soffit, plywood. Includes labor cost.
SF 1500
Demolish & remove CDX plywoodwood decking. Includes labor cost.
SF 1500
Demolish & remove wood decking, 1"x 6" to 1"x12"
SF 1500
Demolish & remove wood fascia.
Includes labor cost.
LF 3000
Demolish & remove metal gutter.
Includes labor cost.
LF 1500
Demolish & remove metal downspout.
Includes labor cost.
LF 600
Demolish & remove metal deck.
Includes labor cost.
SF 1500
Demolish & remove metal standing seam roof. Includes labor cost.
SF 9000
Demolish & remove metal standing seam facia. Includes labor costs.
SF 600
Demolish & remove metal roof, screw attached. Includes labor and equipment costs. SF 9000
Demolish & remove metal wall panel/facia. Includes labor cost.
SF 600
Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900
Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.
SF 1500
Demolish and remove extg counterflashing. Includes labor cost.
LF 3000
Remove clay tiles from roof and clean.
Includes labor and materials.
SF 3000
Asbestos abatement, BUR. Includes labor, equipment and other direct costs. SF 1500
Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.
SF 1500
Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500
Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500
Disposal of ACM as hazardous waste.
Includes storage, hauling, dump fee and any other cost. CY 120
TCLP test, incl sampling, analysis and report.
EA 6
Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500
Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.
Includes mtl, lab, equip, hauling and disopsal fee.
SF 1500
Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12
Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs. DAY 4
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF SF 15000
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF SF 15000
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <
15,000 SF SF 7500
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=
15,000 SF SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF
SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF SF 7500
Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000
Install vented base sheet. Includes materials and labor costs.
SF 18000
Install relief vent. Include materials and labor costs.
EA 12
Install new metal fascia, to 6" width.
Includes labor and materials cost.
LF 600
Install new metal fascia, to 12" width.
Includes labor and materials.
LF 600
Install new metal fascia, to 18" width.
Includes labor and materials.
LF 600
Install new metal parapet coping/capflashing, to 12" wall.
Includes labor and materials. LF 600
Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600
Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs. SF 3000
Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000
Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000
Install new insulation, poly-iso/polystyrene, per inch thickness.
SF 40000
R=5 per inch. Includes labor and materials costs.
Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.
Includes labor and materials costs. SF 12000
Install new insulation, 1" perlite.
Includes labor and material costs.
SF 30000
Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.
SF 20000
Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.
SF 9000
Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000
00556
Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000
00058
Install wood runner/facia 2"x8".
Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x12".
Includes labor, materials, equipment & any other cost. LF 1000
Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost. SF 1500
Install new wood decking, 1" nominal lumber. Includes labor and material.
SF 1500
Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500
Install new Thermoplastic flashing.
Includes labor, material, and equipment. LF 1500
Install new PVC clad metal flashing.
Includes labor, material, and equipment. LF 1500
Install new wood 4"x4" cant strip.
Includes labor and material.
LF 1500
Install new fiber 4"x4" cant Strip.
Includes labor and material.
LF 1500
Install new pre finished metal gutter, upto 18" girth- surface mounted.
Includes labor and material. LF 1500
Install new metal gutter, upto 24" girth, built-in. Includes labor and material.
LF 1500
Install new metal downspout, 4"x6".
Includes labor and material.
LF 1500
Install new concrete splashblock upto 1'x2'. Includes labor and material.
EA 12
Install new expansion joint. Includes labor and material.
LF 120
Install new sheet metal pitch pan.
Includes labor and material.
EA 24
Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar.
Includes labor and material. LF 3000
Install new lead flashing jack, to 8" diameter. Include labor & material.
EA 6
Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300
Install new metal gravel guard. Include labor & material.
LF 1500
Install new metal drip edge. Include labor & material.
LF 1500
Install new lightweight conc deck.
Include labor, material, equipment and anyother cost. SF 450
Install new metal deck. Include labor, material, equipment and anyother cost.
SF 1500
Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12
Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12
Install flexible bellows to 4" roof drain.
Includes material and labor.
EA 12
Install flexible bellows to 6" roof drain.
Includes material and labor cost.
EA 12
Install new traffic pads. Include labor & material cost.
SF 300
Install new wood curbs upto 2"x10".
Include labor & material cost.
EA 10
Install new pre-fab metal curb. Include labor & material cost.
EA 10
Install new pre-fab insulated metal curb. Include labor & material cost.
EA 10
Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost. EA 2
Install new scupper. Include labor & material cost.
EA 12
Install new scupper w/ strainer.
Include labor & material cost.
EA 12
Install new standing seam metal roof, concealed fasteners. Include labor & material cost. SF 12000
Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000
Install new metal base/valley/ridge/counter flashing.
Includes labor and material. LF 12000
Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10
Install new metal flashing collar, to 8" diameter. Include labor & material cost. EA 15
Install new metal flashing collar, to 12" diameter. Include labor & material cost.
EA 15
Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300
Install fiber glass shingles. Include labor & material.
SF 18000
Install #15 felt underlayment. Include labor & material.
SF 18000
Apply elastomeric coating to roof.
Includes labor, material, and equipment. SF 5000
Reinstall existing clay tiles. Includes labor and materials.
SF 3000
Install new clay tiles . Includes labor and materials.
SF 3000
Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3
Remove and reinstall existing light equipment. Include labor & material cost. EA 6
Install new metal roof jack for gooseneck. Includes labor and material. EA 30
Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.
LF 120
Install new pressure treated wood nailer 2"x4". Include labor and material costs. LF 1200
Install new pressure treated wood nailer 2"x6". Include labor and material costs. LF 1200
Install new pressure treated wood nailer 2"x8". Include labor and material costs. LF 1500
Install new pressure treated wood nailer 2"x10". Include labor and material costs. LF 1500
Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost. SF 12000
Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 600
Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 900
Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost CY 600
0115 Mobilization of coring machine LS 1 0116 Core drill 4" hole in concrete wall IN 50 0117 Install 4" PVC roof drain pipine with clevis hangers
LF 150
0118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation
LF 150
0119 Powerwash surface SF 5000
TOTAL BASE YEAR COST
1ST OPTION YEAR (1 NOV 2014 – 31 OCT 2015)
NO. ITEM
UNIT
MEAS
QUAN
EST
UNIT
COST TOTAL
Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost.
SF 30000
Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000
Demolish & remove insulation board.
Includes labor cost.
SF 60000
Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.
SF 30000
Demolish & remove tapered insulation, rigid. Includes labor.
SF 6000
Demolish & remove existing soffit, metal.
Includes labor cost.
SF 1500
Demolish &remove existing soffit, plywood. Includes labor cost.
SF 1500
Demolish & remove CDX plywoodwood decking. Includes labor cost.
SF 1500
Demolish & remove wood decking, 1"x 6" to 1"x12"
SF 1500
Demolish & remove wood fascia.
Includes labor cost.
LF 3000
Demolish & remove metal gutter.
Includes labor cost.
LF 1500
Demolish & remove metal downspout.
Includes labor cost.
LF 600
Demolish & remove metal deck.
Includes labor cost.
SF 1500
Demolish & remove metal standing seam roof. Includes labor cost.
SF 9000
Demolish & remove metal standing seam facia. Includes labor costs.
SF 600
Demolish & remove metal roof, screw attached. Includes labor and equipment costs.
SF 9000
Demolish & remove metal wall panel/facia. Includes labor cost.
SF 600
Demolish & Remove lightweight concrete deck. Includes labor and equipment cost.
SF 900
Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.
SF 1500
Demolish and remove extg counterflashing. Includes labor cost.
LF 3000
Remove clay tiles from roof and clean.
Includes labor and materials.
SF 3000
Asbestos abatement, BUR. Includes labor, equipment and other direct costs.
SF 1500
Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.
SF 1500
Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500
Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500
Disposal of ACM as hazardous waste.
Includes storage, hauling, dump fee and any other cost.
CY 120
TCLP test, incl sampling, analysis and report. EA 6
Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor.
SF 1500
Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.
Includes mtl, lab, equip, hauling and disopsal fee.
SF 1500
Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12
Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs.
DAY 4
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF
SF 15000
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF
SF 15000
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <
15,000 SF SF 7500
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=
15,000 SF SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF
SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF
SF 7500
Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost.
LF 15000
Install vented base sheet. Includes materials and labor costs.
SF 18000
Install relief vent. Include materials and labor costs.
EA 12
Install new metal fascia, to 6" width.
Includes labor and materials cost.
LF 600
Install new metal fascia, to 12" width.
Includes labor and materials.
LF 600
Install new metal fascia, to 18" width.
Includes labor and materials.
LF 600
Install new metal parapet coping/capflashing, to 12" wall. Includes labor and materials. LF 600
Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600
Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs.
SF 3000
Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000
Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000
Install new insulation, poly-iso/polystyrene, per inch thickness. R=5 per inch. Includes labor and materials costs. SF 40000
Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.
Includes labor and materials costs.
SF 12000
Install new insulation, 1" perlite. Includes labor and material costs.
SF 30000
Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.
SF 20000
Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.
SF 9000
Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x8". Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x12".
Includes labor, materials, equipment & any other cost. LF 1000
Install new CDX plywood decking, to 5/8"
th. Includes labor, materials, equipment & any other cost.
SF 1500
Install new wood decking, 1" nominal lumber. Includes labor and material.
SF 1500
Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500
Install new Thermoplastic flashing.
Includes labor, material, and equipment. LF 1500
Install new PVC clad metal flashing.
Includes labor, material, and equipment. LF 1500
Install new wood 4"x4" cant strip.
Includes labor and material.
LF 1500
Install new fiber 4"x4" cant Strip.
Includes labor and material.
LF 1500
Install new pre finished metal gutter, upto 18" girth- surface mounted. Includes labor and material.
LF 1500
Install new metal gutter, upto 24" girth, built-in. Includes labor and material.
LF 1500
Install new metal downspout, 4"x6".
Includes labor and material.
LF 1500
Install new concrete splashblock upto 1'x2'. Includes labor and material.
EA 12
Install new expansion joint. Includes labor and material.
LF 120
Install new sheet metal pitch pan.
Includes labor and material.
EA 24
Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar. Includes labor and material. LF 3000
Install new lead flashing jack, to 8" diameter. Include labor & material.
EA 6
Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300
Install new metal gravel guard. Include labor & material.
LF 1500
Install new metal drip edge. Include labor & material.
LF 1500
Install new lightweight conc deck.
Include labor, material, equipment and anyother cost. SF 450
Install new metal deck. Include labor, material, equipment and anyother cost.
SF 1500
Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12
Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12
Install flexible bellows to 4" roof drain.
Includes material and labor.
EA 12
Install flexible bellows to 6" roof drain.
Includes material and labor cost.
EA 12
Install new traffic pads. Include labor & material cost.
SF 300
Install new wood curbs upto 2"x10".
Include labor & material cost.
EA 10
Install new pre-fab metal curb. Include labor & material cost.
EA 10
Install new pre-fab insulated metal curb.
Include labor & material cost.
EA 10
Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost.
EA 2
Install new scupper. Include labor & material cost.
EA 12
Install new scupper w/ strainer. Include labor & material cost.
EA 12
Install new standing seam metal roof, concealed fasteners. Include labor & material cost.
SF 12000
Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost
SF 12000
Install new metal base/valley/ridge/counter flashing.
Includes labor and material. LF 12000
Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10
Install new metal flashing collar, to 8" diameter. Include labor & material cost.
EA 15
Install new metal flashing collar, to 12" diameter. Include labor & material cost.
EA 15
Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300
Install fiber glass shingles. Include labor & material.
SF 18000
Install #15 felt underlayment. Include labor & material.
SF 18000
Apply elastomeric coating to roof.
Includes labor, material, and equipment.
SF 5000
Reinstall existing clay tiles. Includes labor and materials.
SF 3000
Install new clay tiles . Includes labor and materials.
SF 3000
Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3
Remove and reinstall existing light equipment. Include labor & material cost.
EA 6
Install new metal roof jack for gooseneck.
Includes labor and material.
EA 30
Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.
LF 120
Install new pressure treated wood nailer 2"x4". Include labor and material costs.
LF 1200
Install new pressure treated wood nailer 2"x6". Include labor and material costs.
LF 1200
Install new pressure treated wood nailer 2"x8". Include labor and material costs.
LF 1500
Install new pressure treated wood nailer 2"x10". Include labor and material costs.
LF 1500
Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost.
SF 12000
Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost
CY 600
Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost
CY 900
Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost
CY 600
1115 Mobilization of coring machine LS 1 1116 Core drill 4" hole in concrete wall IN 50 1117 Install 4" PVC roof drain pipine with clevis hangers
LF 150
1118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation
1119 Powerwash surface SF 5000
TOTAL 1st OPTION YEAR COST
2ND OPTION YEAR (1 NOV 2015 – 31 OCT 2016)
NO. ITEM
UNIT
MEAS
QUAN
EST
UNIT
COST TOTAL
Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost. SF 30000
Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000
Demolish & remove insulation board. Includes labor cost.
SF 60000
Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost. SF 30000
Demolish & remove tapered insulation, rigid. Includes labor.
SF 6000
Demolish & remove existing soffit, metal. Includes labor cost.
SF 1500
Demolish &remove existing soffit, plywood. Includes labor cost.
SF 1500
Demolish & remove CDX plywoodwood decking. Includes labor cost. SF 1500
Demolish & remove wood decking, 1"x 6" to 1"x12"
SF 1500
Demolish & remove wood fascia.
Includes labor cost.
LF 3000
Demolish & remove metal gutter.
Includes labor cost.
LF 1500
Demolish & remove metal downspout. Includes labor cost.
LF 600
Demolish & remove metal deck.
Includes labor cost.
SF 1500
Demolish & remove metal standing seam roof. Includes labor cost.
SF 9000
Demolish & remove metal standing seam facia. Includes labor costs.
SF 600
Demolish & remove metal roof, screw attached. Includes labor and equipment costs.
SF 9000
Demolish & remove metal wall panel/facia. Includes labor cost.
SF 600
Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900
Demolish & Remove poured gypsum deck & formboard.
Includes labor and equipment costs. SF 1500
Demolish and remove extg counterflashing. Includes labor cost. LF 3000
Remove clay tiles from roof and clean. Includes labor and materials. SF 3000
Asbestos abatement, BUR.
Includes labor, equipment and other direct costs. SF 1500
Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.
SF 1500
Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500
Asbestos abatement, sealant.
Includes labor, equipment and any other direct costs. SF 1500
Disposal of ACM as hazardous waste. Includes storage, hauling, dump fee and any other cost.
CY 120
TCLP test, incl sampling, analysis and report. EA 6
Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500
Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l. Includes mtl, lab, equip, hauling and disopsal fee.
SF 1500
Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12
Crane, up to 25 Ton, daily charge (move large rooftop equip).
Includes equipment rental and operation costs. DAY 4
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, <
15,000 SF SF 15000
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >=
15,000 SF SF 15000
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, < 15,000 SF SF 7500
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >= 15,000 SF SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000
SF SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >=
15,000 SF SF 7500
Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000
Install vented base sheet. Includes materials and labor costs.
SF 18000
Install relief vent. Include materials and labor costs.
EA 12
Install new metal fascia, to 6" width.
Includes labor and materials cost.
LF 600
Install new metal fascia, to 12" width. Includes labor and materials.
LF 600
Install new metal fascia, to 18" width. Includes labor and materials.
LF 600
Install new metal parapet coping/capflashing, to 12" wall.
Includes labor and materials. LF 600
Install new metal parapet coping/capflashing, upto 18".
Includes labor and materials. LF 600
Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs. SF 3000
Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000
Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000
Install new insulation, poly-iso/polystyrene, per inch thickness.
R=5 per inch. Includes labor and materials costs. SF 40000
Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.
Includes labor and materials costs.
SF 12000
Install new insulation, 1" perlite.
Includes labor and material costs.
SF 30000
Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material. SF 20000
Install new batt insulation, foil faced, to 9" R=30. Includes labor and material. SF 9000
Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x12".
Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x8".
Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x12".
Includes labor, materials, equipment & any other cost. LF 1000
Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost.
SF 1500
Install new wood decking, 1" nominal lumber. Includes labor and material. SF 1500
Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500
Install new Thermoplastic flashing.
Includes labor, material, and equipment. LF 1500
Install new PVC clad metal flashing.
Includes labor, material, and equipment. LF 1500
Install new wood 4"x4" cant strip.
Includes labor and material.
LF 1500
Install new fiber 4"x4" cant Strip.
Includes labor and material.
LF 1500
Install new pre finished metal gutter, upto 18" girth- surface mounted. Includes labor and material. LF 1500
Install new metal gutter, upto 24" girth, built-in. Includes labor and material. LF 1500
Install new metal downspout, 4"x6".
Includes labor and material.
LF 1500
Install new concrete splashblock upto 1'x2'. Includes labor and material. EA 12
Install new expansion joint.
Includes labor and material.
LF 120
Install new sheet metal pitch pan.
Includes labor and material.
EA 24
Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar.
Includes labor and material. LF 3000
Install new lead flashing jack, to 8" diameter. Include labor & material.
EA 6
Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300
Install new metal gravel guard.
Include labor & material.
LF 1500
Install new metal drip edge. Include labor & material.
LF 1500
Install new lightweight conc deck.
Include labor, material, equipment and anyother cost. SF 450
Install new metal deck. Include labor, material, equipment and anyother cost. SF 1500
Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12
Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12
Install flexible bellows to 4" roof drain. Includes material and labor.
EA 12
Install flexible bellows to 6" roof drain. Includes material and labor cost. EA 12
Install new traffic pads. Include labor & material cost.
SF 300
Install new wood curbs upto 2"x10".
Include labor & material cost.
EA 10
Install new pre-fab metal curb.
Include labor & material cost.
EA 10
Install new pre-fab insulated metal curb. Include labor & material cost.
EA 10
Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted.
Include labor, material, equipment and any other cost. EA 2
Install new scupper. Include labor & material cost.
EA 12
Install new scupper w/ strainer.
Include labor & material cost.
EA 12
Install new standing seam metal roof, concealed fasteners. Include labor & material cost.
SF 12000
Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000
Install new metal base/valley/ridge/counter flashing.
Includes labor and material. LF 12000
Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10
Install new metal flashing collar, to 8" diameter. Include labor & material cost. EA 15
Install new metal flashing collar, to 12" diameter. Include labor & material cost. EA 15
Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300
Install fiber glass shingles. Include labor & material.
SF 18000
Install #15 felt underlayment.
Include labor & material.
SF 18000
Apply elastomeric coating to roof.
Includes labor, material, and equipment. SF 5000
Reinstall existing clay tiles.
Includes labor and materials.
SF 3000
Install new clay tiles . Includes labor and materials.
SF 3000
Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3
Remove and reinstall existing light equipment. Include labor & material cost. EA 6
Install new metal roof jack for gooseneck. Includes labor and material. EA 30
Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.
LF 120
Install new pressure treated wood nailer 2"x4". Include labor and material costs. LF 1200
Install new pressure treated wood nailer 2"x6". Include labor and material costs. LF 1200
Install new pressure treated wood nailer 2"x8". Include labor and material costs. LF 1500
Install new pressure treated wood nailer 2"x10". Include labor and material costs. LF 1500
Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost. SF 12000
Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 600
Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 900
Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost CY 600
2115 Mobilization of coring machine LS 1 2116 Core drill 4" hole in concrete wall IN 50 2117 Install 4" PVC roof drain pipine with clevis hangers
LF 150
2118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation
2119 Powerwash surface SF 5000
TOTAL 2nd OPTION YEAR COST
3RD OPTION YEAR (1 NOV 2016 – 31 OCT 2017)
LINE NO. ITEM
UNIT
MEAS
QUAN
EST
UNIT
COST TOTAL
Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost.
SF 30000
Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000
Demolish & remove insulation board.
Includes labor cost.
SF 60000
Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.
SF 30000
Demolish & remove tapered insulation, rigid. Includes labor.
SF 6000
Demolish & remove existing soffit, metal. Includes labor cost.
SF 1500
Demolish &remove existing soffit, plywood. Includes labor cost.
SF 1500
Demolish & remove CDX plywoodwood decking. Includes labor cost.
SF 1500
Demolish & remove wood decking, 1"x 6" to 1"x12"
SF 1500
Demolish & remove wood fascia.
Includes labor cost.
LF 3000
Demolish & remove metal gutter.
Includes labor cost.
LF 1500
Demolish & remove metal downspout.
Includes labor cost.
LF 600
Demolish & remove metal deck.
Includes labor cost.
SF 1500
Demolish & remove metal standing seam roof. Includes labor cost.
SF 9000
Demolish & remove metal standing seam facia. Includes labor costs.
SF 600
Demolish & remove metal roof, screw attached. Includes labor and equipment costs.
SF 9000
Demolish & remove metal wall panel/facia. Includes labor cost.
SF 600
Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900
Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.
Demolish and remove extg counterflashing. Includes labor cost.
LF 3000
Remove clay tiles from roof and clean.
Includes labor and materials.
SF 3000
Asbestos abatement, BUR. Includes labor, equipment and other direct costs.
SF 1500
Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.
SF 1500
Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500
Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500
Disposal of ACM as hazardous waste.
Includes storage, hauling, dump fee and any other cost.
CY 120
TCLP test, incl sampling, analysis and report. EA 6
Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500
Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.
Includes mtl, lab, equip, hauling and disopsal fee.
SF 1500
Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12
Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs.
DAY 4
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF
SF 15000
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF
SF 15000
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <
15,000 SF SF 7500
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=
15,000 SF SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF
SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF
SF 7500
Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000
Install vented base sheet. Includes materials and labor costs.
SF 18000
Install relief vent. Include materials and labor costs.
EA 12
Install new metal fascia, to 6" width.
Includes labor and materials cost.
LF 600
Install new metal fascia, to 12" width.
Includes labor and materials.
LF 600
Install new metal fascia, to 18" width.
Includes labor and materials.
LF 600
Install new metal parapet coping/capflashing, to 12" wall. Includes labor and materials. LF 600
Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600
Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs.
SF 3000
Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000
Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000
Install new insulation, poly-iso/polystyrene, per inch thickness. R=5 per inch. Includes labor and materials costs. SF 40000
Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.
Includes labor and materials costs.
SF 12000
Install new insulation, 1" perlite.
Includes labor and material costs.
SF 30000
Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.
SF 20000
Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.
SF 9000
Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x8".
Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x12".
Includes labor, materials, equipment & any other cost. LF 1000
Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost.
SF 1500
Install new wood decking, 1" nominal lumber. Includes labor and material.
SF 1500
Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500
Install new Thermoplastic flashing.
Includes labor, material, and equipment. LF 1500
Install new PVC clad metal flashing.
Includes labor, material, and equipment. LF 1500
Install new wood 4"x4" cant strip.
Includes labor and material.
LF 1500
Install new fiber 4"x4" cant Strip.
Includes labor and material.
LF 1500
Install new pre finished metal gutter, upto 18" girth- surface mounted.
Includes labor and material.
LF 1500
Install new metal gutter, upto 24" girth, built-in. Includes labor and material.
LF 1500
Install new metal downspout, 4"x6".
Includes labor and material.
LF 1500
Install new concrete splashblock upto 1'x2'. Includes labor and material.
EA 12
Install new expansion joint. Includes labor and material.
LF 120
Install new sheet metal pitch pan.
Includes labor and material.
EA 24
Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar. Includes labor and material. LF 3000
Install new lead flashing jack, to 8" diameter. Include labor & material.
EA 6
Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300
Install new metal gravel guard. Include labor & material.
LF 1500
Install new metal drip edge. Include labor & material.
LF 1500
Install new lightweight conc deck.
Include labor, material, equipment and anyother cost. SF 450
Install new metal deck. Include labor, material, equipment and anyother cost.
SF 1500
Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12
Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12
Install flexible bellows to 4" roof drain.
Includes material and labor.
EA 12
Install flexible bellows to 6" roof drain.
Includes material and labor cost.
EA 12
Install new traffic pads. Include labor & material cost.
SF 300
Install new wood curbs upto 2"x10".
Include labor & material cost.
EA 10
Install new pre-fab metal curb. Include labor & material cost.
EA 10
Install new pre-fab insulated metal curb.
Include labor & material cost.
EA 10
Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost.
EA 2
Install new scupper. Include labor & material cost.
EA 12
Install new scupper w/ strainer. Include labor & material cost.
EA 12
Install new standing seam metal roof, concealed fasteners. Include labor & material cost.
SF 12000
Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000
Install new metal base/valley/ridge/counter flashing.
Includes labor and material. LF 12000
Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10
Install new metal flashing collar, to 8" diameter. Include labor & material cost.
EA 15
Install new metal flashing collar, to 12" diameter. Include labor & material cost.
EA 15
Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300
Install fiber glass shingles. Include labor & material.
SF 18000
Install #15 felt underlayment. Include labor & material.
SF 18000
Apply elastomeric coating to roof.
Includes labor, material, and equipment. SF 5000
Reinstall existing clay tiles. Includes labor and materials.
SF 3000
Install new clay tiles . Includes labor and materials.
SF 3000
Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3
Remove and reinstall existing light equipment. Include labor & material cost. EA 6
Install new metal roof jack for gooseneck. Includes labor and material.
EA 30
Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.
LF 120
Install new pressure treated wood nailer 2"x4". Include labor and material costs.
LF 1200
Install new pressure treated wood nailer 2"x6". Include labor and material costs.
LF 1200
Install new pressure treated wood nailer 2"x8". Include labor and material costs.
LF 1500
Install new pressure treated wood nailer 2"x10". Include labor and material costs. LF 1500
Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost. SF 12000
Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost
CY 600
Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost
CY 900
Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost CY 600
3115 Mobilization of coring machine LS 1 3116 Core drill 4" hole in concrete wall IN 50 3117 Install 4" PVC roof drain pipine with clevis hangers
3118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation
3119 Powerwash surface SF 5000
TOTAL 3rd OPTION YEAR COST
4TH OPTION YEAR (1 NOV 2017 – 31 OCT 2018)
LINE NO. ITEM
UNIT
MEAS
QUAN
EST
UNIT
COST TOTAL
Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost.
SF 30000
Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000
Demolish & remove insulation board.
Includes labor cost.
SF 60000
Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.
SF 30000
Demolish & remove tapered insulation, rigid. Includes labor.
SF 6000
Demolish & remove existing soffit, metal. Includes labor cost.
SF 1500
Demolish &remove existing soffit, plywood. Includes labor cost.
SF 1500
Demolish & remove CDX plywoodwood decking. Includes labor cost.
SF 1500
Demolish & remove wood decking, 1"x 6" to 1"x12"
SF 1500
Demolish & remove wood fascia.
Includes labor cost.
LF 3000
Demolish & remove metal gutter.
Includes labor cost.
LF 1500
Demolish & remove metal downspout.
Includes labor cost.
LF 600
Demolish & remove metal deck.
Includes labor cost.
Demolish & remove metal standing seam roof. Includes labor cost.
SF 9000
Demolish & remove metal standing seam facia. Includes labor costs.
SF 600
Demolish & remove metal roof, screw attached. Includes labor and equipment costs.
SF 9000
Demolish & remove metal wall panel/facia. Includes labor cost.
SF 600
Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900
Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.
SF 1500
Demolish and remove extg counterflashing. Includes labor cost.
LF 3000
Remove clay tiles from roof and clean.
Includes labor and materials.
SF 3000
Asbestos abatement, BUR. Includes labor, equipment and other direct costs.
SF 1500
Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.
SF 1500
Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500
Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500
Disposal of ACM as hazardous waste.
Includes storage, hauling, dump fee and any other cost.
CY 120
TCLP test, incl sampling, analysis and report. EA 6
Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500
Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.
Includes mtl, lab, equip, hauling and disopsal fee.
SF 1500
Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12
Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs.
DAY 4
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF
SF 15000
Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF
SF 15000
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <
15,000 SF SF 7500
Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=
15,000 SF SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF
SF 7500
Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF
SF 7500
Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000
Install vented base sheet. Includes materials and labor costs.
SF 18000
Install relief vent. Include materials and labor costs.
EA 12
Install new metal fascia, to 6" width.
Includes labor and materials cost.
LF 600
Install new metal fascia, to 12" width.
Includes labor and materials.
LF 600
Install new metal fascia, to 18" width.
Includes labor and materials.
LF 600
Install new metal parapet coping/capflashing, to 12" wall.
Includes labor and materials. LF 600
Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600
Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs.
SF 3000
Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000
Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000
Install new insulation, poly-iso/polystyrene, per inch thickness. R=5 per inch. Includes labor and materials costs. SF 40000
Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.
Includes labor and materials costs.
SF 12000
Install new insulation, 1" perlite.
Includes labor and material costs.
SF 30000
Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.
SF 20000
Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.
SF 9000
Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000
Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x8".
Includes labor, materials, equipment & any other cost. LF 1000
Install wood runner/facia 2"x12".
Includes labor, materials, equipment & any other cost. LF 1000
Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost.
SF 1500
Install new wood decking, 1" nominal lumber. Includes labor and material.
SF 1500
Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500
Install new Thermoplastic flashing.
Includes labor, material, and equipment. LF 1500
Install new PVC clad metal flashing.
Includes labor, material, and equipment. LF 1500
Install new wood 4"x4" cant strip.
Includes labor and material.
LF 1500
Install new fiber 4"x4" cant Strip.
Includes labor and material.
LF 1500
Install new pre finished metal gutter, upto 18" girth- surface mounted.
Includes labor and material.
LF 1500
Install new metal gutter, upto 24" girth, built-in. Includes labor and material.
LF 1500
Install new metal downspout, 4"x6".
Includes labor and material.
LF 1500
Install new concrete splashblock upto 1'x2'. Includes labor and material.
EA 12
Install new expansion joint. Includes labor and material.
LF 120
Install new sheet metal pitch pan.
Includes labor and material.
EA 24
Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar. Includes labor and material. LF 3000
Install new lead flashing jack, to 8" diameter. Include labor & material.
EA 6
Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300
Install new metal gravel guard. Include labor & material.
LF 1500
Install new metal drip edge. Include labor & material.
LF 1500
Install new lightweight conc deck.
Include labor, material, equipment and anyother cost. SF 450
Install new metal deck. Include labor, material, equipment and anyother cost.
SF 1500
Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12
Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12
Install flexible bellows to 4" roof drain.
Includes material and labor.
EA 12
Install flexible bellows to 6" roof drain.
Includes material and labor cost.
EA 12
Install new traffic pads. Include labor & material cost.
SF 300
Install new wood curbs upto 2"x10".
Include labor & material cost.
EA 10
Install new pre-fab metal curb. Include labor & material cost.
EA 10
Install new pre-fab insulated metal curb.
Include labor & material cost.
EA 10
Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost.
EA 2
Install new scupper. Include labor & material cost.
EA 12
Install new scupper w/ strainer. Include labor & material cost.
EA 12
Install new standing seam metal roof, concealed fasteners. Include labor & material cost.
SF 12000
Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000
Install new metal base/valley/ridge/counter flashing.
Includes labor and material. LF 12000
Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10
Install new metal flashing collar, to 8" diameter. Include labor & material cost.
EA 15
Install new metal flashing collar, to 12" diameter. Include labor & material cost.
EA 15
Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300
Install fiber glass shingles. Include labor & material.
SF 18000
Install #15 felt underlayment. Include labor & material.
SF 18000
Apply elastomeric coating to roof.
Includes labor,…