Solicitation No.: FA4608-R-0005 Attachment 1

BASE YEAR (1 NOV 2013 – 31 OCT 2014)

LINE

NO. ITEM

UNIT

MEAS QUAN EST

UNIT

COST TOTAL

Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost. SF 30000

Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000

Demolish & remove insulation board.

Includes labor cost.

SF 60000

Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.

SF 30000

Demolish & remove tapered insulation, rigid. Includes labor.

SF 6000

Demolish & remove existing soffit, metal. Includes labor cost.

SF 1500

Demolish &remove existing soffit, plywood. Includes labor cost.

SF 1500

Demolish & remove CDX plywoodwood decking. Includes labor cost.

SF 1500

Demolish & remove wood decking, 1"x 6" to 1"x12"

SF 1500

Demolish & remove wood fascia.

Includes labor cost.

LF 3000

Demolish & remove metal gutter.

Includes labor cost.

LF 1500

Demolish & remove metal downspout.

Includes labor cost.

LF 600

Demolish & remove metal deck.

Includes labor cost.

SF 1500

Demolish & remove metal standing seam roof. Includes labor cost.

SF 9000

Demolish & remove metal standing seam facia. Includes labor costs.

SF 600

Demolish & remove metal roof, screw attached. Includes labor and equipment costs. SF 9000

Demolish & remove metal wall panel/facia. Includes labor cost.

SF 600

Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900

Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.

SF 1500

Demolish and remove extg counterflashing. Includes labor cost.

LF 3000

Remove clay tiles from roof and clean.

Includes labor and materials.

SF 3000

Asbestos abatement, BUR. Includes labor, equipment and other direct costs. SF 1500

Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.

SF 1500

Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500

Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500

Disposal of ACM as hazardous waste.

Includes storage, hauling, dump fee and any other cost. CY 120

TCLP test, incl sampling, analysis and report.

EA 6

Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500

Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.

Includes mtl, lab, equip, hauling and disopsal fee.

SF 1500

Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12

Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs. DAY 4

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF SF 15000

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF SF 15000

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <

15,000 SF SF 7500

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=

15,000 SF SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF

SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF SF 7500

Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000

Install vented base sheet. Includes materials and labor costs.

SF 18000

Install relief vent. Include materials and labor costs.

EA 12

Install new metal fascia, to 6" width.

Includes labor and materials cost.

LF 600

Install new metal fascia, to 12" width.

Includes labor and materials.

LF 600

Install new metal fascia, to 18" width.

Includes labor and materials.

LF 600

Install new metal parapet coping/capflashing, to 12" wall.

Includes labor and materials. LF 600

Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600

Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs. SF 3000

Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000

Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000

Install new insulation, poly-iso/polystyrene, per inch thickness.

SF 40000

R=5 per inch. Includes labor and materials costs.

Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.

Includes labor and materials costs. SF 12000

Install new insulation, 1" perlite.

Includes labor and material costs.

SF 30000

Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.

SF 20000

Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.

SF 9000

Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000

00556

Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000

00058

Install wood runner/facia 2"x8".

Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x12".

Includes labor, materials, equipment & any other cost. LF 1000

Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost. SF 1500

Install new wood decking, 1" nominal lumber. Includes labor and material.

SF 1500

Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500

Install new Thermoplastic flashing.

Includes labor, material, and equipment. LF 1500

Install new PVC clad metal flashing.

Includes labor, material, and equipment. LF 1500

Install new wood 4"x4" cant strip.

Includes labor and material.

LF 1500

Install new fiber 4"x4" cant Strip.

Includes labor and material.

LF 1500

Install new pre finished metal gutter, upto 18" girth- surface mounted.

Includes labor and material. LF 1500

Install new metal gutter, upto 24" girth, built-in. Includes labor and material.

LF 1500

Install new metal downspout, 4"x6".

Includes labor and material.

LF 1500

Install new concrete splashblock upto 1'x2'. Includes labor and material.

EA 12

Install new expansion joint. Includes labor and material.

LF 120

Install new sheet metal pitch pan.

Includes labor and material.

EA 24

Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar.

Includes labor and material. LF 3000

Install new lead flashing jack, to 8" diameter. Include labor & material.

EA 6

Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300

Install new metal gravel guard. Include labor & material.

LF 1500

Install new metal drip edge. Include labor & material.

LF 1500

Install new lightweight conc deck.

Include labor, material, equipment and anyother cost. SF 450

Install new metal deck. Include labor, material, equipment and anyother cost.

SF 1500

Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12

Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12

Install flexible bellows to 4" roof drain.

Includes material and labor.

EA 12

Install flexible bellows to 6" roof drain.

Includes material and labor cost.

EA 12

Install new traffic pads. Include labor & material cost.

SF 300

Install new wood curbs upto 2"x10".

Include labor & material cost.

EA 10

Install new pre-fab metal curb. Include labor & material cost.

EA 10

Install new pre-fab insulated metal curb. Include labor & material cost.

EA 10

Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost. EA 2

Install new scupper. Include labor & material cost.

EA 12

Install new scupper w/ strainer.

Include labor & material cost.

EA 12

Install new standing seam metal roof, concealed fasteners. Include labor & material cost. SF 12000

Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000

Install new metal base/valley/ridge/counter flashing.

Includes labor and material. LF 12000

Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10

Install new metal flashing collar, to 8" diameter. Include labor & material cost. EA 15

Install new metal flashing collar, to 12" diameter. Include labor & material cost.

EA 15

Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300

Install fiber glass shingles. Include labor & material.

SF 18000

Install #15 felt underlayment. Include labor & material.

SF 18000

Apply elastomeric coating to roof.

Includes labor, material, and equipment. SF 5000

Reinstall existing clay tiles. Includes labor and materials.

SF 3000

Install new clay tiles . Includes labor and materials.

SF 3000

Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3

Remove and reinstall existing light equipment. Include labor & material cost. EA 6

Install new metal roof jack for gooseneck. Includes labor and material. EA 30

Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.

LF 120

Install new pressure treated wood nailer 2"x4". Include labor and material costs. LF 1200

Install new pressure treated wood nailer 2"x6". Include labor and material costs. LF 1200

Install new pressure treated wood nailer 2"x8". Include labor and material costs. LF 1500

Install new pressure treated wood nailer 2"x10". Include labor and material costs. LF 1500

Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost. SF 12000

Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 600

Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 900

Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost CY 600

0115 Mobilization of coring machine LS 1 0116 Core drill 4" hole in concrete wall IN 50 0117 Install 4" PVC roof drain pipine with clevis hangers

LF 150

0118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation

LF 150

0119 Powerwash surface SF 5000

TOTAL BASE YEAR COST

1ST OPTION YEAR (1 NOV 2014 – 31 OCT 2015)

NO. ITEM

UNIT

MEAS

QUAN

EST

UNIT

COST TOTAL

Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost.

SF 30000

Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000

Demolish & remove insulation board.

Includes labor cost.

SF 60000

Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.

SF 30000

Demolish & remove tapered insulation, rigid. Includes labor.

SF 6000

Demolish & remove existing soffit, metal.

Includes labor cost.

SF 1500

Demolish &remove existing soffit, plywood. Includes labor cost.

SF 1500

Demolish & remove CDX plywoodwood decking. Includes labor cost.

SF 1500

Demolish & remove wood decking, 1"x 6" to 1"x12"

SF 1500

Demolish & remove wood fascia.

Includes labor cost.

LF 3000

Demolish & remove metal gutter.

Includes labor cost.

LF 1500

Demolish & remove metal downspout.

Includes labor cost.

LF 600

Demolish & remove metal deck.

Includes labor cost.

SF 1500

Demolish & remove metal standing seam roof. Includes labor cost.

SF 9000

Demolish & remove metal standing seam facia. Includes labor costs.

SF 600

Demolish & remove metal roof, screw attached. Includes labor and equipment costs.

SF 9000

Demolish & remove metal wall panel/facia. Includes labor cost.

SF 600

Demolish & Remove lightweight concrete deck. Includes labor and equipment cost.

SF 900

Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.

SF 1500

Demolish and remove extg counterflashing. Includes labor cost.

LF 3000

Remove clay tiles from roof and clean.

Includes labor and materials.

SF 3000

Asbestos abatement, BUR. Includes labor, equipment and other direct costs.

SF 1500

Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.

SF 1500

Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500

Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500

Disposal of ACM as hazardous waste.

Includes storage, hauling, dump fee and any other cost.

CY 120

TCLP test, incl sampling, analysis and report. EA 6

Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor.

SF 1500

Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.

Includes mtl, lab, equip, hauling and disopsal fee.

SF 1500

Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12

Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs.

DAY 4

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF

SF 15000

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF

SF 15000

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <

15,000 SF SF 7500

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=

15,000 SF SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF

SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF

SF 7500

Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost.

LF 15000

Install vented base sheet. Includes materials and labor costs.

SF 18000

Install relief vent. Include materials and labor costs.

EA 12

Install new metal fascia, to 6" width.

Includes labor and materials cost.

LF 600

Install new metal fascia, to 12" width.

Includes labor and materials.

LF 600

Install new metal fascia, to 18" width.

Includes labor and materials.

LF 600

Install new metal parapet coping/capflashing, to 12" wall. Includes labor and materials. LF 600

Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600

Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs.

SF 3000

Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000

Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000

Install new insulation, poly-iso/polystyrene, per inch thickness. R=5 per inch. Includes labor and materials costs. SF 40000

Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.

Includes labor and materials costs.

SF 12000

Install new insulation, 1" perlite. Includes labor and material costs.

SF 30000

Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.

SF 20000

Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.

SF 9000

Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x8". Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x12".

Includes labor, materials, equipment & any other cost. LF 1000

Install new CDX plywood decking, to 5/8"

th. Includes labor, materials, equipment & any other cost.

SF 1500

Install new wood decking, 1" nominal lumber. Includes labor and material.

SF 1500

Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500

Install new Thermoplastic flashing.

Includes labor, material, and equipment. LF 1500

Install new PVC clad metal flashing.

Includes labor, material, and equipment. LF 1500

Install new wood 4"x4" cant strip.

Includes labor and material.

LF 1500

Install new fiber 4"x4" cant Strip.

Includes labor and material.

LF 1500

Install new pre finished metal gutter, upto 18" girth- surface mounted. Includes labor and material.

LF 1500

Install new metal gutter, upto 24" girth, built-in. Includes labor and material.

LF 1500

Install new metal downspout, 4"x6".

Includes labor and material.

LF 1500

Install new concrete splashblock upto 1'x2'. Includes labor and material.

EA 12

Install new expansion joint. Includes labor and material.

LF 120

Install new sheet metal pitch pan.

Includes labor and material.

EA 24

Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar. Includes labor and material. LF 3000

Install new lead flashing jack, to 8" diameter. Include labor & material.

EA 6

Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300

Install new metal gravel guard. Include labor & material.

LF 1500

Install new metal drip edge. Include labor & material.

LF 1500

Install new lightweight conc deck.

Include labor, material, equipment and anyother cost. SF 450

Install new metal deck. Include labor, material, equipment and anyother cost.

SF 1500

Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12

Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12

Install flexible bellows to 4" roof drain.

Includes material and labor.

EA 12

Install flexible bellows to 6" roof drain.

Includes material and labor cost.

EA 12

Install new traffic pads. Include labor & material cost.

SF 300

Install new wood curbs upto 2"x10".

Include labor & material cost.

EA 10

Install new pre-fab metal curb. Include labor & material cost.

EA 10

Install new pre-fab insulated metal curb.

Include labor & material cost.

EA 10

Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost.

EA 2

Install new scupper. Include labor & material cost.

EA 12

Install new scupper w/ strainer. Include labor & material cost.

EA 12

Install new standing seam metal roof, concealed fasteners. Include labor & material cost.

SF 12000

Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost

SF 12000

Install new metal base/valley/ridge/counter flashing.

Includes labor and material. LF 12000

Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10

Install new metal flashing collar, to 8" diameter. Include labor & material cost.

EA 15

Install new metal flashing collar, to 12" diameter. Include labor & material cost.

EA 15

Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300

Install fiber glass shingles. Include labor & material.

SF 18000

Install #15 felt underlayment. Include labor & material.

SF 18000

Apply elastomeric coating to roof.

Includes labor, material, and equipment.

SF 5000

Reinstall existing clay tiles. Includes labor and materials.

SF 3000

Install new clay tiles . Includes labor and materials.

SF 3000

Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3

Remove and reinstall existing light equipment. Include labor & material cost.

EA 6

Install new metal roof jack for gooseneck.

Includes labor and material.

EA 30

Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.

LF 120

Install new pressure treated wood nailer 2"x4". Include labor and material costs.

LF 1200

Install new pressure treated wood nailer 2"x6". Include labor and material costs.

LF 1200

Install new pressure treated wood nailer 2"x8". Include labor and material costs.

LF 1500

Install new pressure treated wood nailer 2"x10". Include labor and material costs.

LF 1500

Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost.

SF 12000

Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost

CY 600

Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost

CY 900

Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost

CY 600

1115 Mobilization of coring machine LS 1 1116 Core drill 4" hole in concrete wall IN 50 1117 Install 4" PVC roof drain pipine with clevis hangers

LF 150

1118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation

1119 Powerwash surface SF 5000

TOTAL 1st OPTION YEAR COST

2ND OPTION YEAR (1 NOV 2015 – 31 OCT 2016)

NO. ITEM

UNIT

MEAS

QUAN

EST

UNIT

COST TOTAL

Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost. SF 30000

Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000

Demolish & remove insulation board. Includes labor cost.

SF 60000

Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost. SF 30000

Demolish & remove tapered insulation, rigid. Includes labor.

SF 6000

Demolish & remove existing soffit, metal. Includes labor cost.

SF 1500

Demolish &remove existing soffit, plywood. Includes labor cost.

SF 1500

Demolish & remove CDX plywoodwood decking. Includes labor cost. SF 1500

Demolish & remove wood decking, 1"x 6" to 1"x12"

SF 1500

Demolish & remove wood fascia.

Includes labor cost.

LF 3000

Demolish & remove metal gutter.

Includes labor cost.

LF 1500

Demolish & remove metal downspout. Includes labor cost.

LF 600

Demolish & remove metal deck.

Includes labor cost.

SF 1500

Demolish & remove metal standing seam roof. Includes labor cost.

SF 9000

Demolish & remove metal standing seam facia. Includes labor costs.

SF 600

Demolish & remove metal roof, screw attached. Includes labor and equipment costs.

SF 9000

Demolish & remove metal wall panel/facia. Includes labor cost.

SF 600

Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900

Demolish & Remove poured gypsum deck & formboard.

Includes labor and equipment costs. SF 1500

Demolish and remove extg counterflashing. Includes labor cost. LF 3000

Remove clay tiles from roof and clean. Includes labor and materials. SF 3000

Asbestos abatement, BUR.

Includes labor, equipment and other direct costs. SF 1500

Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.

SF 1500

Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500

Asbestos abatement, sealant.

Includes labor, equipment and any other direct costs. SF 1500

Disposal of ACM as hazardous waste. Includes storage, hauling, dump fee and any other cost.

CY 120

TCLP test, incl sampling, analysis and report. EA 6

Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500

Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l. Includes mtl, lab, equip, hauling and disopsal fee.

SF 1500

Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12

Crane, up to 25 Ton, daily charge (move large rooftop equip).

Includes equipment rental and operation costs. DAY 4

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, <

15,000 SF SF 15000

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >=

15,000 SF SF 15000

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, < 15,000 SF SF 7500

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >= 15,000 SF SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000

SF SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >=

15,000 SF SF 7500

Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000

Install vented base sheet. Includes materials and labor costs.

SF 18000

Install relief vent. Include materials and labor costs.

EA 12

Install new metal fascia, to 6" width.

Includes labor and materials cost.

LF 600

Install new metal fascia, to 12" width. Includes labor and materials.

LF 600

Install new metal fascia, to 18" width. Includes labor and materials.

LF 600

Install new metal parapet coping/capflashing, to 12" wall.

Includes labor and materials. LF 600

Install new metal parapet coping/capflashing, upto 18".

Includes labor and materials. LF 600

Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs. SF 3000

Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000

Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000

Install new insulation, poly-iso/polystyrene, per inch thickness.

R=5 per inch. Includes labor and materials costs. SF 40000

Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.

Includes labor and materials costs.

SF 12000

Install new insulation, 1" perlite.

Includes labor and material costs.

SF 30000

Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material. SF 20000

Install new batt insulation, foil faced, to 9" R=30. Includes labor and material. SF 9000

Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x12".

Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x8".

Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x12".

Includes labor, materials, equipment & any other cost. LF 1000

Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost.

SF 1500

Install new wood decking, 1" nominal lumber. Includes labor and material. SF 1500

Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500

Install new Thermoplastic flashing.

Includes labor, material, and equipment. LF 1500

Install new PVC clad metal flashing.

Includes labor, material, and equipment. LF 1500

Install new wood 4"x4" cant strip.

Includes labor and material.

LF 1500

Install new fiber 4"x4" cant Strip.

Includes labor and material.

LF 1500

Install new pre finished metal gutter, upto 18" girth- surface mounted. Includes labor and material. LF 1500

Install new metal gutter, upto 24" girth, built-in. Includes labor and material. LF 1500

Install new metal downspout, 4"x6".

Includes labor and material.

LF 1500

Install new concrete splashblock upto 1'x2'. Includes labor and material. EA 12

Install new expansion joint.

Includes labor and material.

LF 120

Install new sheet metal pitch pan.

Includes labor and material.

EA 24

Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar.

Includes labor and material. LF 3000

Install new lead flashing jack, to 8" diameter. Include labor & material.

EA 6

Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300

Install new metal gravel guard.

Include labor & material.

LF 1500

Install new metal drip edge. Include labor & material.

LF 1500

Install new lightweight conc deck.

Include labor, material, equipment and anyother cost. SF 450

Install new metal deck. Include labor, material, equipment and anyother cost. SF 1500

Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12

Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12

Install flexible bellows to 4" roof drain. Includes material and labor.

EA 12

Install flexible bellows to 6" roof drain. Includes material and labor cost. EA 12

Install new traffic pads. Include labor & material cost.

SF 300

Install new wood curbs upto 2"x10".

Include labor & material cost.

EA 10

Install new pre-fab metal curb.

Include labor & material cost.

EA 10

Install new pre-fab insulated metal curb. Include labor & material cost.

EA 10

Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted.

Include labor, material, equipment and any other cost. EA 2

Install new scupper. Include labor & material cost.

EA 12

Install new scupper w/ strainer.

Include labor & material cost.

EA 12

Install new standing seam metal roof, concealed fasteners. Include labor & material cost.

SF 12000

Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000

Install new metal base/valley/ridge/counter flashing.

Includes labor and material. LF 12000

Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10

Install new metal flashing collar, to 8" diameter. Include labor & material cost. EA 15

Install new metal flashing collar, to 12" diameter. Include labor & material cost. EA 15

Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300

Install fiber glass shingles. Include labor & material.

SF 18000

Install #15 felt underlayment.

Include labor & material.

SF 18000

Apply elastomeric coating to roof.

Includes labor, material, and equipment. SF 5000

Reinstall existing clay tiles.

Includes labor and materials.

SF 3000

Install new clay tiles . Includes labor and materials.

SF 3000

Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3

Remove and reinstall existing light equipment. Include labor & material cost. EA 6

Install new metal roof jack for gooseneck. Includes labor and material. EA 30

Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.

LF 120

Install new pressure treated wood nailer 2"x4". Include labor and material costs. LF 1200

Install new pressure treated wood nailer 2"x6". Include labor and material costs. LF 1200

Install new pressure treated wood nailer 2"x8". Include labor and material costs. LF 1500

Install new pressure treated wood nailer 2"x10". Include labor and material costs. LF 1500

Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost. SF 12000

Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 600

Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost CY 900

Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost CY 600

2115 Mobilization of coring machine LS 1 2116 Core drill 4" hole in concrete wall IN 50 2117 Install 4" PVC roof drain pipine with clevis hangers

LF 150

2118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation

2119 Powerwash surface SF 5000

TOTAL 2nd OPTION YEAR COST

3RD OPTION YEAR (1 NOV 2016 – 31 OCT 2017)

LINE NO. ITEM

UNIT

MEAS

QUAN

EST

UNIT

COST TOTAL

Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost.

SF 30000

Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000

Demolish & remove insulation board.

Includes labor cost.

SF 60000

Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.

SF 30000

Demolish & remove tapered insulation, rigid. Includes labor.

SF 6000

Demolish & remove existing soffit, metal. Includes labor cost.

SF 1500

Demolish &remove existing soffit, plywood. Includes labor cost.

SF 1500

Demolish & remove CDX plywoodwood decking. Includes labor cost.

SF 1500

Demolish & remove wood decking, 1"x 6" to 1"x12"

SF 1500

Demolish & remove wood fascia.

Includes labor cost.

LF 3000

Demolish & remove metal gutter.

Includes labor cost.

LF 1500

Demolish & remove metal downspout.

Includes labor cost.

LF 600

Demolish & remove metal deck.

Includes labor cost.

SF 1500

Demolish & remove metal standing seam roof. Includes labor cost.

SF 9000

Demolish & remove metal standing seam facia. Includes labor costs.

SF 600

Demolish & remove metal roof, screw attached. Includes labor and equipment costs.

SF 9000

Demolish & remove metal wall panel/facia. Includes labor cost.

SF 600

Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900

Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.

Demolish and remove extg counterflashing. Includes labor cost.

LF 3000

Remove clay tiles from roof and clean.

Includes labor and materials.

SF 3000

Asbestos abatement, BUR. Includes labor, equipment and other direct costs.

SF 1500

Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.

SF 1500

Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500

Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500

Disposal of ACM as hazardous waste.

Includes storage, hauling, dump fee and any other cost.

CY 120

TCLP test, incl sampling, analysis and report. EA 6

Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500

Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.

Includes mtl, lab, equip, hauling and disopsal fee.

SF 1500

Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12

Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs.

DAY 4

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF

SF 15000

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF

SF 15000

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <

15,000 SF SF 7500

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=

15,000 SF SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF

SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF

SF 7500

Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000

Install vented base sheet. Includes materials and labor costs.

SF 18000

Install relief vent. Include materials and labor costs.

EA 12

Install new metal fascia, to 6" width.

Includes labor and materials cost.

LF 600

Install new metal fascia, to 12" width.

Includes labor and materials.

LF 600

Install new metal fascia, to 18" width.

Includes labor and materials.

LF 600

Install new metal parapet coping/capflashing, to 12" wall. Includes labor and materials. LF 600

Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600

Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs.

SF 3000

Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000

Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000

Install new insulation, poly-iso/polystyrene, per inch thickness. R=5 per inch. Includes labor and materials costs. SF 40000

Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.

Includes labor and materials costs.

SF 12000

Install new insulation, 1" perlite.

Includes labor and material costs.

SF 30000

Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.

SF 20000

Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.

SF 9000

Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x8".

Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x12".

Includes labor, materials, equipment & any other cost. LF 1000

Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost.

SF 1500

Install new wood decking, 1" nominal lumber. Includes labor and material.

SF 1500

Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500

Install new Thermoplastic flashing.

Includes labor, material, and equipment. LF 1500

Install new PVC clad metal flashing.

Includes labor, material, and equipment. LF 1500

Install new wood 4"x4" cant strip.

Includes labor and material.

LF 1500

Install new fiber 4"x4" cant Strip.

Includes labor and material.

LF 1500

Install new pre finished metal gutter, upto 18" girth- surface mounted.

Includes labor and material.

LF 1500

Install new metal gutter, upto 24" girth, built-in. Includes labor and material.

LF 1500

Install new metal downspout, 4"x6".

Includes labor and material.

LF 1500

Install new concrete splashblock upto 1'x2'. Includes labor and material.

EA 12

Install new expansion joint. Includes labor and material.

LF 120

Install new sheet metal pitch pan.

Includes labor and material.

EA 24

Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar. Includes labor and material. LF 3000

Install new lead flashing jack, to 8" diameter. Include labor & material.

EA 6

Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300

Install new metal gravel guard. Include labor & material.

LF 1500

Install new metal drip edge. Include labor & material.

LF 1500

Install new lightweight conc deck.

Include labor, material, equipment and anyother cost. SF 450

Install new metal deck. Include labor, material, equipment and anyother cost.

SF 1500

Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12

Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12

Install flexible bellows to 4" roof drain.

Includes material and labor.

EA 12

Install flexible bellows to 6" roof drain.

Includes material and labor cost.

EA 12

Install new traffic pads. Include labor & material cost.

SF 300

Install new wood curbs upto 2"x10".

Include labor & material cost.

EA 10

Install new pre-fab metal curb. Include labor & material cost.

EA 10

Install new pre-fab insulated metal curb.

Include labor & material cost.

EA 10

Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost.

EA 2

Install new scupper. Include labor & material cost.

EA 12

Install new scupper w/ strainer. Include labor & material cost.

EA 12

Install new standing seam metal roof, concealed fasteners. Include labor & material cost.

SF 12000

Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000

Install new metal base/valley/ridge/counter flashing.

Includes labor and material. LF 12000

Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10

Install new metal flashing collar, to 8" diameter. Include labor & material cost.

EA 15

Install new metal flashing collar, to 12" diameter. Include labor & material cost.

EA 15

Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300

Install fiber glass shingles. Include labor & material.

SF 18000

Install #15 felt underlayment. Include labor & material.

SF 18000

Apply elastomeric coating to roof.

Includes labor, material, and equipment. SF 5000

Reinstall existing clay tiles. Includes labor and materials.

SF 3000

Install new clay tiles . Includes labor and materials.

SF 3000

Remove and reinstall existing heavy equipment. Include labor & material cost. EA 3

Remove and reinstall existing light equipment. Include labor & material cost. EA 6

Install new metal roof jack for gooseneck. Includes labor and material.

EA 30

Install PVC pipe down spout, up to 4" diam. Inlude labor and materials.

LF 120

Install new pressure treated wood nailer 2"x4". Include labor and material costs.

LF 1200

Install new pressure treated wood nailer 2"x6". Include labor and material costs.

LF 1200

Install new pressure treated wood nailer 2"x8". Include labor and material costs.

LF 1500

Install new pressure treated wood nailer 2"x10". Include labor and material costs. LF 1500

Install new 4-ply BUR with ceramic surface mod bit cap sheet. Incl labor, materials, equipment and any other cost. SF 12000

Disposal of shingles roofing complete incl rubbish handling, storage, hauling dump charges and any other cost

CY 600

Disposal or BUR roofing complete incl rubbish handling, storage, hauling dump charges and any other cost

CY 900

Disposal of metal roofing complete incl insulation rubbish handling, storage hauling dump charges and any other cost CY 600

3115 Mobilization of coring machine LS 1 3116 Core drill 4" hole in concrete wall IN 50 3117 Install 4" PVC roof drain pipine with clevis hangers

3118 Insulate 4" PVC insulate 4" PVC pipe with fiberglass insulation

3119 Powerwash surface SF 5000

TOTAL 3rd OPTION YEAR COST

4TH OPTION YEAR (1 NOV 2017 – 31 OCT 2018)

LINE NO. ITEM

UNIT

MEAS

QUAN

EST

UNIT

COST TOTAL

Demolish and remove BUR, 4 ply with gravel, mineral granule, or smooth emulsion surface. Includes labor cost.

SF 30000

Demolish & remove asphalt composition shingles & felt underlayment. Includes labor. SF 30000

Demolish & remove insulation board.

Includes labor cost.

SF 60000

Demolish & remove batt insul, vinyl or foil jacket, to 3". Includes labor cost.

SF 30000

Demolish & remove tapered insulation, rigid. Includes labor.

SF 6000

Demolish & remove existing soffit, metal. Includes labor cost.

SF 1500

Demolish &remove existing soffit, plywood. Includes labor cost.

SF 1500

Demolish & remove CDX plywoodwood decking. Includes labor cost.

SF 1500

Demolish & remove wood decking, 1"x 6" to 1"x12"

SF 1500

Demolish & remove wood fascia.

Includes labor cost.

LF 3000

Demolish & remove metal gutter.

Includes labor cost.

LF 1500

Demolish & remove metal downspout.

Includes labor cost.

LF 600

Demolish & remove metal deck.

Includes labor cost.

Demolish & remove metal standing seam roof. Includes labor cost.

SF 9000

Demolish & remove metal standing seam facia. Includes labor costs.

SF 600

Demolish & remove metal roof, screw attached. Includes labor and equipment costs.

SF 9000

Demolish & remove metal wall panel/facia. Includes labor cost.

SF 600

Demolish & Remove lightweight concrete deck. Includes labor and equipment cost. SF 900

Demolish & Remove poured gypsum deck & formboard. Includes labor and equipment costs.

SF 1500

Demolish and remove extg counterflashing. Includes labor cost.

LF 3000

Remove clay tiles from roof and clean.

Includes labor and materials.

SF 3000

Asbestos abatement, BUR. Includes labor, equipment and other direct costs.

SF 1500

Asbestos abatement, base & valley flashing. Includes labor, equipment and any other direct costs.

SF 1500

Asbestos abatement, copings, gravel stop, drip edge or metal facia. Includes labor, equipment and any other direct costs. SF 1500

Asbestos abatement, sealant. Includes labor, equipment and any other direct costs. SF 1500

Disposal of ACM as hazardous waste.

Includes storage, hauling, dump fee and any other cost.

CY 120

TCLP test, incl sampling, analysis and report. EA 6

Prep and encapsulate lead based painted surfaces, wood or metal, gutters, downspout. Includes material and labor. SF 1500

Demolition & disposal of lead painted components, paint chips when testing indicates disposal as hazardous mat'l.

Includes mtl, lab, equip, hauling and disopsal fee.

SF 1500

Demolition & disposal of lead flashing jacks. Includes labor and other direct costs. EA 12

Crane, up to 25 Ton, daily charge (move large rooftop equip). Includes equipment rental and operation costs.

DAY 4

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, < 15,000 SF

SF 15000

Install new 4-ply BUR with gravel surface. Incl labor, material, equipment and any other cost, >= 15,000 SF

SF 15000

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, <

15,000 SF SF 7500

Install new 4-ply BUR with mineral surface cap sheet. Incl labor, materials, equipment and any other cost, >=

15,000 SF SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, < 15,000 SF

SF 7500

Install new 4-ply BUR with smooth emulsion surface. Incl lab, mtl, equip and any other cost, >= 15,000 SF

SF 7500

Install new Modified Bitumen Membrane base flashing. Includes labor, material, equipment and any other cost. LF 15000

Install vented base sheet. Includes materials and labor costs.

SF 18000

Install relief vent. Include materials and labor costs.

EA 12

Install new metal fascia, to 6" width.

Includes labor and materials cost.

LF 600

Install new metal fascia, to 12" width.

Includes labor and materials.

LF 600

Install new metal fascia, to 18" width.

Includes labor and materials.

LF 600

Install new metal parapet coping/capflashing, to 12" wall.

Includes labor and materials. LF 600

Install new metal parapet coping/capflashing, upto 18". Includes labor and materials. LF 600

Install new perforated/ nonperforated metal soffit, prefinished. Includes labor and materials costs.

SF 3000

Prepare and paint metal surface, base color scheme. Incl labor and materials costs. SF 6000

Prepare and paint wood surface, base color scheme. Includes labor and materials. SF 6000

Install new insulation, poly-iso/polystyrene, per inch thickness. R=5 per inch. Includes labor and materials costs. SF 40000

Install new tapered insulation, poly-iso/polystyrene, 1/8" per ft slope.

Includes labor and materials costs.

SF 12000

Install new insulation, 1" perlite.

Includes labor and material costs.

SF 30000

Install new batt insulation, foil faced, to 3 1/2" R=11. Incl labor & material.

SF 20000

Install new batt insulation, foil faced, to 9" R=30. Includes labor and material.

SF 9000

Install wood fascia, 1"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x8". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 1"x12". Includes labor, materials, equipment & any other cost. LF 1000

Install wood fascia, 2"x4". Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x8".

Includes labor, materials, equipment & any other cost. LF 1000

Install wood runner/facia 2"x12".

Includes labor, materials, equipment & any other cost. LF 1000

Install new CDX plywood decking, to 5/8" th. Includes labor, materials, equipment & any other cost.

SF 1500

Install new wood decking, 1" nominal lumber. Includes labor and material.

SF 1500

Install new Thermoplastic single ply roofing system. Includes labor, material, and equipment. SF 1500

Install new Thermoplastic flashing.

Includes labor, material, and equipment. LF 1500

Install new PVC clad metal flashing.

Includes labor, material, and equipment. LF 1500

Install new wood 4"x4" cant strip.

Includes labor and material.

LF 1500

Install new fiber 4"x4" cant Strip.

Includes labor and material.

LF 1500

Install new pre finished metal gutter, upto 18" girth- surface mounted.

Includes labor and material.

LF 1500

Install new metal gutter, upto 24" girth, built-in. Includes labor and material.

LF 1500

Install new metal downspout, 4"x6".

Includes labor and material.

LF 1500

Install new concrete splashblock upto 1'x2'. Includes labor and material.

EA 12

Install new expansion joint. Includes labor and material.

LF 120

Install new sheet metal pitch pan.

Includes labor and material.

EA 24

Install new sheet metal counterflashing, in reglet, or face mounted type with pressure bar. Includes labor and material. LF 3000

Install new lead flashing jack, to 8" diameter. Include labor & material.

EA 6

Install new redwood, 4"x4". Include labor, material, equipment & any other cost. LF 300

Install new metal gravel guard. Include labor & material.

LF 1500

Install new metal drip edge. Include labor & material.

LF 1500

Install new lightweight conc deck.

Include labor, material, equipment and anyother cost. SF 450

Install new metal deck. Include labor, material, equipment and anyother cost.

SF 1500

Install new roof drain 4" w/strainer/clamping collar. Include labor & material cost. EA 12

Install new roof drain 6" w/strainer/clamping collar. Include labor & material cost. EA 12

Install flexible bellows to 4" roof drain.

Includes material and labor.

EA 12

Install flexible bellows to 6" roof drain.

Includes material and labor cost.

EA 12

Install new traffic pads. Include labor & material cost.

SF 300

Install new wood curbs upto 2"x10".

Include labor & material cost.

EA 10

Install new pre-fab metal curb. Include labor & material cost.

EA 10

Install new pre-fab insulated metal curb.

Include labor & material cost.

EA 10

Install new roof hatch w/ curb & cover upto 2-6"X4'-0", painted. Include labor, material, equipment and any other cost.

EA 2

Install new scupper. Include labor & material cost.

EA 12

Install new scupper w/ strainer. Include labor & material cost.

EA 12

Install new standing seam metal roof, concealed fasteners. Include labor & material cost.

SF 12000

Install new preformed metal roofing, screw attached on purlins. Include labor, material, equipment & any other cost SF 12000

Install new metal base/valley/ridge/counter flashing.

Includes labor and material. LF 12000

Install new factory finish curb to match metal roof panels. Include labor & material cost. EA 10

Install new metal flashing collar, to 8" diameter. Include labor & material cost.

EA 15

Install new metal flashing collar, to 12" diameter. Include labor & material cost.

EA 15

Install new metal eave/rake closure to match roof panel. Include labor & material cost. LF 300

Install fiber glass shingles. Include labor & material.

SF 18000

Install #15 felt underlayment. Include labor & material.

SF 18000

Apply elastomeric coating to roof.

Includes labor,…