Questions and Answers from 10 Aug site visit for Demolition jobs on Barksdale AFB.docx

DOCX document 14 KB Posted

Attached to
Demolition of red chute skeet clubhouse B7136
Solicitation number
FA4608-11-Q-C948
Issued by

About this file

On 10 Aug 2011 a site visit was held on Barksdale AFB for the four demolition jobs. This is a comprehensive list of questions and answers.

View the file

Other files

File Type Posted
Attachment 4 - BAFBI 33-2.rtf RTF text file
FA4608-11-Q-C948 Solicitation.pdf PDF
Attachment 5 - Wage Determination.doc DOC document
Attachment 7 - Insurance.doc DOC document
Attachment 1 - Drawing.pdf PDF
Attachment 2 - AF66.pdf PDF
Attachment 3 - Environmental.doc DOC document
Attachment 6 - AFI 32-1001.rtf RTF text file
FA4608-11Q-C948 Amendment one.pdf PDF
Demo B7136.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers from 10 Aug site visit for Demolition jobs on Barksdale AFB.

Questions for FA4608-11-Q-C946, B4886 and 4887

1. Are color drawings available for the demolition jobs?

A. Yes. Color drawings will be posted on FBO.

2. Are we to include the asbestos and lead survey in our bid to gov’t?

A. You should include the cost of testing for asbestos in your initial bid. If asbestos or lead is found we will address it at that time. You will not be responsible for removing.

3. Gov’t to move the containers that were in the building?

A. Yes. They government is responsible for removing any items within the bldg.

4. The contract calls for the removal of the transformers. Do the transformers go back to the Gov’t?

A. Yes. The contractor will disconnect and remove the transformers to hand over the the Gov’t.

5. There is an existing fence enclosing the buildings. Can we use this fence as our lay down fence and tear down once the buildings are down?

A. Yes. This fence can be used as the lay down fence and tore down prior to concrete removal.

6. There is a Bayou behind the site. Will we need a silt fence?

A. Yes. A silt fence will be required.

Questions for FA4608-11-Q-C945, B7253 and B7254

1. After removing all the concrete do you want a clean saw cut before being replaced with asphalt?

A. Yes.

2. Does the Monaco Fire alarm Panel go back to the Gov’t?

A. Yes. Contractor will disconnect and remove from building.

3. The contract calls for the removal of the transformers. Do the transformers go back to the Gov’t?

A. Yes. The contractor will disconnect and remove the transformers to hand over the the Gov’t.

4. Once B7254 is demolished there will be approximately 15ft of open fence. Is the contractor responsible for replacing the 15 ft of missing fence?

Yes. The chain link fence will need to be enclosed.

Questions for FA4608-11-Q-C948, B7136

1. Do the sidewalks next to the bldg stay?

A. Yes. The sidewalk is part of the skeet walkway.

2. There is a water spicket outside the building. Do we leave the spicket or do we remove it and cap to the source?

A. Leave spicket.

Questions for FA4608-11-Q-C947, B7321 and B7720 (high security area)

1. Do the sidewalks need removed?

A. The sidewalks will be removed back to the street.

There were no questions for solicitation FA4608-11-Q-C948

File details come from the government source that posted it. Updated .