FA4608-11Q-C948 Amendment one.pdf
PDF 76 KB Posted
- Attached to
- Demolition of red chute skeet clubhouse B7136
- Solicitation number
- FA4608-11-Q-C948
About this file
The purpose of this amendment is to replace the original SOW with the Revised SOW dated 22 Aug 2011. The additional communication requirements are no longer needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - BAFBI 33-2.rtf | RTF text file | |
| FA4608-11-Q-C948 Solicitation.pdf | ||
| Attachment 5 - Wage Determination.doc | DOC document | |
| Attachment 7 - Insurance.doc | DOC document | |
| Attachment 1 - Drawing.pdf | ||
| Attachment 2 - AF66.pdf | ||
| Attachment 3 - Environmental.doc | DOC document | |
| Attachment 6 - AFI 32-1001.rtf | RTF text file | |
| Questions and Answers from 10 Aug site visit for Demolition jobs on Barksdale AFB.docx | DOCX document | |
| Demo B7136.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1G3A21207A004 AWUB 11-0046
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to remove the additional communication requirements from the original SOW and incorporate the revised
SOW dated 22 Aug 2011.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4608-11-Q-C948
X 9B. DATED (SEE ITEM 11)
03-Aug-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2011
CODE
2 CONS/LGC - FA4608
41 VANDENBERG AVE
BARKSDALE AFB LA 71110-2079
FA4608 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4608-11-Q-C948
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
Statement of Work for
AWUB 11-0046: Demolish Red Chute Skeet Clubhouse, B7136
Revision one
22 Aug 2011
Project shall include the furnishing of all materials, labor, and equipment necessary for the complete demolition of building and associated pavements to include all equipment remaining inside and outside the building. Complete the design to perform demolition as indicated on drawings in accordance with UFC 1-200-01 General Building Requirements which includes the latest editions of the International Building Code, Architectural Barriers Act, and NFPA Life Safety Code. All required work shall be accomplished in accordance with the Barksdale AFB Design Compatibility
Guidelines (DCG).
Building 4736 consists of 512 square feet.
1. The building may contain asbestos containing materials. Sampling, testing and a survey shall be done to verify location of asbestos present in the facility. If asbestos material is present, an asbestos abatement shall be accomplished by a licensed asbestos abatement contractor trained in the proper removal and disposal of the material encountered per State and Federal regulations.
State notification and disposal form shall be forward to the base at the completion of abatement.
2. Contractor shall obtain a 2 CES Digging Permit (AF Form 103) prior to beginning work. See attachment for approximate locations of utilities.
3. Coordinate all utility removal and outages with proper base agencies at least seven (7) business days prior to performing the work. Also, notify the 2d Civil Engineer Technical Support at least seven (7) business days prior to covering capped utilities, so they can mark for location and depth for base GEOBASE files.
4. Demolish and remove all existing partitions, walls, roof, HVAC systems, electrical systems, plumbing fixtures, and any remaining miscellaneous equipment. Generally, all utilities servicing the buildings shall be removed back to the source.
5. Electrical, base telecommunications (contact 2d Communications Sq) and commercial telephone service (contact AT&T), and cable TV services (contact 2d Communications Sq) will be terminated at the poles or as otherwise directed. See below for additional Communications requirements.
6. Sanitary sewer lines, domestic water lines, fire protection lines, mechanical chilled water supply and return lines, and gas lines shall be cut and capped at the main or cut and capped at valves near mains as directed by 2d Civil Engineer personnel.
7. Demolish and remove existing floor slabs, walkways, and concrete landings and stairs to include all footings, piers, reinforcement material and supports or any other objects used to support the building. Remove all exterior equipment foundations and pads.
8. Demolish and remove all existing landscape and hardscape around the perimeter of the buildings to include, but not limited to trees, shrubs, pavers, and loose stone. Contracting Officer’s
Representative shall designate landscaping to remain during demolition prior to starting work.
Designated landscape shall be protected from damage by Contractor.
9. Provide and install backfill material to restored land area to match contour and condition of adjacent areas. Compact in proper lifts as required preventing settling of area. Match contour of land around so as not to create water-pooling problems or inhibit the proper draining of surrounding land areas. The top six-inch layer of all fill areas shall be sifted topsoil suitable for grass placement.
10. Hydro-seed and fertilize with Bermuda/rye mix or Centipede/rye mix depending on the season to completely cover all exposed bare dirt areas and any grass damaged by the contractor.
Contractor shall water and maintain seeded area until rooting takes place and replacing any areas that die or does not take properly. Government will determine when seeded area has properly taken and watering can be stopped by the Contractor.
11. Contractor shall be responsible for installing and maintaining erosion control to prevent debris and mud from washing down into the storm drains and natural swales. Contractor shall also be responsible for maintaining the existing base roadways free of mud and debris during demolition and hauling procedures. Contractor shall ensure safety of base personnel during demolition and shall clearly mark the site using cones, barricades, warning tape, construction fence, or any other object suitable for such use.
12. Demolition Materials: All demolition materials under this contract become property of the
Contractor and must be removed completely from the Base. All materials, equipment, supplies left in the building or demolished at beginning of work shall become property of the Contractor.
Burial of demolition debris on-site shall not be allowed.
13. Acceptance of completed work will be based on its conformance to the contract. Nonconforming work will be rejected. The Air Force is not obligated to accept nonconforming work at a reduced price. The contractor shall start correction of rejected work within 10 calendar days after receipt of the rejection notice.
14. It will be the Contractor’s responsibility to visit the site and become familiar with the facilities to be demolished and include all work and equipment required in the bid. It is the Government’s desire that the end result of this contract be a clean fully restored site with all evidence of prior construction or facility location removed.
15. Upon completion of project, instruct base personnel on the location that utilities were cut off and capped for future reference.
16. The contractor will be responsible for and incur any and all labor and material costs required to repair any damages to government facilities that occurred during and as result of demolition operations under this contract. This damage will be identified as separate from the condition of the facilities as identified during the initial inspection. The damage will be identified, but not limited, to the following items.
a. Government gas, water, waste, and electric transmission and distribution systems.
b. Adjacent occupant personal property.
c. Existing trees.
d. Roadways and Parking Areas.
16. Additional Information
a. The contractor will begin work not earlier than 7:30 am each workday. Work will not be performed later than 6:00 pm.
b. Inspections will be conducted by the Contracting Officer and /or Contracting Officer’s
Representative and the contractor’s manager.
c. All discrepancies, if any, will be noted on provided drawings.
End of Statement of Work
(End of Summary of Changes)