FA4608-11-Q-C948 Solicitation.pdf

PDF 350 KB Posted

Attached to
Demolition of red chute skeet clubhouse B7136
Solicitation number
FA4608-11-Q-C948
Issued by

About this file

Solicitation Doc

View the file

Other files

File Type Posted
Attachment 4 - BAFBI 33-2.rtf RTF text file
Attachment 5 - Wage Determination.doc DOC document
Attachment 7 - Insurance.doc DOC document
Attachment 1 - Drawing.pdf PDF
Attachment 2 - AF66.pdf PDF
Attachment 3 - Environmental.doc DOC document
Attachment 6 - AFI 32-1001.rtf RTF text file
FA4608-11Q-C948 Amendment one.pdf PDF
Questions and Answers from 10 Aug site visit for Demolition jobs on Barksdale AFB.docx DOCX document
Demo B7136.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1G3A21207A004

The Contractor w ill demolish bldg 7136 and restore the site to match the surrounding area per the attached statement of w ork and applicable codes and standards.

This requirement is set-aside for Economically Disadvantaged Women Ow ned Small Businesses (EDWOSB) in accordance w ith Federal

Acquisition Regulation 19.15.

In accordance w ith FAR 36.204(a) Magnitude of Construction Projects, the price range of this project is anticipated to be less than $25,000.00.

Site Visit: A pre-bid site visit w ill be held on Wed 10 Aug 2011 at 9:00 am at the 2d Contracting Squadron, Bldg 5441, on Barksdale AFB.

Please call Robert Bleichner at (318) 456-2430 or Ricky Compton at (318) 456-6739 if you plan to attend.

Notice to Offerors: Funds are not presently available for this effort. No aw ard w ill be made under this solicitation until funds are available.

The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

ROBERT E BLEICHNER II, SSGT 318-456-2430

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Aug-2011

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Sep 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

2 CONS/LGC - FA4608

41 VANDENBERG AVE

BARKSDALE AFB LA 71110-2079

FA4608

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

318-456-3294FAX:TEL: 318-456-2113 TEL: FAX:

FA4608-11-Q-C948 45

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4608-11-Q-C948

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

AWUB 11-0046, DEMOLITION OF BLDG 7136 AN

FFP

AWUB 11-0046, DEMOLITION OF BLDG 7136 AND RESTORE AREA TO

MATCH SURROUNDINGS IN ACCORDANCE WITH THE STATEMENT OF

WORK ATTACHED HEREIN.

FOB: Destination

PURCHASE REQUEST NUMBER: F1G3A21207A004

SIGNAL CODE: A

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

Statement of Work for

AWUB 11-0046: Demolish Red Chute Skeet Clubhouse, B7136

26 July 2011

Project shall include the furnishing of all materials, labor, and equipment necessary for the complete demolition of building and associated pavements to include all equipment remaining inside and outside the building. Complete the design to perform demolition as indicated on drawings in accordance with UFC 1-200-01 General Building Requirements which includes the latest editions of the International Building Code, Architectural Barriers Act, and NFPA Life

Safety Code. All required work shall be accomplished in accordance with the Barksdale AFB

Design Compatibility Guidelines (DCG).

Building 7136 consists of 512 square feet.

1. The building may contain asbestos containing materials. Sampling, testing and a survey shall be done to verify location of asbestos present in the facility. If asbestos material is present, an asbestos abatement shall be accomplished by a licensed asbestos abatement contractor trained in the proper removal and disposal of the material encountered per

State and Federal regulations. State notification and disposal form shall be forward to the base at the completion of abatement.

2. Contractor shall obtain a 2 CES Digging Permit (AF Form 103) prior to beginning work.

See attachment for approximate locations of utilities.

3. Coordinate all utility removal and outages with proper base agencies at least seven (7) business days prior to performing the work. Also, notify the 2d Civil Engineer Technical

Support at least seven (7) business days prior to covering capped utilities, so they can mark for location and depth for base GEOBASE files.

4. Demolish and remove all existing partitions, walls, roof, HVAC systems, electrical systems, plumbing fixtures, and any remaining miscellaneous equipment. Generally, all utilities servicing the buildings shall be removed back to the source.

5. Electrical, base telecommunications (contact 2d Communications Sq) and commercial telephone service (contact AT&T), and cable TV services (contact 2d Communications Sq) will be terminated at the poles or as otherwise directed. See below for additional

Communications requirements.

6. Sanitary sewer lines, domestic water lines, fire protection lines, mechanical chilled water supply and return lines, and gas lines shall be cut and capped at the main or cut and capped at valves near mains as directed by 2d Civil Engineer personnel.

7. Demolish and remove existing floor slabs, walkways, and concrete landings and stairs to include all footings, piers, reinforcement material and supports or any other objects used to support the building. Remove all exterior equipment foundations and pads.

8. Demolish and remove all existing landscape and hardscape around the perimeter of the buildings to include, but not limited to trees, shrubs, pavers, and loose stone. Contracting

Officer’s Representative shall designate landscaping to remain during demolition prior to starting work. Designated landscape shall be protected from damage by Contractor.

9. Provide and install backfill material to restored land area to match contour and condition of adjacent areas. Compact in proper lifts as required preventing settling of area. Match contour of land around so as not to create water-pooling problems or inhibit the proper draining of surrounding land areas. The top six-inch layer of all fill areas shall be sifted topsoil suitable for grass placement.

10. Hydro-seed and fertilize with Bermuda/rye mix or Centipede/rye mix depending on the season to completely cover all exposed bare dirt areas and any grass damaged by the contractor. Contractor shall water and maintain seeded area until rooting takes place and replacing any areas that die or does not take properly. Government will determine when seeded area has properly taken and watering can be stopped by the Contractor.

11. Contractor shall be responsible for installing and maintaining erosion control to prevent debris and mud from washing down into the storm drains and natural swales. Contractor shall also be responsible for maintaining the existing base roadways free of mud and debris during demolition and hauling procedures. Contractor shall ensure safety of base personnel during demolition and shall clearly mark the site using cones, barricades, warning tape, construction fence, or any other object suitable for such use.

12. Demolition Materials: All demolition materials under this contract become property of the

Contractor and must be removed completely from the Base. All materials, equipment, supplies left in the building or demolished at beginning of work shall become property of the Contractor. Burial of demolition debris on-site shall not be allowed.

13. Acceptance of completed work will be based on its conformance to the contract.

Nonconforming work will be rejected. The Air Force is not obligated to accept nonconforming work at a reduced price. The contractor shall start correction of rejected work within 10 calendar days after receipt of the rejection notice.

14. It will be the Contractor’s responsibility to visit the site and become familiar with the facilities to be demolished and include all work and equipment required in the bid. It is the

Government’s desire that the end result of this contract be a clean fully restored site with all evidence of prior construction or facility location removed.

15. Upon completion of project, instruct base personnel on the location that utilities were cut off and capped for future reference. A single Civil Engineering drawing for each project (hardcopy and in

AutoCAD 2009 on CD) showing locations of all utility terminations should be adequate for As-

Builts. The need for As-Built documents is negotiable depending on the total amount of utilities actually modified for each structure.

16. The contractor will be responsible for and incur any and all labor and material costs required to repair any damages to government facilities that occurred during and as result of demolition operations under this contract. This damage will be identified as separate from the condition of the facilities as identified during the initial inspection. The damage will be identified, but not limited, to the following items.

a. Government gas, water, waste, and electric transmission and distribution systems.

b. Adjacent occupant personal property.

c. Existing trees.

d. Roadways and Parking Areas.

17. Additional Information

a. The contractor will begin work not earlier than 7:30 am each workday. Work will not be performed later than 6:00 pm.

b. Inspections will be conducted by the Contracting Officer and /or Contracting Officer’s

Representative and the contractor’s manager.

c. All discrepancies, if any, will be noted on provided drawings.

d. If Work is in a Restricted High Security Area, special security actions and precautions will be required as directed by the Contracting Officer’s Representative.

Additional Communications Requirements:

The demolition of building 7136 will require the relocation/re-provision of a 25 pair communications copper cable.

-- Contractor shall install a new section of 25 pair 24 gauge PE89 spec cable from splice point to the new office trailer located approximately 250 feet. Distance needs to be verified, exact location for splice point to be determined on site with 2d Communications Squadron (2CS).

Provide/install a conduit 4 inch sub-out from trench to office trailer.

Provide/install 2x2 ¾ inch plywood backboard. Location for backboard and 4 inch stub out to be determined.

-- Cable shall be direct buried at least 36‖ deep from splice pit to the building.

-- Contractor will expose existing cable at splice point and dig splice pit for 2 CS to cutover newly installed section into existing cable.

-- Contractor shall leave 15 feet of cable at splice pit for forming and splicing purposes.

-- Contractor shall provide the following parts to 2 CS for splicing and sealing purposes:

--- 1 each, 4‖ X 26‖ Preformed Line Products Stainless Steel Cases part# 8006366

--- 2 each, 3M Encapsulant Foil Packs, part# 8882-3000F

--- 1 each, 25 pair protected terminal P/N R66P25QC (EMERSON)

--- 1 each, standoff brackets P/N S89B

--- 25 each GAS protector Modules P/N 104410147 (AVAYA)

* 2 CS will complete the following:

-- Complete splicing and termination, test cable, install and seal closure.

-- Furnish required 3M pic-a-bonds for splicing and misc items e.g., tapes, cable ties, etc.

End of Statement of Work

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Section F - Deliveries or Performance

PERFORMANCE

F-800 NOTICE TO PROCEED

NOTICE TO PROCEED will be issued within 30 calendar days after award of contract. Award date shall be established as the date of mailing or otherwise furnishing a property executed award document to the successful offeror.

F-801 WORK SCHEDULE

Working hours for the contractor will normally be between the hours of 7:30 a.m. and 6 p.m. excluding Saturdays, Sundays and Federal Holidays (New Year’s Day, Birthday of Martin Luther King, Jr., Presidents Day, Memorial

Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day). If the contractor desires to work during periods other than above, additional government inspection forces may be required. The contractor must notify the contracting officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces when the conracting officer determines they are reasonably available. If such force is reasonably available, the contracting officer may authorize the contractor to perform work during periods other than normal duty hours/days, however, if inpsections are requried to perform in excess of their normal duty hours/days solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price may be made periodically as directed by the contracting officer.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 30 days to start and

90 days to complete after Notice to Proceed.

1 2 MSG/CES/CERF - F1G3A2

334 DAVIS AVE W

STE 300

BARKSDALE AFB LA 71110

FOB: Destination

F1G3A2

Section G - Contract Administration Data

ADMINISTRATIVE DATA

ADMINISTRATIVE DATA

(a) Following award, this contract will be administered by the 2d Contracting Squadron. The name, address, telephone number, and fax number of the Contracting Officer and Administrator are as follows:

CO: Marla J. Poirier

41 Vandenberg Ave

Barksdale AFB LA 71110-2079

Phone: 318-456-6833

Fax: 318-456-3294

E-mail: marla.poirier@barksdale.af.mil

Admin: Robert Bleichner

Phone: 318-456-2430

Fax: 318-456-3294

E-mail: robert.bleichner@barksdale.af.mil

(b) The Contracting Officer (CO), is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the CO. In the event the Contractor effects any such change at the direction of any person other than the CO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

WIDE AREA WORKFLOW

WAWF INSTRUCTIONS

In order to receive payment for an invoice from the Government Contracting activities at Barksdale AFB

LA, you must now use an E-Invoicing system called Wide Area Work Flow (WAWF).

WAWF is a web-based tool for the processing of invoices/receiving reports. This will bring about major changes in the amount of time it takes to process these documents making payment much faster. The web site for this system is https://wawf.eb.mil. There are no charges to use WAWF. All questions relating to system setup and vendor training can be directed to the help desk at Ogden. Their number is

1-866-618-5988.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND

ADDITONAL E-MAILS CORRECTLY THROUGH WAWF

Contract Type: Construction Invoice

Contract Number: To be determined

Delivery Order: N/A

Issue Date: Not Required

Issue DODAAC: FA4608 mailto:marla.poirier@barksdale.af.mil mailto:robert.bleichner@barksdale.af.mil https://wawf.eb.mil/

Admin DODACC: FA4608

Inspected by DODAAC/Ext: FA4608

Service Acceptor/Ext: FA4608

Pay DODAAC: F67100

Ship To Code/Ext: FA4608

Shipment No: AWUB 11-0046

Ship Date (Enter date merchandise/service received). Double click on calendar.

Add to e-mail address: marla.poirier@barksdale.af.mil

Add email address: robert.bleichner@barksdale.af.mil

Add email address:

The paying office DODAAC and mailing address can be located on front of your award. You can easily track your payment information on the DFAS web site at https://myinvoice.csd.disa.mil/. Your purchase order/contract number or invoice will be required to inquire status of your payment. Most Barksdale AFB orders are non-MOCAS, use the options listed under there.

Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) Limestone at

1-800-390-5620 or 1-800-337-0371 or faxed to 1-207-328-1660. Please have your order number and invoice number ready when calling about payment status. If your paying office is other than Limestone, contact your contract administrator for the customer services phone/fax numbers.

CLAUSES INCORPORATED BY FULL TEXT

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(MAR 2008)

(a) Definitions. As used in this clause--

(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal

Acquisition Regulation.

(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting

Officer.

mailto:marla.poirier@barksdale.af.mil mailto:robert.bleichner@barksdale.af.mil https://myinvoice.csd.disa.mil/

(3) Payment request means any request for contract financing payment or invoice payment submitted by the

Contractor under this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when--

(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;

(2) DoD is unable to receive a payment request or provide acceptance in electronic form;

(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the

Contracting Officer's determination with each request for payment; or

(4) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and

Billing System).

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in

Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.

(End of clause)

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

H-109. REQUIRED INSURANCE

(IAW FAR 28.306(b) and FAR 52.228-5)

Reference FAR clause entitled "Insurance..." the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.

a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's

Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.

c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and

$500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.

H-804. BONDS

a. Bid Guarantee – Not required

b. Performance and Payment Bonds. In accordance with the Miller Act (40 U.S.C. 3131), the bidder to whom the award is made shall within fifteen (15) calendar days after the award of the contract furnish a

Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A), each with good and sufficient surety or sureties acceptable to the Government. (Not required for contracts of $30,000.00 or less).

Contracts exceeding the $150,000 (Miller Act--.

(1) Performance bonds. Unless the contracting officer determines that a lesser amount is adequate for the protection of the Government, the penal amount of performance bonds must equal--

(i) 100 percent of the original contract price; and

(ii) If the contract price increases, an additional amount equal to 100 percent of the increase.

(2) Payment Bonds.

(i) Unless the contracting officer makes a written determination supported by specific findings that a payment bond in this amount is impractical, the amount of the payment bond must equal-

(A) 100 percent of the original contract price; and

(B) If the contract price increases, and additional amount equal to 100 percent of the increase.

(ii) The amount of the payment bond must be no less than the amount of the performance bond.

c. The contractor will not be allowed to start work prior to furnishing the required bonds, including any necessary reinsurance agreements.

H-805. PROGRESS SCHEDULES AND REPORTS

(a) In accordance with FAR 52.236-15, the reports contemplated by the clause titled "Schedules for

Construction Contracts" shall be accomplished on and in accordance with instruction pertaining to AF Form

3064, Contract Progress Schedule, and AF Form 3065, Contract Progress Report. Mobilization/demobilization will not be allowed as a line item on the Progress Schedule. Costs for those items must be included in other elements of work.

(b) Upon award of the contract and as required, the contractor will be furnished (3) copies of the AF Form

3064, Contract Progress Schedule. The Progress Schedule must be approved by the Government prior to start of physical work on the project job site.

H-806. PREPARATION OF MATERIAL APPROVAL SUBMITTALS

In accordance with FAR 52.236-5, the submittals contemplated by the clause herein entitled "Material and

Workmanship" shall be accomplished on and in accordance with instructions pertaining to AF Form 3000, Material Approval Submittal.

H-807. INTERRUPTION OF UTILITY SERVICES

The Government may not be held responsible for interruptions of utility service and will not be liable for contractor delays, damages, or increased costs occasioned by any such interruption of service.

H-808. SUPERINTENDENCE OF CONTRACT

In accordance with FAR 52.236-6, at all times during performance of this contract and until work is completed and accepted, the contractor shall provide a superintendent who will be on the job site at all times when work is being performed. The superintendent will be responsible for ALL employees (including subcontractors) and have the authority to plan work and direct ALL employees. The superintendent will be appointed in writing and this letter submitted to the Contracting Officer, setting forth the authority delegated to the superintendent.

H-809 CONTRACT COMPLETION INSPECTIONS

The contractor will schedule (preferably with 3 working days notice) a pre-completion inspection to be held approximately 10 calendar days prior to the expiration of the contract. This inspection may result in a

"punchlist" indicating items to be furnished or work to be completed by the contractor or subcontractors in order to complete the work specified in the contract documents. This list may not be construed to be all inclusive. A copy of the list will be furnished to the contractor within 2 workdays for his use in completing the contractual work. If the pre-completion inspection results in no "punchlist" and the work is complete, this inspection may be considered the "final" inspection as determined by the Contracting Officer.

If required, the contractor will be responsible for scheduling the contract completion inspection (preferably with

3 working days notice) to be held no later than the final day of contract performance. Should this inspection result in a "punchlist", the contractor will have 10 calendar days (after receipt of punchlist) to complete all punchlist items and notify the Contracting Officer of this. NO FINAL INVOICE SHALL BE PAID UNTIL

ALL PUNCHLIST ITEMS ARE COMPLETED TO THE SATISFACTION OF THE CONTRACTING

OFFICER. Should a contractor exceed the time allowed for these corrections, it may result in negative past performance which could affect future contract awards.

H-811. CLASS I OZONE DEPLETING SUBSTANCES/CHEMICALS

If this project has any materials or equipment that contains Class I Ozone depleting substances/chemicals, you are required to contact the Contracting Officer, 318/456-6833, for further instructions prior to providing the product or equipment.

BOSSIER CITY -- PARISH SALES AND USE TAX

Bossier City and Bossier Parish levy a use tax defined by state and local sales tax law. As such, these sales are taxable at the point of delivery to the "contractor" (consumer). If the sales or use tax is not collected by the vendor, tax is payable directly to the jurisdiction in which delivery is made. Contractors and subcontractors are each individually liable for sales and use tax on the basis of their individual purchase transactions. This tax may extend to equipment leased or rented to the Government. It may also extend to supplies and equipment purchased elsewhere, but brought into Bossier Parish for final use. All contractors are cautioned to assure themselves of any liability for this tax. The local telephone number for questions concerning this tax is A/C 318 741-8551.

CONTRACTOR/VENDOR ACCESS TO BARKSDALE AFB

All commercial vehicles are required to enter Barksdale AFB through the East Gate, just off I-20 and Industrial

Drive. This includes construction, food, supply, FedEX, and UPS deliveries, as well as contractors entering with company trucks. Contractors entering in their privately owned vehicles with an approved pass will be allowed entry at any gate. Hours of operation for the East Gate are 0500-2200 Monday through Friday, Saturday 0600-1200.

Background Checks for Contractor Personnel Requiring Entry/Access to Barksdale AFB (Jan 2005)

Security Forces will conduct a National Crime and Information Center (NCIC) background check on all contractor or subcontractor personnel prior to granting access to the installation.

(End of Clause)

CELL PHONE POLICY

The use of cell phones while operating a moving vehicle on Barksdale AFB is prohibited, unless the phone is operated in a ―hands free‖ mode. ―Use of cell phones‖ includes placing calls, retrieving stored information from the phone, programming the phone, talking on the phone, and receiving calls, regardless of the source. Violators may be issued a citation and assessed 3 points on their base driving record. Additional points may be assessed if cell phone use is found to be a contributing factor in a motor vehicle accident.

Lay-down Area Temporary Fencing

1. The Contractor shall furnish all labor, materials, and equipment necessary to provide secure and visually aesthetic temporary fencing for surrounding project equipment and material in lay-down areas.

Work shall include:

a. Clearing area of all encumbrances to safe erection of fencing.

b. Provide fence that is: metal tube frame; metal woven wire mesh (minimum 11 gauge); minimum 6 feet in height.

c. Provide integral to fence visual blocking material, either slat weave or sheet goods.

d. Erecting fence in such manner as to prevent loss of fencing or blocking due to inclement weather.

e. At no time shall fence interfere with fire egress paths or fire equipment ingress, to include periods when gates are in operation.

Contractor shall submit cut sheets on all items for installation, prior to procurement, for approval by the C.E.

Architect. Complete the design as indicated on drawings in accordance with UFC 1-200-01 General Building

Requirements which includes the latest editions of the International Building Code and NFPA Life Safety Code, and

Americans with Disabilities Act. All required work shall be accomplished in accordance with the Barksdale AFB

Design Compatibility Guidelines (DCG). All colors and materials shall be selected by the Civil Engineer Architect in accordance with the DCG. Construction shall be conducted in a quality workmanlike manner. Contractor shall take any steps necessary to protect government and occupant property from damage caused by weather or other occurrence while work is in progress.

2. Upon notification of completion by the contractor a determination will be made as to the satisfactory completion and acceptance of the contract specification(s). Any segment of the operation that is not acceptable because of an unsightly or unprofessional appearance will be justification for rejection of the treatment. The contractor will incur all costs, both labor and materials, for reaccomplishment of any unacceptable work identified.

3. The contractor will be responsible for and incur any and all labor and material costs required to repair any damages to government facilities that occurred during and as result of repair work, replacement operations, or new work, under this contract. This damage will be identified as separate from the condition of the facilities as identified during the initial inspection. The damage will be identified, but not limited, to the following items.

a. Government gas, water and electric transmission and distribution systems

b. Occupant personal property

Additional Information.

a. The contractor will begin work not earlier than 7:30 am each workday. Work will not be performed later than 6:00 pm.

b. Inspections will be conducted by the Contracting Officer and /or Contracting Officer’s Representative and the Contractor’s Manager.

c. Any discrepancies should be noted and forwarded to the Architect.

Section I - Contract Clauses

52.204-7 Central Contractor Registration APR 2008

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

DEC 2010

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997

52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.215-21 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data--

Modifications

OCT 2010

52.219-14 Limitations On Subcontracting DEC 1996

52.219-29 Notice of Total Set-Aside for Economically Disadvantaged

Women-Owned Small Business (EDWOSB) Concerns

APR 2011

52.222-1 Notice To The Government Of Labor Disputes FEB 1997

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-99 Notification of Employee Rights under the National Labor

Relations Act.

JUN 2010

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

DEC 2007

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-18 Contractor Policy to Ban Text Messaging While Driving SEP 2010

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-11 Pledges Of Assets SEP 2009

52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995

52.228-14 Irrevocable Letter of Credit DEC 1999

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes APR 2003

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

52.232-17 Interest OCT 2010

52.232-23 Assignment Of Claims JAN 1986

52.232-27 Prompt Payment for Construction Contracts OCT 2008

52.232-33 Payment by Electronic Funds Transfer--Central Contractor

Registration

OCT 2003

52.233-1 Disputes JUL 2002

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-21 Specifications and Drawings for Construction FEB 1997

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.242-15 Stop-Work Order AUG 1989

52.243-4 Changes JUN 2007

52.244-6 Subcontracts for Commercial Items DEC 2010

52.248-3 Value Engineering-Construction OCT 2010

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

JAN 2009

252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007

252.223-7001 Hazard Warning Labels DEC 1991

252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 1993

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment MAR 1998

252.247-7023 Transportation of Supplies by Sea MAY 2002

252.247-7023 Alt III Transportation of Supplies by Sea (May 2002) Alternate III MAY 2002

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 Calendar days . The time stated for completion shall include final cleanup of the premises.

52.211-13 TIME EXTENSIONS (SEP 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and

Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the

Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in

ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 238910- assigned to contract number FA4608-11-Q-C948.

(Contractor to sign and date and insert authorized signer's name and title).

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)

(a) Definitions. As used in this clause--Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply that is--

(i) A commercial item (as defined in paragraph (1) of the definition at 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products. Per 46 CFR 525.1(c)(2), ``bulk cargo'' means cargo that is loaded and carried in bulk onboard ship without mark or count, in a loose unpackaged form, having homogenous characteristics.

Bulk cargo loaded into intermodal equipment, except LASH or Seabee barges, is subject to mark and count and, therefore, ceases to be bulk cargo.

Employee assigned to the contract means an employee who was hired after November 6, 1986, who is directly performing work, in the United States, under a contract that is required to include the clause prescribed at 22.1803.

An employee is not considered to be directly performing work under a contract if the employee--

(1) Normally performs support work, such as indirect or overhead functions; and

(2) Does not perform any substantial duties applicable to the contract.

Subcontract means any contract, as defined in 2.101, entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime

Contractor or another subcontractor.

United States, as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands.

(b) Enrollment and verification requirements.

(1) If the Contractor is not enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall--

(i) Enroll. Enroll as a Federal Contractor in the E-Verify program within 30 calendar days of contract award;

(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use E-Verify to initiate verification of employment eligibility of all new hires of the Contractor, who are working in the United

States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and

(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee's assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of--

(i) All new employees. (A) Enrolled 90 calendar days or more. The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in E-

Verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United

States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)(2), respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.

(4) Option to verify employment eligibility of all employees. The Contractor may elect to verify all existing employees hired after November 6, 1986, rather than just those employees assigned to the contract. The Contractor shall initiate verification for each existing employee working in the United States who was hired after November 6, 1986, within 180 calendar days of--

(i) Enrollment in the E-Verify program; or

(ii) Notification to E-Verify Operations of the Contractor's decision to exercise this option, using the contact information provided in…