This is a standardized Electric Power Outage Report form used by the 55th Civil Engineer Squadron at Offutt Air Force Base. The form functions as a template for documenting and categorizing power outages across base facilities.

The report captures essential outage information including date, time, and affected facilities, with provisions to identify whether outages are scheduled or unscheduled. It requires documentation of the number of generators affected and failures. The form uses coded classification systems to categorize the main problem source (commercial power, backup power, distribution, substation, equipment, UPS, lighting, power conditioner, or frequency converter) and to identify specific item faults and causes. For commercial power failures, it provides 35 coded fault categories ranging from batteries and buses to transformers and switches, with 20 cause codes including arcing, corrosion, weather, and operator error. For backup power failures, it lists nine item fault categories such as engine, generator, fuel system, and cooling system, with 14 associated cause codes. The form also includes a circuit identification section with 18 coded options representing various OPPD (Omaha Public Power District) circuits and Burt County service areas. The report concludes with signature lines for completion documentation and space for additional comments. This template serves as an internal administrative and operational tracking tool rather than a procurement document.

View the file

Other files

File Type Posted
Combined Solicitation Ver 4 - FA460026Q0101 - 9.21.26.pdf PDF
Combined Solicitation Ver 4 - FA460026Q0101 - 9.15.26.pdf PDF
Attachment 09 - dd0254 - 9.15.26.pdf PDF
Attachment 05 - Questions and Answers ver2 - 9.14.26.xlsx XLSX spreadsheet
Combined Solicitation Ver 3 - FA460026Q0101 - 9.14.26.pdf PDF
Attachment 08 - Asset List (SANITIZED) - 9.11.26.xlsx XLSX spreadsheet
Appendix D - DD Form 250 Material and Receiving Report.pdf PDF
Appendix E - Offutt AFB Dig Ticket Process.pdf PDF
Attachment 06 - Spare Parts List - 9.11.26.pdf PDF
Appendix C - Performance Assessment Report.pdf PDF
Attachment 07 - CUI NDA - 9.11.26.pdf PDF
Appendix A - Customer Complaint Record.pdf PDF
Appendix I - CEO Tank Compliance Docs and Long Regs 20240808 (2).pdf PDF
Appendix G - AF Form 487 Generator Inspection Form.pdf PDF
Appendix B - Corrective Action Report.pdf PDF
Attachment 05 - Questions and Answers - 9.11.26.pdf PDF
Attachment 01 - PWS v3 - 9.11.26.pdf PDF
Appendix H - OFFUTT AFB SECTION 01 57 19 ENVIRONMENTAL SPECIAL CONDITIONS 20250605.pdf PDF
Combined Solicitation Ver 2 - FA460026Q0101 - 9.8.26.pdf PDF
Attachment 01 - PWS - 6.15.26.pdf PDF
Attachment 03 - Site Visit Info and Protocol - 8.13.26.pdf PDF
Attachment 04 - Site Visit Entry Form - 8.13.26.docx DOCX document
Attachment 02 - Wage Determination 2015-5005 Rev 28.pdf PDF
Combined Solicitation - FA460026Q0101 - 8.14.26.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

55TH CIVIL ENGINEER SQUADRON

ELECTRIC POWER OUTAGE REPORT

(1) DATE:

TO:

FROM:

BASE:

REPORTED BY:

DATE/TIME OUT: DATE/TIME IN:

(2) WAS THIS POWER OUTAGE A SCHEDULED (S) OR UNSCHEDULED (U)

NUMBER OF GENERATORS AFFECTED:

NUMBER OF GENERATOR FAILURES:

(3) MAIN PROBLEM:

C - COMMERCIAL POWER D - DISTRIBUTION S - SUBSTATION

B - BACKUP POWER E - EQUIPMENT

U - U.P.S.

L - A/F LIGHTING

P - POWER CONDITIONER F - FREQUENCY

CONVERTER

(4) LIST BUILDING NUMBERS AND FUNCTIONS:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Continued on page 3

(5) COMMERCIAL POWER ITEM FAULT:

01 - BATTERY 13 - CROSSARM

02 - BUSS 14 - CUT-OUT

03 - BUSHING 15 - DISCONNECT

04 - CABLE OH/PRI 16 - FUSES

05 - CABLE UG/PRI 17 - INSULATOR

06 - CABLE OH/SEC 18 - LIGHTNING PROT

07 - CABLE UG/SEC 19 - POLE

08 - CAPACITOR 20 - POTHEAD

09 - CIRCUIT BREAKER 21 - REGULATOR

10 - CONNECTOR/PRI 22 - RELAY

11 - CONNECTOR/SEC 23 - SERVICE DROP

12 - CONTROLS 24 - SWITH/AIR

(6) CAUSE:

01 - ARCING 08 - GROUND

02 - BLOWN 09 -INSULATION

03 - BROKEN 10 - OPERATOR

04 - BURNT 11 - LOOSE

05 - CORROSION 12 - OBJECT IN CKT

06 - CUT 13 - OPEN

07 - CUT DIGGING 14 - OVERHEAT

25 - SWITCH/OIL

26 - SWITCH/GAS

27 - TRFMR - DIST/AIR

28 - TRFMR - DIST/OIL

29 - TRFMR - CT

30 - TRFMR - INSTRMT

31 - TRFMR - PT

32 - TERMINATOR

33 - O.C.B.

34 - A.C.B.

35 - OTHER _________

99 - NOT APPLICABLE

15 - OVERLOAD

16 - SHORTED

17 - TRIPPED

18 - WEATHER

19 - OTHER__________

20 - DISCHARGE

99 - NOT APPLICABLE

(7) BACK-UP POWER ITEM FAULT:

04 - COOLING SYSTEM 07 - V-BELTS

05 - START SYSTEM 08 - VOLT REG

01 - ENGINE

02 - GENERATOR

03 - FUEL SYSTEM 06 - BATTERY(S) 09 - ATS

(8) CAUSE:

01 - ARCING 06 - LOOSE 11 - LOW OIL

02 - BLOWN 07 - OVERHEAT 12 - FUEL

03 - BROKEN 08 - OVERLOAD 13 - OPERATOR ERROR

04 - BURNT 09 - SHORTED 14 - OTHER_________

05 - CORROSION 10 - TRIPPED

(9) CIRCUIT:

07 - 1195 OPPD

08 - 1196 OPPD

09 - 1197 OPPD

10 - 1198 OPPD

11 - 1199 OPPD

01 - 183 OPPD

02 - 241 OPPD

03 - 242 OPPD

04 - 244 OPPD

05 - 334 OPPD

06 - 355 OPPD 12 - 2000 OPPD

13 - 2001 OPPD

14 - 2002 OPPD

15 - 2003 OPPD

16 - 2004 OPPD

17 - 2005 OPPD

18 - Burt County

OUTAGE REPORT COMPLETED BY:

ADDITIONAL COMMENTS IF REQUIRED:

Check Box1:
0: Off
1: Off
2: Off
Check Box2:
0: Off
1: Off
2: Off
Check Box3:
0: Off
1: Off
2: Off
Check Box4:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
Check Box5:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
Check Box6:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
Check Box7:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
Check Box8:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
Check Box9:
0: Off
1: Off
3: Off
4: Off
5: Off
Check Box10:
0: Off
1: Off
2: Off
Check Box11:
0: Off
1: Off
2: Off
Check Box12:
0: Off
1: Off
2: Off
Check Box13:
0: Off
1: Off
2: Off
3: Off
4: Off
Check Box14:
0: Off
1: Off
2: Off
3: Off
4: Off
Check Box15:
0: Off
1: Off
2: Off
3: Off
Check Box17:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box18:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box19: Off
Check Box20: Off
Text21:
0: B185
1: B518
2: E4-N
3: B301
4: 565
5:
6:
7:
8:
9:
10:
11:
12:
Text22:
0: AFWA
1: Power Plant
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
Text23:
Text24:
Check Box25: Off
Check Box26: Off
Date27_af_date:
Date28_af_date:
Text29:
Text30: Offutt
Text31:
Text32:
Text33:
Text34:
Text35:
Text36:
Text37:
Text38:
Check Box41:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Date1_af_date:
Text1:
Text4:
Text2: CP service
Text3:
Text5:

File details come from the government source that posted it. Updated .