This file is a Questions and Answers document related to the TACFIT Flooring solicitation at Offutt Air Force Base.

The document captures vendor inquiries and government responses concerning the replacement and removal of un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. Key solicitation details include a questions deadline of 16 September 2026 at 1100 CST, with answers posted via amendment to sam.gov, and an offer submission deadline of 21 September 2026 at 1100 CST. An optional site visit was scheduled for 14 September 2026 at 1300 CST, requiring EAL form submission by 7 September 2026, though Amendment 00002 (10 September 2026) removed the mandatory pre-award site visit requirement. Amendment 00003 (17 September 2026) updated the Performance Work Statement to increase flooring thickness to 3/4 inch and included site visit photographs and vendor question responses. The Air Force Contracting Office at 55 FSS (Fifteenth Air Force Services Squadron) is managing this procurement for the Department of the Air Force Air Combat Command. Base access for site visits is not guaranteed and requires appropriate identification documentation including legal name, date of birth, driver's license or passport information, and citizenship verification.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Tacfit Flooring Solicitation FA460026Q0089

QuestionsAnswers
1Pre-Award Site Visit: PWS Section 2.6.1 requires attendance at a pre-award site visit. Has a date been scheduled, and if so, could you provide the date, time, and any check-in/access instructions for Offutt AFB?Monday, 14 Sept, 1300hrs. Must make prior arrangement with CONS to be pn the access roster or will require escort from Fitness staff
2Period of Performance: The PWS (Section 1.5) states a 30-day period of performance, while the solicitation schedule (Block 20/Deliveries) lists a delivery period of 01 Oct 2026 to 31 Oct 2026. Please confirm which period of performance governs for proposal purposes.30 Days from whenever work actually starts. Work is not required to start on 1 Oct2026
3Personnel Access/Clearance: PWS Section 2.7 states contractor personnel must be able to obtain access to Offutt AFB with favorable clearance at time of award. Could you clarify the specific level of clearance or background check required for installation crew members and whether any lead time should be anticipated for base access approval?Basic criminal background check.
4Funding Status: Given the Special Contract Requirements notice that funds are not currently available for this effort, can you advise whether there is an anticipated timeline for funding availability, or whether this remains undetermined at this time?undetermined if fundng will be available in FY 2026
5We noticed conflicting submission times for FA460026Q0089. Would you please confirm the official closing time on September 21?11 am Central Time 21 September 2026
6Has the pre-award site visit for Q0089 been scheduled?yes. see #1
7We anticipate using a qualified small-business flooring subcontractor for the specialized field work, with Courier Pro remaining responsible as the prime contractor for overall contract performance and management. Could you please confirm the applicable limitation-on-subcontracting requirements and whether work performed by a similarly situated small-business subcontractor may count toward those requirements?Per RFO 19.108-8(a)(1) Limitations on subcontracting: To be awarded a contract or order under the 8(a) program, the 8(a) participant is required to perform—

For services (except construction), at least 50 percent of the cost incurred for personnel with its own employees.

8May a qualified representative of the flooring subcontractor serve as the required local/on-site project manager if formally designated and authorized by Courier Pro to coordinate performance on our behalf?yes. see #1
9May the same prime contractor submit separate quotations for both Q0088 and Q0089? If awarded both, may mobilization, personnel, equipment, and scheduling be coordinated between the projects while keeping each contract's scope and pricing separate?yes
10We were unable to locate prior awards for these specific requirements in our review of publicly available federal award information. If either requirement, or substantially similar Field House flooring work, has been previously contracted, could you please provide the prior contract/order number or other publicly releasable award information?There have been no prior contracts.
11Given the EAL access request deadline of COB September 7 has now passed on our end, we will not have an attendee at the site visit. Our understanding is that attendance is not mandatory to submit a quote — please let us know if that's incorrect.not mandatory. highly encouraged. If someone can be here we can provide an escort to get them on base
12We also noticed what appears to be a discrepancy in the solicitation documents and wanted to flag it rather than guess: Block 8 of the SF 1449 lists the offer due date/time as 21 September 2026, 11:00 AM, while the Instructions to Offerors provision (FAR 52.212-1(a)) states offers are due "at or before 21 September 2026, 11:00 PM CDT." Could you confirm which is correct so we build our submission timeline accordingly?11 am Central Time
13Separately, PWS Section 2.7 states that contractor personnel must be able to obtain access to Offutt AFB "by having favorable clearance at time of contract award." Given the compressed schedule between the September 21 due date and an anticipated October 1 performance start, could you share what the typical badge/background-check processing timeline looks like for a newly engaged subcontractor, so we can begin that process promptly if selected?Basic criminal background check.
14Current photographs of the TACFIT space showing the existing flooring conditions (rubberized and wood plank sections) and the twelve bolted pull-up racks referenced in the PWS.not available at this time
15Any existing floor layout, equipment placement diagram, or as-built drawings on file, if available.not available at this time
16Whether a brief virtual walkthrough (phone or video call with facility staff) could be arranged as an alternative for offerors unable to attend in person.no
17SF1449 shows 21 Sep 2026 11:00 AM local, while page 19 states 21 Sep 2026 11:00 PM CDT. Which deadline controls?11 am Central Time
18What is the required electronic submission method/address?Responses should be submitted to the PoCs listed on the solicitation on sam.gov
19The PWS requires a pre-award site visit. What is the date/time, RSVP and base-access process?Monday, 14 Sept, 1300hrs. Must make prior arrangement with CONS to be pn the access roster or will require escort from Fitness staff
20Beyond level, high-durability, 3/8-inch rubber flooring, are there mandatory product requirements for brand, color, roll/tile format, density, adhesive or recycled content?no just that it must be smooth. Thickness was update in the PWS
21For attached Wage Determination 2015-5005, which occupational classification(s) should be used for flooring installation/removal labor if classification clarification is required?The Government does not dictate which occupational classification is required to complete the work.
22Please confirm whether the contractor is expected to remove all existing rubber flooring and wood-plank flooring down to the concrete substrate.yes they are
23Does the Government have any information regarding the existing construction beneath the wood-plank and rubber flooring, including underlayment, sleepers, subfloor, or other materials?not available at this time
24The PWS references uneven/multiple flooring surfaces. Is substantial grinding, patching, or self-leveling anticipated in order to create one continuous level substrate?no. not anticipated
25Does the Government have any known information regarding cracks, moisture issues, adhesive residue, or other existing concrete conditions in the TACFIT area?no known information
26Please confirm the required specifications for the new 3/8-inch rubber flooring, including whether a particular manufacturer, product, density, roll width, tile size, recycled-content requirement, or performance standard is required.Offerors are expected to be experts in this field and determine the best flooring product for the purpose of the space... which is Powerlifting, Crossfit and HYROX Training. This includes dropping barbells weighing up to 500 lbs, slamming weighted balls, rolling weight plate stacks from 1 rig to another as well as doing floor based training (Burpees, planks, etc). Please not the flooring thickness has been increased to 3/4 inch in the PWS in Amendment 00003
27Are both rolled rubber and rubber tile acceptable, provided the proposed product meets the performance requirements?Offerors are expected to be experts in this field and determine the best flooring product for the purpose of the space... which is Powerlifting, Crossfit and HYROX Training. This includes dropping barbells weighing up to 500 lbs, slamming weighted balls, rolling weight plate stacks from 1 rig to another as well as doing floor based training (Burpees, planks, etc). Please note the flooring thickness has been increased to 3/4 inch in the PWS in Amendment 00003
28Is the new rubber flooring required to be fully adhered? If so, are there any required adhesive specifications?no
29The PWS references approximately 12 pull-up racks bolted to the floor. Please confirm whether the contractor is responsible for removing and reinstalling all of these racks.yes they are
30When the pull-up racks are reinstalled, may the existing anchors be reused if serviceable, or should the contractor include new anchors/hardware in the quote?yes they can be reused if serviceable
31Is the contractor responsible for moving and returning all fitness equipment in the work area, or will Government personnel assist with any equipment relocation?Government personnel will assist with moving all fitness equipment in the area
32Are there any required transitions, reducers, edge treatments, or termination details where the new rubber flooring meets adjacent flooring, doorways, walls, or other surfaces?Perimeter edges should slope down to the base concrete to reduce risk of trips and for ease of movement of equipment
33Please confirm whether the approximate 6,000 square feet is intended for pricing purposes only and whether the contractor is responsible for field-verifying final quantities.Contractor is responsible for field-verifying final quantities
34Are there any required cure times or a specific date by which the TACFIT area must be returned to service following installation?No.
35Would the Government be able to accommodate an alternate site visit on Thursday, September 17 or Friday, September 18, 2026?No
36If an alternate site visit is approved for either September 17 or September 18, would it be possible for us to inspect both the TACFIT flooring area and Basketball Court #4 during the same visit?Alternate site visit will not be approved, no
37If either alternate date is available, please advise who we should coordinate with regarding the appointment and base-access requirementsAn alternate date will not be available.
38If an alternate site visit cannot be accommodated, please advise whether additional photographs, measurements, floor plans, or existing-condition information can be provided before the quote deadline.All photos have been included in Amendment 00003
39Please confirm whether attendance at the site visit is mandatory in order to submit a quoteNot mandatory to submit a quote.
40Could you please confirm whether attendance at the pre award site visit scheduled for September 14, 2026 is mandatory to submit an offer?Not mandatory to submit a quote.
41I would highly recommend at least 1/2” rubber flooring for any areas power lifters are using and/or dropping of plates would be occurringPWS has been updated to include 3/4 inch rubber flooring in Amendment 00003
42A detailed list and/or pictures with dimensions of all equipment that needs to be removed and re-installed, as well as where said equipment will be storednot available at this time
43List what the subfloor underneath the existing flooring is. Assuming it is concrete and if the existing flooring is adhered, the subfloor will need to be diamond grindedunknown
44A floor plan and where a dumpster can be place is extremely helpfulNot available
45Davis Bacon Act or Service Contract Act wages?Service Contract Act, Wage Determination are attached to the solicitation.
46Floor plan or drawings showing the TACFIT area and dimensions;Dimensions: 50 ft wide x 125feet long.
47Photographs of the existing flooring, transitions, and equipment; orsee photos
48An opportunity for RFE or a prospective flooring subcontractor to conduct an additional walkthrough of the area.No
49Will the space/building be shut down during the replacement project? If not, what kind of safety barriers will be needed?Post site visit questiions
50Will we get the entire space at once for the demo of existing and installation of new? If not, how many phases does the owner think will be needed?The entire space will be shut down to patron use during the demo of existing flooring and install of new. PWS states that work must be complete within 30 calendar days
51Is there space within the building to store all the equipment that needs to be moved in order to complete the scope of work. If not, is there an area to drop containers to move the equipment into?Yes
52The PWS notes that "removal of floor tape" is part of the scope of work. Will new tape be needed to replace what is pulled up?Tis is a technical question I would expect the flooring expert to answer.
53Will the equipment that is moved for the replacement process be put back in the same place? Or does the owner have a new layout of equipment they want to use?Put back in same place
54Can the owner provide documentation that there is no asbestos or any other hazardous materials that may be unseen under the existing flooring?Not at this time, but we will provide that prior to demo
55Is the unevenness of the existing flooring due to the different materials used to create the fitness area? Or is it due to the substrate that the flooring is installed over?yes- different materials
56In the PWS Section 1.3 Objectives: It notes that..."and allow power lifters to safely drop bumper plates". Is this area currently unsafe? If so, how/why? Or do they want to use crash pads in this area to protect the new flooring from being damaged by the constant dropping of the weights on the floor in this area?no- the area is currently safe for power lifters to drop barbells. It needs to remain safe. The flooring used should be appropriate for that purpose.
57How many power lifting stations are there?12
58Are there any electrical outlets in the floor in the area of flooring replacement?no
59Will parking for the demo/installation crew be available close to the TACFIT bldg?yes
60Will an area be available close to the building for placement of a dumpster(s) for demo'd materials?yes
61The PWS in Section 1.4 "Tack and clean the floor using a concrete cleaner? Is this in the area of flooring replacement only or is it in another area?only flooring replacement area
62Are bid guarantees/bid bonds required for these projects?No
63Flooring quantity: The PWS identifies approximately 6,000 SF. Should offerors price exactly 6,000 SF, or will the actual field-measured quantity govern performance?See updated PWS for specific dimensions
64Floor preparation/leveling: Since the existing flooring is described as un-level, please confirm the extent of required substrate preparation. Should the contractor include grinding, patching, filling, or self-leveling materials as necessary to provide the required level finished surface? If so, is there a required flatness/level tolerance?None. It is unlevel due to the type of rubber flooring previously used
65Rubber flooring specification: Other than the required 3/8-inch thickness and high-durability rubber surface, are there minimum requirements for product type (rolls vs. tiles), density, color, finish, manufacturer, recycled content, adhesive system, or warranty?no.
66Pull-up rack anchoring: For the twelve bolted pull-up racks being removed and reinstalled, should the contractor reuse the existing anchor locations/hardware where serviceable, or furnish new anchors and patch abandoned penetrations?yes
67Transitions/edges: Are reducers, transition strips, edge ramps, cove base, or other transition materials required where the new rubber flooring meets the soccer pitch or other adjacent flooring?no
68Site information: Since the pre-award site visit is no longer mandatory, will the Government provide any available measurements, photographs, floor plans, or site-visit information to assist offerors that did not attend?yes. see photos and updated PWS
69Confirmation of current subfloor type (slab-on-grade, raised floor, etc.), if known.concrete
70Can the Government provide the approximate dimensions and/or square footage breakdown of the 6,000 SF TACFIT area, including the approximate SF of existing rubber flooring versus wood plank flooring to be removed?approx 5500 Sq Feet of existing flooring to be removed. 6200 sq feet to be installed. See updated PWS
71If available, could the Government please provide any floor plans, drawings, and/or photographs of the existing TACFIT area, including the current flooring and fitness equipment/rigs?yes. see photos and updated PWS
72Can the Government clarify how the existing rubber and wood flooring is currently secured (adhered, mechanically fastened, floating, etc.) and whether significant adhesive removal or floor preparation is anticipated?it is not
73Is there a required or basis-of-design manufacturer/product, color, or rubber flooring specification beyond the 3/8" high-durability requirement in the PWS, or may contractors propose an equivalent commercial fitness/weight-room flooring product?no
74For the twelve (12) existing pull-up racks/rigs to be removed and reinstalled, can the Government provide the manufacturer/model or photographs of the equipment and clarify whether the contractor is responsible for furnishing new anchoring hardware?yes. see photos and updated PWS
75Aside from the twelve (12) pull-up racks/rigs, can the Government provide an approximate quantity/type of fitness equipment that will need to be moved and reinstalled?contractor is not responsible for moving other fitness equipment
76Additionally, would the Government consider a brief extension of the quotation deadline, if possible? Several vendors are currently working to develop complete turnkey pricing, and the additional time would allow us to incorporate any clarification provided and submit our most complete and competitive quotation.No extension is being provided at this time.
77Checking in to see if by chance someone could please email me some pictures of the facility, specifically how and where the "uneven" flooring surface areas. I would greatly appreciate your time and effort and it would help me send in an appropriate bid so we do not have any change ordersyes. see photos and updated PWS
78The lead time for the proposed 3/4" rubber flooring is over a month long. Since the current POP is from 10/1/26-10/31/26, the material may not be available. Is it possible to get a few extra weeks to procure and install given the circumstances ?PoP start date has been updated to 15 Oct 26 - 15 Nov 26.
79During the site walk, it was discussed that the thickness of the flooring material will be changed through an Amendment. When will the Amendment be issued and, will the proposal submission date be extended ?Floor thickness measurement has been updated in Amendment 00002
80What is the height of the track from the floor ? Knowing it will help us with setting a slope and during installation.
1/2 inch
81Please confirm the offer due time: 11:00 AM or
11:00 PM CDT on September 21, 2026.this is also Question 12 and Question 17
82Please confirm work hours are Monday–Friday, 7:30 AM–8:00 PM local timeconfirmed
83Please confirm whether PWS Sections 2.2 and 4–6 were intentionally omittedintentionally omitted. Contract of this size does not require QASP
84Does the 30-day performance period begin on October2. 1, 2026, or upon issuance of the NTP?Period of Performance has been changed to 15 Oct 26 - 15 Nov 26
85Will electricity be available for contractor use?standard 120 v electricity is available
86Will restrooms be available for contractor use?of course
87Will on-site space be available to temporarily store removed equipment?yes
88Please provide a floor plan or sketch with TACFIT area dimensions.duplicate... see photos and new PWS
89What equipment, besides the twelve (12) pull-up 2. racks, must be moved and reinstalled? Please include quantities and approximate weights.None.
90Please confirm any required color, pattern, or finish for the 3/8-inch rubber flooringno requirement other than smooth
91Please provide the approximate SF of existing rubber flooring and wood plank flooring to be removed5500
92Is there any underlayment or subfloor beneath the existing flooring that must also be removed? If so, please identify the typeno
93Is concrete moisture testing or mitigation required?no
94Are transition strips, reducers, edge profiles,or other termination details required?yes
95Please determine exactly how much leveling, grinding and patching is requiredminimal
96May existing pull-up rack anchors be reused,or is new hardware required? If so please provide the type.yes
97Will the entire TACFIT area be available during construction, or must the work be phased?entire area will be closed to patrons and available for work
98Has the existing flooring/adhesive been tested for asbestos or other hazardous materials? If not, is testing part of the contractor’s scope?no
99Is a warranty required? If so, please specify the required warranty period and coverage.yes standard warranty for rubber flooring
100Are cove base or baseboards required? If so, please specify the material, type, height, and quantity.yes. Contractor should provide expertise on this
101Does any equipment require electrical, data, or other utility disconnection before removal?no
102Please clarify whether the Project Manager must be physically on-site during all work, or if local availability is sufficientPhysically on site at least once daily
103Are dust barriers, HEPA vacuuming, or low-VOC products required?no