Attachment 02 - Tower Pictures.pdf

PDF 3 MB Posted

Attached to
Non-Resettable Flow Meter
Solicitation number
FA460026Q0036
Issued by

About this file

This document is a technical specification and equipment reference file for a training facility infrastructure project, containing photographs, dimensional drawings, equipment schedules, and LPG piping system diagrams.

The document includes detailed photographic documentation of a propane distribution system with specific measurements: a manifold assembly measuring 62½" in length and 14" in height; piping runs of 70" and 11' in length; a structural tower framework measuring 10' by 6' with components positioned 115' from a storage tank; and flow direction indicators. Building specifications reference an electrical switch and conduit installation. Equipment schedules specify ASME code-approved horizontal propane storage tanks with a 10,000-gallon capacity, formed concrete support structures, and detailed fittings and accessories per sheet PP-3. The pressure regulator and pressure gauge schedule identifies multiple service lines including left wing ground, engine, cargo, passenger compartment, battery compartment, cockpit, wheel well, and AFU configurations with specific regulator sizes (A, B, C) and pressure specifications ranging from 100 PSI inlet to 20-88 PSI outlet adjustable capacities. The LPG piping diagram illustrates a comprehensive system with 2½" underground piping to tower, pressure regulators (inlet 60-175 PSI, outlet 30 PSI, 50 GPM capacity with 30 PSI minimum differential), ball valves, solenoid valves, emergency shut-off valves with fused element actuators at 250°F, 2" manifold connections, and pressure gauges with 0-10 PSI range. All components are specified for accessibility from control tower platforms.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

62 ½”

14”

70”

11’

10’ 6’

115’ from tank

Pictures after this point are from the building specs for the training tower. Should give a general idea of pressure ranges.

Electrical Switch and Conduit

** Above picture is for the aircraft mock**

File details come from the government source that posted it. Updated .