Attachment 3_Grounds MX _ Pricing Schedule A_03.04.26.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Grounds Maintenance
Solicitation number
FA460026Q0016
Issued by

About this file

This is a Pricing Schedule A for grounds maintenance services at Offutt Air Force Base (OAFB). The schedule outlines unit prices for pesticide applications and grounds maintenance work including spring and fall herbicide applications ($128.92 and $450.03 respectively), spring and fall insecticide applications ($450.03 each), and pruning and removal services for trees and shrubs of varying sizes. Tree removal timeframes are specified based on diameter: Extra Small trees (3" or smaller) within 2 workdays, Small trees (3" to less than 24") within 5 workdays, and Medium to Large trees (24" and above) within 10 workdays. The schedule also includes unit pricing for replacement plantings including deciduous shrubs (5-gallon containers), evergreen shrubs (5-gallon containers), deciduous trees (2-inch caliper), and evergreen trees (6-8 feet height), all referenced to CLIN X018.

This pricing schedule supports solicitation FA460026Q0016 for Grounds Maintenance at Offutt AFB, with quotes due by 12:00 PM CST on Wednesday, March 11, 2026, to be submitted via email to nichole.barragan.2@us.af.mil and casey.hupton.1@us.af.mil. A mandatory site visit was scheduled for Monday, February 23, 2026 at 09:00 AM CST. The contract requires non-personal services including all personnel, equipment, tools, and supervision necessary to maintain healthy grounds and present a clean, professional appearance. Questions regarding the solicitation were due by Friday, February 27, 2026, with answers posted by March 3, 2026. Amendment 006 updated this attachment in response to technical questions and answers provided during the solicitation process.

View the file

Other files

File Type Posted
FA460026Q0016 - Technical Q and A v4.pdf PDF
Combination Synopsis_Solicitation FA460026Q0016 Final v2.pdf PDF
Attachment 21_IPM_OFFUTT_PESTICIDE INVENTORY_3.4.26.xlsx XLSX spreadsheet
FA460026Q0016 - Technical Q and A Final.pdf PDF
Attachment 1_ PWS _ Grounds Mx _ 3.2.26.docx DOCX document
Combination Synopsis_Solicitation FA460026Q0016 Final.pdf PDF
Combination Synopsis_Solicitation FA460026Q0016 v4.pdf PDF
Attachment 15_CDRL_A004_QCP_2.26.2026.pdf PDF
Site Visit Map 2026.pdf PDF
Attachment 11_EAL 1-55 SFS Form 31-Base Entry Authorization List_2.11.25.pdf PDF
Attachment 2 - Grounds Descriptions and Workload Estimates 12.10.2025.pdf PDF
Attachment 3_Grounds MX _ Pricing Schedule A.xlsx XLSX spreadsheet
Attachment 8_APPENDIX H - HAZARDOUS MATERIAL REQUEST_12.8.25.pdf PDF
Attachment 9_Appendix I - Areas known to hold water_6.11.25.pdf PDF
Attachment 10_Wage Determination 2015-5005 v27_12.3.25.txt TXT text file
Attachment 12_CDRL_A001_IPM_1.28.26.pdf PDF
Attachment 14_CDRL_A003_HazMat Inventory_1.28.26.pdf PDF
Attachment 15_CDRL_A004_QCP_1.28.26.pdf PDF
Attachment 18_CDRL_A007_Pass and ID_1.28.26.pdf PDF
Attachment 5_Appendix B2 Building 500 Building 185 and Kenney Gate_12.8.25.pdf PDF
Attachment 4_Appendix B Grounds Map 2026 _12.8.25.pdf PDF
Attachment 6_Appendix B3 B1000 Mx_Redacted_12.8.25.pdf PDF
Attachment 7_Appendix B4 Parade Field and Static Displays_12.8.25.pdf PDF
Attachment 11_EAL 1-55 SFS Form 31-Base Entry Authorization List - 11 Feb 2025 (1).docx DOCX document
Attachment 13_CDRL_A002_Pesticide Report_1.28.26.pdf PDF
Attachment 16_CDRL_A005_Schedule_1.28.26.pdf PDF
Attachment 20_CDRL_A009_POCs_1.28.26.pdf PDF
Combination Synopsis_Solicitation FA460026Q0016 v3.pdf PDF
Attachment 1_PWS_Grounds Mx_1.27.26.pdf PDF
Attachment 17_CDRL_A006_HazMat Final_1.28.26.pdf PDF
Attachment 19_CDRL_A008_Crisis Plan_1.28.26.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pesticide Applications Offutt AFB
Pricing Schedule AImproved GroundsBASH
Spring Herbicide128.92450.03
Fall Herbicide128.92450.03
BYOY1OY2OY3OY4ExtensionSpring Insecticide450.03
Prune Extra SmallFall Insecticide450.03
Prune Small
Prune Medium
Prune Large
Remove Extra Small
Remove Small
Remove Medium
Remove Large
Deciduous shrub
Evergreen shrub
Deciduous Tree
Evergreen Tree
Tree sizes are defined in paragraph 1.9.1.4 in the PWS
•Large Trees: Diameter 36” and above, remove within 10 workdays from the work order date.
•Medium Trees: Diameter 24” to less than 36”, remove within 10 workdays from the work order date.
•Small Trees: Diameter 3” to less than 24”, remove within 5 workdays from the work order date.
•Extra Small Trees: Diameter 3” and smaller, remove within 2 workdays from the work order date.

Decidous Shrub, 5 Gallon container for replacement CLIN X018 Evergreen Shrub, 5 Gallon Container for replacement CLIN X018 Desiduous Tree, 2 Inch Caliper or equivalent for replacement CLIN X018 Evergreen Tree, 6-8 Ft height or equvalent for replacement CLIN X018

File details come from the government source that posted it. Updated .