This is a standardized Electric Power Outage Report form used by the 55th Civil Engineer Squadron to document and track electrical power disruptions at Offutt Air Force Base. The form serves as a template for recording outage incidents and is not specific to a particular contract opportunity.

The form captures essential outage information including date, time of occurrence, and whether the outage was scheduled or unscheduled. It documents the number of generators affected and failures, identifies the main problem category (commercial power, backup power, distribution, substation, equipment, UPS, lighting, power conditioner, or frequency converter), and lists affected facility numbers with their assigned missions. The form includes standardized coded references for commercial power item faults (35 categories ranging from batteries to transformers), causes of failures (20 options from arcing to discharge), backup power item faults (9 categories), and backup power failure causes (14 options). Section 9 identifies the specific electrical circuit involved, referencing multiple OPPD (Omaha Public Power District) circuit numbers and Burt County power sources. The form concludes with spaces for the person completing the report and additional comments. This is an internal Air Force administrative document rather than a federal contract solicitation.

View the file

Other files

File Type Posted
Combined Synopsis.Solicitation - FA460026Q0013 - Updated 3.9.26.pdf PDF
Technical Questions B518 and Answers.pdf PDF
Attachment 23 - Appendix D - Customer Complaint Record - 3-4-26.pdf PDF
Attachment 20 - Appendix A - AF Form 487 Generator Inspection Form - 3-4-26.pdf PDF
Attachment 1_PWS B518 Power Generator Plant_3.5.26.pdf PDF
Attachment 22- Appendix C - Corrective Action Report - 3-4-26.pdf PDF
Attachment 25 - Appendix F - 20240808 - v2 CEO Tank Compliance Docs and Long Regs - 3-4-26.pdf PDF
Combined Synopsis.Solicitation - FA460026Q0013 - Updated 3-4-26.pdf PDF
Attachment 24 - Appendix E - 20250605 - Env Spec Conditions - Division 1-01 57 19-1C _3 Rev2- 3-4-26.pdf PDF
Combined Synopsis.Solicitation - FA460026Q0013 - Unlocked Version.pdf PDF
Attachment 1 - PWS - 27Jan2026.docx DOCX document
Attachment 10 - dd1423_DL009_Fuel Tank Repairs - 2_2_26.pdf PDF
Attachment 6 - dd1423_DL005_Calibration - 2_2_26.pdf PDF
Attachment 14 - dd1423_DL013_Mobilization - 2_2_26 .pdf PDF
Attachment 13 - dd1423_DL012_QCP - 2_2_26.pdf PDF
Attachment 17 - dd1423_DL016_Closeout Plan - 2_2_26 .pdf PDF
Attachment 3 - dd1423_DL002_EPMI - 2_2_26.pdf PDF
Attachment 2 - dd1423_DL001_SOP - 2_2_26.pdf PDF
Attachment 19 - EAL 1-55 SFS Form 31-Base Entry Authorization List - 11 Feb 2025.docx DOCX document
Attachment 5 - dd1423_DL004_Monthly APIMS - 2_2_26.pdf PDF
Attachment 16- dd1423_DL015_Mission Essential - 2_2_26.pdf PDF
Attachment 9 - dd1423_DL008_Fuel Tank Consumption - 2_2_26 .pdf PDF
Attachment 15 - dd1423_DL014_Labor Reporting - 2_2_26 .pdf PDF
Attachment 12- dd1423_DL011_STAR Monthly log - 2_2_26.pdf PDF
Attachment 11 - dd1423_DL010_Fuel Tank Spills - 2_2_26 .pdf PDF
Attachment 7 - dd1423_DL006_Outage reporting - 2_2_26.pdf PDF
Combined Synopsis.Solicitation - FA460026Q0013.pdf PDF
Attachment 8 - dd1423_DL007_Employee Roster - 2_2_26.pdf PDF
Attachment 4 - dd1423_DL003_Weekly EPMI - 2_2_26.pdf PDF
Attachment 18 - WD 2015-5005 V.27, - 03-12-2025 (1).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

55TH CIVIL ENGINEER SQUADRON

ELECTRIC POWER OUTAGE REPORT

(1) DATE:

TO:

FROM:

BASE:

REPORTED BY:

DATE/TIME OUT: DATE/TIME IN:

(2) WAS THIS POWER OUTAGE A SCHEDULED (S) OR UNSCHEDULED (U)

NUMBER OF GENERATORS AFFECTED:

NUMBER OF GENERATOR FAILURES:

(3) MAIN PROBLEM:

C - COMMERCIAL POWER D - DISTRIBUTION S - SUBSTATION

B - BACKUP POWER E - EQUIPMENT

U - U.P.S.

L - A/F LIGHTING

P - POWER CONDITIONER F - FREQUENCY

CONVERTER

(4) LIST BUILDING NUMBERS AND FUNCTIONS:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Facility Number: Mission:

Continued on page 3

(5) COMMERCIAL POWER ITEM FAULT:

01 - BATTERY 13 - CROSSARM

02 - BUSS 14 - CUT-OUT

03 - BUSHING 15 - DISCONNECT

04 - CABLE OH/PRI 16 - FUSES

05 - CABLE UG/PRI 17 - INSULATOR

06 - CABLE OH/SEC 18 - LIGHTNING PROT

07 - CABLE UG/SEC 19 - POLE

08 - CAPACITOR 20 - POTHEAD

09 - CIRCUIT BREAKER 21 - REGULATOR

10 - CONNECTOR/PRI 22 - RELAY

11 - CONNECTOR/SEC 23 - SERVICE DROP

12 - CONTROLS 24 - SWITH/AIR

(6) CAUSE:

01 - ARCING 08 - GROUND

02 - BLOWN 09 -INSULATION

03 - BROKEN 10 - OPERATOR

04 - BURNT 11 - LOOSE

05 - CORROSION 12 - OBJECT IN CKT

06 - CUT 13 - OPEN

07 - CUT DIGGING 14 - OVERHEAT

25 - SWITCH/OIL

26 - SWITCH/GAS

27 - TRFMR - DIST/AIR

28 - TRFMR - DIST/OIL

29 - TRFMR - CT

30 - TRFMR - INSTRMT

31 - TRFMR - PT

32 - TERMINATOR

33 - O.C.B.

34 - A.C.B.

35 - OTHER _________

99 - NOT APPLICABLE

15 - OVERLOAD

16 - SHORTED

17 - TRIPPED

18 - WEATHER

19 - OTHER__________

20 - DISCHARGE

99 - NOT APPLICABLE

(7) BACK-UP POWER ITEM FAULT:

04 - COOLING SYSTEM 07 - V-BELTS

05 - START SYSTEM 08 - VOLT REG

01 - ENGINE

02 - GENERATOR

03 - FUEL SYSTEM 06 - BATTERY(S) 09 - ATS

(8) CAUSE:

01 - ARCING 06 - LOOSE 11 - LOW OIL

02 - BLOWN 07 - OVERHEAT 12 - FUEL

03 - BROKEN 08 - OVERLOAD 13 - OPERATOR ERROR

04 - BURNT 09 - SHORTED 14 - OTHER_________

05 - CORROSION 10 - TRIPPED

(9) CIRCUIT:

07 - 1195 OPPD

08 - 1196 OPPD

09 - 1197 OPPD

10 - 1198 OPPD

11 - 1199 OPPD

01 - 183 OPPD

02 - 241 OPPD

03 - 242 OPPD

04 - 244 OPPD

05 - 334 OPPD

06 - 355 OPPD 12 - 2000 OPPD

13 - 2001 OPPD

14 - 2002 OPPD

15 - 2003 OPPD

16 - 2004 OPPD

17 - 2005 OPPD

18 - Burt County

OUTAGE REPORT COMPLETED BY:

ADDITIONAL COMMENTS IF REQUIRED:

Check Box1:
0: Off
1: Off
2: Off
Check Box2:
0: Off
1: Off
2: Off
Check Box3:
0: Off
1: Off
2: Off
Check Box4:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
Check Box5:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
Check Box6:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
Check Box7:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
Check Box8:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
Check Box9:
0: Off
1: Off
3: Off
4: Off
5: Off
Check Box10:
0: Off
1: Off
2: Off
Check Box11:
0: Off
1: Off
2: Off
Check Box12:
0: Off
1: Off
2: Off
Check Box13:
0: Off
1: Off
2: Off
3: Off
4: Off
Check Box14:
0: Off
1: Off
2: Off
3: Off
4: Off
Check Box15:
0: Off
1: Off
2: Off
3: Off
Check Box17:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box18:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box19: Off
Check Box20: Off
Text21:
0: B185
1: B518
2: E4-N
3: B301
4: 565
5:
6:
7:
8:
9:
10:
11:
12:
Text22:
0: AFWA
1: Power Plant
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
Text23:
Text24:
Check Box25: Off
Check Box26: Off
Date27_af_date:
Date28_af_date:
Text29:
Text30: Offutt
Text31:
Text32:
Text33:
Text34:
Text35:
Text36:
Text37:
Text38:
Check Box41:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Date1_af_date:
Text1:
Text4:
Text2: CP service
Text3:
Text5:

File details come from the government source that posted it. Updated .