The document is a PowerPoint file (20th IS ductwork map with notes.pptx) containing a detailed ductwork diagram for the 20th IS facility, illustrating the air handling units (AHU-1 through AHU-5) with color-coded air flow paths and duct sizes. The image provides technical details about air distribution, including supply air, return air, outside air, and exhaust air routing through various rooms and spaces.

The related federal contract opportunity (Solicitation FA460025Q0025) is for the 20th IS controls upgrade and duct cleaning at Offutt Air Force Base. The project involves replacing obsolete Excel 5000 series controllers, reprogramming control systems, and comprehensive ductwork cleaning for approximately 30,000 sq ft. Key dates include a site visit on 6 March 2025, question submission deadline of 10 March 2025, and offer due date of 17 March 2025 at 10:00 AM CST. The solicitation is issued by the Department of the Air Force Air Combat Command, with point of contact SrA Thearith Em for questions and pass requests.

View the file

Other files for this federal contract opportunity

Other files attached to 20th IS controls upgrade and duct cleaning, newest first.
File Type Posted
25 Flr Plans Areas E F AC.PDF PDF
26 AHUs Sections Dtls.PDF PDF
19 Lower Level Mech.PDF PDF
20th site visit sign-in sheet.pdf PDF
6 Control Schematics.PDF PDF
21 Flr Plan Area A AC.PDF PDF
2 20th IS Floor Plan.PDF PDF
20250121 - Env Spec Conditions - Division 1 - 01 57 19 - 1C _3.pdf PDF
22 Flr Plan Area B AC.PDF PDF
23 Flr Plan Area C AC.PDF PDF
M7 Mech Schedules.PDF PDF
3 Control Schematics.PDF PDF
4 Control Schematics.PDF PDF
M4 Mech Flr Plan Area B.PDF PDF
5 Points Lists.PDF PDF
Technical Q and A for 20th IS controls upgrade and duct cleaning..pdf PDF
M3 Mech Flr Plan Area A.PDF PDF
24 Flr Plan Area D AC.PDF PDF
Solicitation - FA460025Q0025.pdf PDF
55 SFS NCIC Screening Pass Request.pdf PDF
Wage determination.pdf PDF
B301 20th IS Controls Upgrade and Duct Cleaning PWS.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

These last two rooms are open-ceiling back to double doors Fan coil does not appear to be working Bathrooms in mech/storage area exhaust out to open mech/storage area These three empty offices served by defunct package unit in one of their ceilings Has ducted return in this room but also open return above ceiling, but no open return plenum grills EF runs 24/7 in these two rooms, expels through roof/ceiling To crac & underfloor distribution Fan coil only has CW, no fresh air No return air in this room

AHU-1

AHU-3

AHU-2

AHU-4

AHU-5

Green = Supply Air Orange = Return Air Dark Blue = Outside Air Light Blue = Exhaust 40”x24” 40”x24” 72”x24” 26”x24” 60”x24” 72”x24” Exhaust size unknown 72”x24” 72”x24” 54”x28” 20”x16” 36”x14” 28”x14” 28”x20” Large EF duct from bathrooms exits here (30”x16”) Large EF duct from bathrooms exits near here (30”x16”) 20”x10” 20”x12” 10”x10” 10”x10” 8”x10” 10”x10” image1.png