Attachment 9 - Q and A (2).pdf

PDF 92 KB Posted

Attached to
Repair NC3, 2F, WG CP/CAT Federal contract opportunity
Solicitation number
FA460020B0002
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains questions and answers related to a federal contract solicitation for repair work at an Air Force facility. The scope of work includes renovating approximately 8,120 square feet into a command post and making other facility upgrades. Questions cover topics such as design details for railings and platforms, insulation specifications and material thicknesses, floor and bathroom plans, and salvage rights for cypher lock hardware. The responses provide clarification such as attaching revised specification sections and indicating that certain existing equipment will be removed and delivered to another facility location.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS and ANSWERS Repair NC3, 2F, 55 WG/CP & CAT, B500 (SGBP 18-0041)

95. Question: Do you know if there will be a detail submitted for the railing around the platforms and stairs? It wasn’t clear if the railing needs to be completely designed or if there was something the architect/owner wanted for those locations.

Answer: See attached revised sheet A-103 answering the below question

96. Question: This may be more for the architect, In 051200 there seems to be a specification that is calling out an AISC Certified fabricator (AISC 207). Could this be excluded or could an exception be made?

Answer: We need to keep this requirement in the specifications to ensure quality welding at the platforms, etc.

97. Question: I am a mechanical insulation sub-contractor and am looking to bid the project mentioned in the subject line and you are listed as the point of contact. Upon review of the insulation specification pages, I am unable to locate the “table 2” listing of piping insulation thicknesses (see below excerpt). Typically, in situations like this I reach out to the mechanical engineer who created the specifications, however, when attempting this I was instructed that I must submit any questions through the government.

Example:

“3.2.2.1 Insulation Material and Thickness Insulation thickness for cold pipelines shall be determined using Table 2.”

Answer: We need to keep this requirement in the specifications to ensure quality welding at the platforms, etc.

See attached revised spec section 23 07 00

98. Question: In section 23 07 00 there is no Table 2 and thus no listing of required material thicknesses – without this, I cannot accurately estimate our material costs. Please advise.

Answer: See attached revised spec section 23 07 00

99. Question: On page 401 the enlarged plan 2 A-401 it says go to 12 on A-401 but that is a view of the bathroom do you know what is supposed to go in this area? Also, page A-402 Detail 4 A,B,C it does not call out a countertop is this supposed to be SS-1?

Answer: See the attached revised sheet A-401

100. Question: Will the government be able to have salvage rights to the cypher lock hardware including the XO type?

Answer: The contractor shall remove the cypher lock/XO type from the existing doors in 2F corridor scheduled for demo and deliver to the XP office located in Room 2G2.

END OF QUESTIONS AND ANSWERS