Section_J _Attachment_17_-_SEMS_III_Cost_Price_Model_V2.0_11_Apr_13.xlsx

XLSX spreadsheet 224 KB Posted

Attached to
Systems Engineering, Management, and Sustainment (SEMS) III
Solicitation number
FA4600-12-R-0013
Issued by

About this file

Section J Attachment 17 SEMS III Cost/Price Model

View the file

Other files

File Type Posted
Section_J _Exhibit_A _CDRL_A039-040_SW_Code-Data_Mgmt_Plan_28_Jan_14.pdf PDF
Section_J _Attachment_1_-_SEMS_III_Contract_PWS_V1.4_28_Jan_14.docx DOCX document
Section_J _Attachment_19_-_SEMS_III_Annual_Sustainment_PWS_V1.3_28_Jan_14.docx DOCX document
Section_J _Attachment_7_QASP_v7.1_19_Mar_14_clean.docx DOCX document
FA4600-12-R-0013-0004.doc DOC document
SEMS_III_Q A__10.docx DOCX document
Section_J _Attachment_19_-_SEMS_III_Annual_Sustainment_PWS_V1.3_25_SEP_13.docx DOCX document
Section_J _Attachment_7_QASP_v7.1_25_Sep_13.docx DOCX document
Section_J _Attachment_20_-_SEMS_III_SWAFS_Sustainment_PWS_V1.2_25_SEP_13.docx DOCX document
Section_J _Attachment_22_-_Work_Breakdown_Structure_25_Sep_13.xlsx XLSX spreadsheet
Section_J _Attachment_1_-_SEMS_III_Contract_PWS_V1.4_25_Sep_13.docx DOCX document
Section_J _Attachment_21_-_Advanced_Meteorological_Model_Development_Project_PWS_25_Sep_13.docx DOCX document
Section_J _Exhibit_A _CDRL_A047-048_Change_Request-Subcontracting_Reports_3_Dec_13.pdf PDF
Section_J _Attachment_23_-_Workload_Estimates_25_Sep_13.docx DOCX document
Section_J _Attachment_6_-_Incentive_Fee_Plan_V1.4_25_Sep_13.docx DOCX document
Section_J _Attachment_11_-_Past_Performance_Information_8_May_13.docx DOCX document
FA4600-12-R-0013 _Amendment_0002_as_in_PD2.doc DOC document
Section_J _Attachment_19_-_SEMS_III_Annual_Sustainment_PWS_V1.3_13_May_13.docx DOCX document
SEMS_III_Q A__9_on_RFP _15_May_2013.docx DOCX document
SEMS_III_Q A__8_on_RFP _13_May_2013.docx DOCX document
FA4600-12-R-0013-0001_as_in_PD2.doc DOC document
Section_J _Attachment_1_-_SEMS_III_Contract_PWS_V1.4_29_Apr_13.docx DOCX document
Section_J _Attachment_19_-_SEMS_III_Annual_Sustainment_PWS_V1.3_29_Apr_13.docx DOCX document
Section_J _Attachment_20_-_SEMS_III_SWAFS_Sustainment_PWS_V1.2_29_Apr_13.docx DOCX document
SEMS_III_Q A__7_on_RFP_2_May_2013.xlsx XLSX spreadsheet
Section_J _Attachment_4_-_Wage_Determination.docx DOCX document
Section_J _Exhibit_A _CDRL_A023-024_ILSP-Use_Case.pdf PDF
Section_J _Exhibit_A _CDRL_A033-034_Drawings-Calibration_and_Repair_Records.pdf PDF
Section_J _Exhibit_A _CDRL_A029-030_DAL-Risk_Mgmt_Database.pdf PDF
Section_J _Exhibit_A _CDRL_A011-012_Sys_Seg_Spec-Con_Trans_Plan.pdf PDF
Section_J _Attachment_5_-_Integrated_Team_Process_User's_Guide.docx DOCX document
Section_J _Attachment_12_-_Questionnaire_Cover_Letter_27_Mar_13.docx DOCX document
Section_J _Exhibit_A _CDRL_A003-004_VDD-TO_Proposal.pdf PDF
Section_J _Attachment_6_-_Incentive_Fee_Plan_V1.4_27_Mar_13.docx DOCX document
Section_J _Exhibit_A _CDRL_A035-036_SW_Design_Desc-Trng_Material.pdf PDF
Section_J _Exhibit_A _CDRL_A021-022_QA_Plan-Sys_Trans_Plan.pdf PDF
Section_J _Attachment_24_-_SB_Subcontracting_Plan_Review_Checklist.xls XLS spreadsheet
Section_J _Attachment_21_-_Advanced_Meteorological_Model_Development_Project_PWS_V1.1.docx DOCX document
Section_J _Attachment_1_-_SEMS_III_Contract_PWS_V1.4.docx DOCX document
Section_J _Exhibit_A _CDRL_A055_SW_Prod_Spec.pdf PDF
Section_J _Attachment_3_-_DD254_V0.5_for_RFP_for_SEMS_III_dtd_22_Mar_13.docx DOCX document
Section_J _Exhibit_A _CDRL_A025-026_User's_Man-Interface_Design_Doc.pdf PDF
Section_J _Exhibit_A _CDRL_A049-050_SW_Develop_Plan-Config_Change_Request.pdf PDF
Section_J _Attachment_15_-_Sub_Teaming_Consent_Letter.docx DOCX document
Section_J _Attachment_14_-_Past_Perf_Tracking_Record.docx DOCX document
Section_J _Exhibit_A _CDRL_A001-002_Tech_Rpt-IRS.pdf PDF
Section_J _Attachment_8_-_NCIC_Data.docx DOCX document
Section_J _Exhibit_A _CDRL_A053-054_DBDD-Trouble_Shooting_Aids.pdf PDF
Section_J _Attachment_18_-_DOL _EEOC_Clearance_Request_Information.doc DOC document
Section_J _Exhibit_A _CDRL_A005-006_Test_Plan-Test_Report.pdf PDF
Show 40 more

Latest 50 of 206 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directions

COST/PRICE MODEL DIRECTIONS FOR
RFP FA4600-12-R-0013
Systems Engineering, Management and Sustainment III Pricing Model
Assumptions:
1.The Fringe Benefit allocation base is total labor dollars.
2.The Labor Overhead allocation base is total direct labor dollars PLUS associated fringe benefit.
3.The G&A allocation base is total cost input.
4.DCAA audited Facilities Capital Cost of Money (FCCoM), is incorporated in TAB "Loading Factors". Must submit DD 1861.
5.Overtime for exempt personnel is based on a total time accounting concept. (Annual salary divided by
total hours worked, equals the hourly rate). Overtime for labor category rates is 1.5 times the straight time rate.
6.The Government will rely on Offerors to tell us in the TAB "Loading Factors" what their annual Full Time Equivalent (FTE) is per year.
7.Fixed Fee is not applied to ODCs Travel and Materials.
8.Client site refers to work done at Government locations.
9.Total includes fixed numbers for ODC & Travel cost. The dollar figure includes all burdens.
Directions for PRIME:(ONLY FILL IN AREAS HIGHLIGHTED IN YELLOW)
1.Primes should delete TABs SUB Labor Prime Fills in, Grand Total, and CPIF SHAREs before sending to their Subcontractors.
2.Primes shall manually fill in TAB SUB Labor Prime Fills in, for their Subs the labor category, hours, rate and type of contract (use dropdown menu).
3.Primes will bid ODC Travel & Material/Equipment costs at the Dollar amount provided with the exception of CLIN 1013. Includes all burdens.
4.Primes will bid License costs by completing the CLIN 1013 tab. Material Handling rates from the Loading factors tab are applied. Besides inserting
cost, Primes will complete the Level of Support column to identify the level of support to be purchased (e.g., Standard, Premier, 24x7) if the vendor offers
different levels of support.
5.Primes shall fill in the TABs CLIN 1002 Option 1 Breakdown, TAB CLIN 1003 Option 1 Breakdown, and TAB CLIN 1012 Breakdown
with both Prime and Sub hours.
Directions for both PRIME & SUB(s):
1.If the assumptions are valid, fill in only the cells that are highlighted in yellow, beginning with the company name at the top of TAB Loading Factors.
2.If the assumptions are not valid, modify appropriate loaded rates in the Loading factors TAB, and if needed throughout the TABs. Identify changes by
highlighting the cells with changed formulas in Green and describe the changes as well as the reasons for those changes in the space provided at the
bottom of the Loading Factors TAB.
3.Complete TAB CLIN X001, CLIN X002, CLIN X003, CLIN 0011 & CLIN 1012. Once you input the Labor Categories, direct rates, and hours the
remaining TAB columns and rows will automatically fill in.
4.The labor rates will automatically be adjusted based on Offerors inputs in the Loading Factors TAB.
5.Complete TAB CLIN 1002 Option 1 Breakdown, TAB CLIN 1003 Option 1 Breakdown, and TAB CLIN 1012 Breakdown. These tabs
breakdown each major labor category into hours of specific WBS elements listed in this tab. All hours' totals for each major labor
category and the grand total of hours will equal the total hours on the corresponding CLIN TAB(s).
6.Complete TAB Benefit Summary for the employee compensation plan. Completion of this TAB is mandatory and satisfies the requirement for the
52.222-46 clause for Employee Compensation Plan. Reference "Employee Compensation Plan Guide" under this tab for additional details.
7.Shall have no more than two rounding places. We understand minor rounding errors. (Amounts in TAB Grand Total will be to the nearest whole dollar.)
8.If applicable provide your proprietary statement in the footer of each TAB.
9.Subcontractors that have a cost plus arrangement with the prime must submit a cost proposal if they have a Basis Of Estimate of 10% or more of the
Prime contractors total proposed cost. (If you have Subs that will be submitting a cost proposal, ensure they have an approved accounting system.)
Directions for SUBs:
1.Subcontractors must submit to 55th Contracting the following TABs Loading Factors, CLIN X001, CLIN X002, CLIN X003, CLIN 0011,
CLIN 1012, CLIN 1002 & CLIN 1003 Option 1 Breakdown, CLIN 1012 Breakdown, and Benefit Summary.
(Subs submit data only if they exceed the cost and pricing data dollar amount and 10% thresholds per FAR 15.404-3 (c) (1).)
2.Subcontractors must submit to their PRIMES their fully burden rates by Labor Category and hours for all CLINs so that the PRIMES can fill in the
TAB called SUB Labor Prime Fills in.
Helpful Hints and Reminders:
1.For approved DCAA loaded rates not identified in the Loading Factors TAB you can include these changes by inserting or deleting new rows or columns
in the middle of ranges, the applicable formulas and references for computational cells can be input using the "click and drag" technique.
2.Use the checklist provided below to ensure your proposal is complete.
Pricing Model Checklist
√Have the following been completed?
Subs were sent the Pricing Model with these eleven TABs: Directions, Loading Factors, all the CLIN Tabs, & Benefit Summary
Prime / Sub company names are entered on the Loading Factors TAB. (Company names automatically populate to the rest of the TABs)
Input your Indirect rates into the Loading Factors TAB.
If the pricing model formulas for applying the indirect rates are not consistent with company accounting practices,
the appropriate formulas have been modified,
the changed cells are highlighted in Green, and
the changes are explained at the bottom of the Loading Factors TAB.
Listed cognizant DCAA and DCMA representatives in the Loading Factors TAB.
Hours are entered into TABs CLIN 1002 Option 1 Breakdown, CLIN 1003 Option 1 Breakdown, and CLIN 1012 Breakdown.
If rates/categories differ from the model, the differences are explained at the bottom of the Loading Factors TAB.
Base year direct rates and hours are entered into TABS CLIN X001, CLIN X002, CLIN X003, CLIN 0011, and CLIN 1012.
Prime has manually filled in the TAB SUB Labor Prime Fills in with each one of the Subcontractor's Labor Categories, Hours & Rate.
Prime has manually input Subcontractor names and amounts in the Grand Total TAB for their associated ODC costs if any.
If applicable, supporting information for labor, indirect rates and or ODCs are provided in your Cost Volume Narrative. (Example: FCCoM DD Form 1861)
Supporting information for labor and indirect rates is provided in your Cost Volume narrative.
Ensure the Target, Adj, Final Cost in TAB CPIF SHAREs agrees with what you intended to submit for a Total Final Price for CLINS X002, X003 and 1012.
Benefits Summary TAB completed.

FA4600-12-R-0013, Section J, Attachment 17, TAB Directions

Loading Factors

LOADING FACTORS SEMS III
Prime Name:Offeror
Subcontractor Name:Sub
Base YearOption 1Option 2Option 3Option 4Option 56 Month Extension
LOADING FACTORS:TransitionFY15 Oct 14 - Sep 15FY16 Oct 15 - Sep 16FY17 Oct 16 - Sep 17FY18 Oct 17 - Sep 18Oct 18 - Jul 19Aug 19 - Sep 19Oct 19 - Jan 20
Labor Escalation0.00%0.00%0.00%0.00%0.00%N/AN/A
Fringe0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Overhead0.00%0.00%0.00%0.00%0.00%0.00%0.00%
FCCoM0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
OTHER LOADING FACTORS:
Independent R&D / Bid & Proposal Rate0.00%0.00%0.00%0.00%0.00%0.00%0.00%
IT (Computing)0.00%0.00%0.00%0.00%0.00%0.00%0.00%
If you pool FCCom as 1 pool: FCCoM, Direct Labor0.00%0.00%0.00%0.00%0.00%0.00%0.00%
If you pool FCCom as 1 pool: FCCoM, G&A0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
General and Administrative (G&A) Rate0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Material & Handling (Burden on ODC &/or Subs)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Target Fee 1 (Projects)10.00%10.00%10.00%10.00%10.00%10.00%10.00%
Target Fee 2 (S/M/II & Services)8.00%8.00%8.00%8.00%8.00%8.00%8.00%
Max Fee 1 (Projects)12.00%12.00%12.00%12.00%12.00%12.00%12.00%
Max Fee 2 (S/M/II & Services)10.00%10.00%10.00%10.00%10.00%10.00%10.00%
Min Fee 1 (Projects)5.00%5.00%5.00%5.00%5.00%5.00%5.00%
Min Fee 2 (S/M/II & Services)5.00%5.00%5.00%5.00%5.00%5.00%5.00%
Profit on Sub Labor (Only Prime fills this in)0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Profit0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Annual salary is divided by 2080 for direct labor*2080208020802080208020802080
Wrap Rate W/O fee (Auto calculated)-------
*All offerors will use 2080 unless they have identified Uncompensated Overtime. (See FAR 52.237-10)
YESNO
Do you have a Forward Pricing Rate Agreement?
If Cost Plus agreement with Sub(s) do they have a DCAA deemed adequate accting sys.
Identify your company's Full Time Equivalent (FTE) hours.0
Subcontractor identify the type of contract you have with the Prime?Drop Down Menu
DCAA, DCMA & CHANGES TO COST/PRICE MODEL
Prime Name:Offeror
Subcontractor Name:Sub
List your Cognizant DCAA and DCMA Representative or Branch:
Utilize the DCAA website to locate your audit office number at http://www.dcaa.mil/
The DCAA office listed below will be the same office the offeror sent their cost proposal to
Name & or Branch (If Branch, include Branch #):
Address:
Phone Number & Fax Number:Phone:Fax:
E-mail:
E-mail for DCAA is first name, a period, Last Name, @dcaa.mil OR you can use the DCAA branch number
dcaa-fao, Last 4 of the branch #@dcaa.mil Example: stanley.stearns@dcaa.mil OR dcaa-fao1621@dcaa.mil

DCAA, DCMA & CHANGES TO COST/PRICE MODEL, Cont.

Defense Contract Management Agency (DCMA) Cognizant office:
Name & or Location:
Address:
Phone Number & Fax NumberPhone:Fax:
E-mail:

CHANGES TO PRICING MODEL (ie.. Additional approved DCAA Loading Rates):

&12FA4600-12-R-0013, Section J, Attachment 17, TAB Loading Factors

CLIN X001

Prime Name:Offeror
Sub Name:Sub
CLIN X001 LABOR HOUR & COST BREAKDOWN
CLIN X001 (FFP)CLIN 1001 - Option 1CLIN 2001-Option 2CLIN 3001-Option 3CLIN 4001-Option 4
Systems MaintenanceFY15 Oct 14 - Sep 15FY16 Oct 15 - Sep 16FY17 Oct 16 - Sep 17FY18 Oct 17 - Sep 18
Labor CategoryHoursRateCostHoursRateCostHoursRateCostHoursRateCost
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
00.000.0000.000.0000.000.0000.000.00
Subtotal with FTE CLIN X0010ERROR:#DIV/0!$ - 00ERROR:#DIV/0!$ - 00ERROR:#DIV/0!$ - 00ERROR:#DIV/0!$ - 0
CLIN X001 (FFP) (Years Con't)CLIN 5001-Option 5CLIN 6001-6 Month ExtCLIN 6001-6 Month Ext
Systems MaintenanceOct 18 - Jul 19Aug 19 - Sep 19Oct 19 - Jan 20
Labor Category Contractor SiteHoursRateCostHoursRateCostHoursRateCost
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
00.000.0000.000.0000.000.00
Subtotal with FTE CLIN X0010ERROR:#DIV/0!$ - 00ERROR:#DIV/0!$ - 00ERROR:#DIV/0!$ - 0

&12FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN X001&"Arial,Bold"

&"Times New Roman,Regular" &"Times New Roman,Regular"&P / &N

CLIN X002

Prime Name:Offeror
Sub Name:Sub
CLIN 1002 Sys Engr, Prgm Mgmt/Sys Mgmt & Sys Sustainment:OPTION 1, FY15 Oct 14 - Sep 15
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 1, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 2002 Sys Engr, Prgm Mgmt/Sys Mgmt & Sys Sustainment:OPTION 2, FY16 Oct 15 - Sep 16
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 2, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 3002 Sys Engr, Prgm Mgmt/Sys Mgmt & Sys Sustainment:OPTION 3, FY17 Oct 16 - Sep 17
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 3, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 4002 Sys Engr, Prgm Mgmt/Sys Mgmt & Sys Sustainment:OPTION 4, FY18 Oct 17 - Sep 18
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 4, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 5002 Sys Engr, Prgm Mgmt/Sys Mgmt & Sys Sustainment:OPTION 5, Oct 18 - Jul 19
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 5, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 6002 Sys Engr, Prgm/Sys Mgmt & Sys Sustain:6 MONTH EXTENSION NO ESCALATION, Aug 19 - Sep 19
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
6 Month Ext, Aug 18 - Sep 18 TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 6002 Sys Engr, Prgm/Sys Mgmt & Sys Sustain:6 MONTH EXTENSION NO ESCALATION, Oct 19 - Jan 20
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
6 MONTH EXT, Oct 19 - Jan 20 TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
FTEs
ALL 5 OPTIONS + Ext TOTAL =ERROR:#DIV/0!0$ - 0$ - 0

&12FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN X002

&"Times New Roman,Regular"&P / &N

CLIN 1002 Option 1 Breakdown

SEMS III CONTRACTProgram Management/Systems Management
Systems Engineering, Management and Sustainment III
Prime Name:Offeror
Sub Name:Sub
CLIN 1002 Systems Engineering, Program Management/System Management and System Sustainment BREAKDOWNOPTION 1 ONLY (Oct 14 to Sep 15 portion only)
Systems EngineeringProgram Management/Systems ManagementSystems SustainmentGovernment Furnished Property and Services
System Engineering and Software Development Plans (2.1.1)Design Reviews (2.1.2) (Plan deliverable requirements only)Design and Development (2.1.4) (Plan deliverable requirements only)Test (2.1.5) (Plan deliverable requirements only)Weather Data Analysis Test Support (2.1.6)System Security Engineering (2.1.7) (Plan deliverable requirements only)Configuration Management (2.1.8)Power Study (2.1.10)Engineering Analysis (2.1.11)Program Management Plan and Reports (2.2.1) (include 4.1.11 report portion only)Monthly Status Review (2.2.2)CMMI Level 4 Processes (2.2.3)Data Management (2.2.4) (portion only) (include 4.1.11 report portion only)Security (2.2.5)Risk Management (2.2.6)System Performance Measurement (2.2.7)System Sustainment Plans (2.3.1)System Sustainment ServicesSoftware Maintenance (2.3.3)Time Compliance Network Order/Intelligence Community Vulnerability Alerts (2.3.4)Technical Support (2.3.13)Operational Security (4.1.11)Quality Assurance (4.3)TOTAL
Labor CategoryHOURS
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
000000000000000000000000
Contractor TOTAL000000000000000000000000
Systems Engineering TOTAL0Prgm Mgmt/Sys Mgmt TOTAL0Sys Sustain TOTAL0Govt TOTAL0
GRAND
TOTAL Hrs
0
FTEs
OPTION 1 (Oct 14 to Sep 15 portion only) FTEs TOTALS =ERROR:#DIV/0!

NOTE: Each Labor Category hour totals in column AA shall equal the appropriate labor category hours total in the "CLIN X002" Tab for the Option 1 year or the appropriate labor category hours total from the "SUB Labor Prime Fills in" Tab for the Option 1 year.

FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN 1002 Option 1 Breakdown

CLIN X003

Prime Name:Offeror
Sub Name:Sub
CLIN 1003 SWAFS System Sustainment:OPTION 1, FY15 Oct 14 - Sep 15
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 1, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 2003 SWAFS System Sustainment:OPTION 2, FY16 Oct 15 - Sep 16
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 2, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 3003 SWAFS System Sustainment:OPTION 3, FY17 Oct 16 - Sep 17
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 3, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 4003 SWAFS System Sustainment:OPTION 4, FY18 Oct 17 - Sep 18
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 4, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 5003 SWAFS System Sustainment:OPTION 5, Oct 18 - Jul 19
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
OPTION 5, TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 6003 SWAFS System Sustainment:6 MONTH EXTENSION NO ESCALATION, Aug 19 - Sep 19
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
6 Month Ext Aug18 - Sep 18 TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
CLIN 6003 SWAFS System Sustainment:6 MONTH EXTENSION NO ESCALATION, Oct 19 - Jan 20
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
6 MONTH EXT Oct 19 - Jan 20 TOTALS =ERROR:#DIV/0!0$ - 0$ - 0
FTEs
ALL 5 OPTIONS + Ext TOTAL =ERROR:#DIV/0!0$ - 0$ - 0

&12FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN X003

&"Times New Roman,Regular"&P / &N

CLIN 1003 Option 1 Breakdown

SEMS III CONTRACTProgram Management/Systems Management
Systems Engineering, Management and Sustainment III
Prime Name:Offeror
Sub Name:Sub
CLIN 1003 Space Weather Analysis and Forecast Systems (SWAFS) System Sustainment BREAKDOWNOPTION 1 ONLY (Oct 14 to Sep 15 portion only)
Program Management/Systems ManagementSystems SustainmentGovernment Furnished Property and Services
Program Management Plan and Reports (2.2.1) (include 4.1.11 report portion only)Monthly Status Review (2.2.2)Data Management (2.2.4) (include 4.1.11 report portion only)Risk Management (2.2.6)System Performance Measurement (2.2.7)System Sustainment Plans (2.3.1)System Sustainment ServicesSoftware Maintenance (2.3.3)Time Compliance Network Order/Intelligence Community Vulnerability Alerts (2.3.4)Operational Security (4.1.11)Quality Assurance (4.3) (portion only)TOTAL
Labor CategoryHOURS
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
Contractor TOTAL000000000000
Prgm Mgmt/Sys Mgmt TOTAL0Sustain TOTAL0Government TOTAL0
GRAND
TOTAL Hrs
0
FTEs
OPTION 1 (Oct 14 to Sep 15 portion only) FTEs TOTALS =ERROR:#DIV/0!

NOTE: Each Labor Category hour totals in column P shall equal the appropriate labor category hours total in the "CLIN X003" Tab for the Option 1 year or the appropriate labor category hours total from the "SUB Labor Prime Fills in" Tab for the Option 1 year.

FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN 1003 Option 1 Breakdown

CLIN 0011

Prime Name:Offeror
Sub Name:Sub
CLIN 0011 (FFP)CLIN 0011 - BASE PERIOD
TransitionTransition
Labor CategoryHoursRateCost
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
00.000.00
Cumulative Subtotal with FTE CLIN 00110ERROR:#DIV/0!0.00

&12FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN 0011

&"Times New Roman,Regular"&P / &N

CLIN 1012

Prime Name:Offeror
Sub Name:Sub
CLIN 1012 Adv Met Model Dev Project:OPTION 1, FY15 Oct 14 - Sep 15
DirectFringeOHB & PITG & AFCCoMFCCoMFCCoMTOTALTOTALTOTAL
Labor CategoryRateCostCostCostCostCostCCDLG&ARATEHOURSW/Out FCCoMWith FCCoM
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
0.000.000.000.000.000.000.000.000.000.000$ - 0$ - 0
TOTAL0$ - 0$ - 0
FTEs
Option 1, TOTALERROR:#DIV/0!0$ - 0$ - 0

FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN 1012

CLIN 1012 Breakdown

Systems Engineering, Management and Sustainment III
Prime Name:Offeror
Sub Name:Sub
CLIN 1012 Adv Met Model Dev Project BREAKDOWN
Systems EngineeringProgram Management/Systems ManagementGovernment Furnished Property and Services
System Engineering and Software Development Plans (2.1.1)Design Reviews (2.1.2)Technical Reviews (2.1.3)Design and Development (2.1.4)Test (2.1.5)System Security Engineering (2.1.7)Configuration Management (2.1.8)Safety Engineering (2.1.9)SEPIS Responses (2.1.13)Program Management Plan and Reports (2.2.1) (include 4.1.11 report portion only)Monthly Status Review (2.2.2)Data Management (2.2.4) (portion only) (include 4.1.11 report portion only)Risk Management (2.2.6)System Performance Measurement (2.2.7)Operational Security (4.1.11)Quality Assurance (4.3) (portion only)TOTAL
Labor CategoryHOURS
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
00000000000000000
Contractor TOTAL00000000000000000
Systems Engineering TOTAL0PM/Sys Mgmt TOTAL0Government TOTAL0
GRAND
TOTAL Hrs
0
FTEs
FTEs TOTALS =ERROR:#DIV/0!

NOTE: Each Labor Category hour totals in column U shall equal the appropriate labor category hours total in the "CLIN 1012" Tab or the appropriate labor cateogry hours total from the "SUB Labor Prime Fills in" Tab.

FA4600-12-R-0013, Section J, Attachment 17, TAB CLIN 1012 Breakdown

CLIN 1013

Prime Name:Offeror
Sub Name:Sub
Option 1
Besides inserting cost, Primes will complete the Level of Support column to identify the level of support to be purchased (e.g., Standard, Premier, 24x7) if the vendor offers different levels of support.
FY15 Oct 14 - Sep 15
SystemVendorItem(s) DescriptionMaintenance TypeLevel of SupportPurchase Quarter/ Renewal PeriodPart NumberCost
2GDPCybersoftVfind Security Toolkit Turbo Standard (26 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: VSTK-TMSI$0.00
ACAPSPGIPGI acelerator Fortan/C/C++ Workstation Linux (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: 218AL-WS$0.00
ACAPSMicrowayRed Hat Enterprise Linux Desktop 5 Standard Warranty Extension for MWYO4388 (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageMWYO4388$0.00
AFW-WEBSHPHP IC incl TS U Encl FIO 8-Svr Lic (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: 439034-B23$0.00
AFW-WEBSHPHP ICE-LX FIO Entitlement for 16 Licenses (9 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: 464432-B22$0.00
AFW-WEBSHPHP iLO Advanced Nm 1-Svr Lic (11 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: 512485-B21$0.00
AFW-WEBSHPHP iLO Adv BL incl 1 yr TS U 1-Svr Lic (5 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: 512488-B21$0.00
AFW-WEBSOnixGE-FUPRO license Domain 1 (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageP/N: GE-FUPRO-RN-GOV$0.00
AFW-WEBSOnixGoogle Earth Enterprise Server with support for up to 1000 total users Domain 1 (6 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: GE-SRV-RN-GOV)$0.00
AFW-WEBSOnixGEE Development Kit for Domain 1 includes

P/N: GE-FUPRO-12MO

P/N: GE-SRV-12MO

P/N: GE-PORTABLE-10USR-1YR

P/N: TSS (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: GE-ENTDEV-12MOSTD)$0.00
AFW-WEBSOnixGoogle Earth Enterprise Server with support for up to 1000 total users, Domain 3 (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: GE-SRV-RN-GOV)$0.00
AFW-WEBSOnixGEE Development Kit for Domain 3 includes

P/N: GE-FUPRO-12MO

P/N: GE-SRV-12MO

P/N: GE-PORTABLE-10USR-1YR

P/N: TSS (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: GE-ENTDEV-12MOSTD)$0.00
AFW-WEBSUKMOHorace V licence and associated services (1 each), 10/26/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
AFW-WEBSUKMOUnified Model Annual License Fee and Intialization Data Service (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
AFW-WEBSData WestSENCHA 08-EXT JS 4 Licenses and STD Supp (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: EXT JS 4.x)$0.00
AFW-WEBSSmart BearTest Execute SW (3 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: TXE-XV-FMR-WE)$0.00
CDFS-OSEDellCore Bundle Base License (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-CORE-BASE-MTCS)$0.00
CDFS-OSEDellData Progression Base License (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-DAPR-BASE-MTCS)$0.00
CDFS-OSEDellCore Bundle Expansion License (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-CORE-EXP-MTCS)$0.00
CDFS-OSEDellData Progression Expansion License (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-DAPR-EXP-MTCS)$0.00
CDFS-OSEDellCore Bundle Base License (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-CORE-BASE-MTCS)$0.00
CDFS-OSEDellData Progression Base License (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-DAPR-BASE-MTCS)$0.00
CDFS-OSEDellCore Bundle Expansion License (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-CORE-EXP-MTCS)$0.00
CDFS-OSEDellData Progression Expansion License (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: SW-DAPR-EXP-MTCS)$0.00
CDFS-OSEHPHP 2910-48G Factory Integrated al Switch (1 each), 7/13/2015SW4th Quarter/ Renews in July 15 for 3 months of coverage(P/N: J9147AZ)$0.00
CDFS-OSEHPX9320 10GbE Performance Block (1 each), 7/13/2015

X9320 48 TB Capacity Block Starter Kit (1 each), 7/13/2015 X9320 48 TB Capacity Block Expansion Kit (1 each), 7/13/2015 SW 4th Quarter/ Renews in July 15 for 3 months of coverage (P/N: QP331A)

(P/N: QP335A)

(P/N: QP336A)$0.00
CDFS/SWAFS RefreshIntelIntel Compiler Suite Pro Linux 2 Seat Floating License (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: ICS999LFGM02)$0.00
CDFS/SWAFS RefreshVersantV/OD Enduser Deployment Serverlicense 8 Cores RedHat Linux 64 bit (1 each), 10/1/2014
V/OD Enduser Testserverlicense 8 Cores RedHat Linux 64 bit (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
CDFS/SWAFS RefreshVersantV/OD Development Licenses, Single User, RedHat Linux 64 bit (15 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
CDFS/SWAFS RefreshVersantV/OD Development License, Single User, RedHat Linux 64 bit (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
CDFS/SWAFS RefreshVersantV/OD Development License, Single User, RedHat Linux 64 bit (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
CDFS/SWAFS RefreshVersantV/OD Development License, Single User, RedHat Linux 64 bit (9 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverageN/A$0.00
DC3HPHP Cluster Management Utility Media (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: 433257-B21)$0.00
DC3HPHP CMU Compute Node Flex (70 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: 436284-B21)$0.00
DC3HPHP MSA2000 Snapshot 64 Software (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: T5512A)$0.00
DC3IntelIntel Compiler Suite Pro Linux 2 Seat Floating License (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: ICS999LFGM02)$0.00
DC3IBMIBM PLATFORM COMPUTING LSF STANDARD ED (RVU) (280 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: E0DX4LL)$0.00
DC3HPHP 2610-24 Factory Integrated Switch (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: J9085AZ)$0.00
DC3HPHP 2910-48G al Switch (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: J9147A)$0.00
DC3HPHP 2610-48 Factory Integrated Switch (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: J9088AZ)$0.00
Dev 8HPHP iLO Advanced Nm 1-Svr Lic (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: 512485-B21)$0.00
Dev 8HPHP iLO Adv BL incl 1 yr TS U 1-Svr Lic (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: 512488-B21)$0.00
Dev 8HPHP Cluster Management Utility Media (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: 433257-B21)$0.00
Dev 8HPHP CMU Compute Node Flex (50 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: 436284-B21)$0.00
Dev 8IntelIntel Compiler Suite Pro Linux 5 Seat Floating License (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: ICS999LFGM05)$0.00
Dev 8IBMIBM PLATFORM COMPUTING LSF STANDARD ED (RVU) (600 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: E0DX4LL)$0.00
Dev 8HPHP 2910-48G Factory Integrated al Switch (1 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: J9147AZ)$0.00
Dev 8HPHP 2910-24G Factory Integrated al Switch (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: J9145AZ)$0.00
Dev 8HPP2000 G3 MSA FC Dual Control LFF Arrays (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: AP845A)$0.00
Dev 8HPX9300 10GbE/IB Netwrk Storage Gateway (2 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: AW540B)$0.00
Dev 8IBMIBM PLATFORM COMPUTING LSF STANDARD ED (RVU) (120 each), 5/31/2015SW3rd Quarter/ Renews in Jun 15 for 4 months of coverage(P/N: E0DX4LL)$0.00
Dev 8HPX9300 10GbE/IB Netwrk Storage Gateway (4 each), 5/23/2015SW3rd Quarter/ Renews in May 15 for 5 months of coverage(P/N: AW540B)$0.00
Dev 8HPP2000 G3 MSA FC Dual Control LFF Arrays (8 each), 5/23/2015SW3rd Quarter/ Renews in May 15 for 5 months of coverage(P/N: AP845A)$0.00
Dev 8HPHP 2910-48G Factory Integrated al Switch (2 each), 5/23/2015SW3rd Quarter/ Renews in May 15 for 5 months of coverage(P/N: J9147AZ)$0.00
Dev 8HPHP Insight CMU Flex E-LTU (4 each), 5/23/2015SW3rd Quarter/ Renews in May 15 for 5 months of coverage(P/N: BD476AAE)$0.00
Dev 8HPHP Insight CMU Flex E-LTU (16 each), 5/23/2015SW3rd Quarter/ Renews in May 15 for 5 months of coverage(P/N: BD476AAE)$0.00
Dev 8HPHP Insight CMU Flex E-LTU (16 each), 5/23/2015SW3rd Quarter/ Renews in May 15 for 5 months of coverage(P/N: BD476AAE)$0.00
Dev 8HPHP iLO Adv BL incl 1 yr TS U 1-Svr Lic (3 each), 2/20/2015SW2nd Quarter/ Renews in Feb 15 for 8 months of coverage(P/N: 512488-B21)$0.00
Enterprise AVMSCybersoftVfind Turbo AntiVirus SW (4 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage(P/N: VSTK-TMSI)$0.00
Enterprise AVMSOracleQuest TOAD (2 each), 11/30/2014SW1st Quarter/ Renews in Dec 14 for 10 months of coverage(P/N: 9923-13208)$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (24 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage24 Chargeable Processors on S/N: 0D26P$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 0D27P$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (24 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage24 Chargeable Processors on S/N: 0D28P$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 0D29P$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 18F8P$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 18F9P$0.00
Enterprise IBM WDA (Refresh)IBMAIX OS (Qty reflects charegable processors) (8 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage8 Chargeable Processors on S/N: 18FAP$0.00
Enterprise IBM WDA (Refresh)IBMPowerVM Enterprise Edition (Qty reflects charegable processors) (24 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage24 Chargeable Processors on S/N: 0D26P$0.00
Enterprise IBM WDA (Refresh)IBMPowerVM Enterprise Edition (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 0D27P$0.00
Enterprise IBM WDA (Refresh)IBMPowerVM Enterprise Edition (Qty reflects charegable processors) (24 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage24 Chargeable Processors on S/N: 0D28P$0.00
Enterprise IBM WDA (Refresh)IBMPowerVM Enterprise Edition (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 0D29P$0.00
Enterprise IBM WDA (Refresh)IBMPowerVM Enterprise Edition (Qty reflects charegable processors) (32 each), 10/1/2014SW1st Quarter/ Renews in Oct 14 for 12 months of coverage32 Chargeable Processors on S/N: 18F8P$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .