11-R-0012-A002.doc
DOC document 289 KB Posted
- Attached to
- FA4600-11-R-0012 NIDS III A011
- Solicitation number
- FA4600-11-R-0012
About this file
NIDS III FA4600-11-R-0012 Amendment 0002
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
Corrections are made throughout Section L; references to “Priced Option Task Order” are corrected to state “Pre-Priced Option Task Order.” See red highlights and bar ( | ) to the right.
Table L2.0, Volume IV, remove Max page limit verbiage for Small Business Participation Plan.
QUESTION 1. Section L4.4.2. In Section L4.4.2 it reads the skill set matrix will not count towards the page count. Can offeror conclude the related detailed descriptions of the skill set criteria and definitions also will not count towards page count?
ANSWER 1: The information is directly related to the skill set matric, therefore, the detailed description will not count towards the page count.
QUESTION 2. Sections L4.6.1 and L2.0. Section L4.6.1 states that a PWS is required for the Priced Option Task Order; however, L2.0 does not identify whether the PWS is within the stipulated page count. In order to provide a complete proposal for consideration, may the Priced Option PWS be provided as an attachment to Vol II and therefore outside of the page count identified?
ANSWER 1. Per RFP Table L2.0 “Volume II, Pre-Priced Option Task Order, 20 pages.
(See note at the end of Table L2.0). ** The individual page limitation does not count towards the respective volume page limitation.”
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0006
The CLIN extended description has changed from Priced Option Task Order - Validate Facilities and DGZ Data. This CLIN includes target cost and target fee. Target fee will be 6.5% of the proposed target cost. Note: Priced Task Order shall only be proposed for Base Period, and may or may not be used after contract award. This Priced Option Task is considered an enhancement under the Incentive Plan. to Pre-Priced Option Task Order - Validate Facilities and DGZ Data. This CLIN includes target cost and target fee. Target fee will be 6.5% of the proposed target cost. Note: Pre-Priced Task Order shall only be proposed for Base Period, and may or may not be used after contract award. This Pre-Priced Option Task is considered an enhancement under the Incentive Plan..
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
INSTRUCTIONS TO OFFERS
L1.0.
PROPOSAL PREPARATION INSTRUCTIONS
L1.1. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of the volumes as identified in Paragraph 2.0, Table 2.0.
L1.2. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
L1.3. SPECIFIC INSTRUCTIONS
L1.3.1. BUDGET PROFILE
The following provides the projected budget profile for NIDS III. Dollars shown below are in millions. FY12 designates a three month NIDS III transition effort starting 16 Nov 2012 through 15 Feb 2013. Full performance will start on 16 Feb 2013 through 30 Sep 2013 for the base year, and the option years will be 01 October thru 30 September with a six month extension 1 Oct 2017 through 31 Mar 2018.
| FY13 |
| FY14 |
| FY15 |
| FY16 |
| FY17 |
| FY18 |
| Total |
| O&M |
| $2.94 |
| $2.75 |
| $2.77 |
| $2.77 |
| $2.77 |
| $0.7 |
| $14.7 |
| *Potential 3400/3600 Efforts |
| $2.5 |
| $5.0 |
| $5.5 |
| $4.0 |
| $3.5 |
| 0 |
| $20.5 |
| Total |
| $5.26 |
| $7.75 |
| $8.27 |
| $6.77 |
| $6.27 |
| $0.7 |
| **$35.2 |
*Potential 3400/3600 Efforts will be negotiated for Future Development Task Orders (CLIN X003), Future Enhancement Task Orders (CLIN X004), and Future FFP Taskings (CLIN X008)
* NOTE: The potential efforts are only projected amounts based upon current information and may change from year to year. The total of $20.5M in potential efforts over the life of this contract will be considered within scope and will be included in the estimated total ceiling of $36M. Each task order will be reviewed to determine which funding is appropriate.
**$35.2M is the estimated total based on the figures above, but has been rounded to $36M for estimated total ceiling.
L1.3.2. POINT OF CONTACT (POC)
The Contract Administrator is the only point of contact for this acquisition. Address any questions or concerns you may have to the Contracting Officer and Contract Administrator. For this acquisition, the Contracting Officer is Ms. Debra Simons, and the Contract Administrator is Ms. Theresa Bryant.
55 CONS/LGC
ATTN: Ms. Debra Simons (55CONS/LGCZ)
101 Washington Square, Bldg 40
OFFUTT AFB, NE 68113
Phone: (402) 294-4494 or DSN: 271-4494
Fax: 402-294-0430
E-Mail: Debra.Simons@offutt.af.mil
55 CONS/LGC
ATTN: Ms. Theresa Bryant (55CONS/LGCZ)
101 Washington Square, Bldg 40
OFFUTT AFB, NE 68113
Phone: (402) 294-7282 or DSN: 271-7282
Fax: 402-294-0430
E-Mail: Theresa.Bryant@offutt.af.mil All inquiries must be made in writing and submitted electronically to both the above Contracting Officer and Contract Administrator e-mail addresses. Offeror's will receive a notice of receipt. If they do not, it is their responsibility to follow-up by contacting the Contracting Officer and Contract Specialist, (phone numbers above). Written inquires (via e-mail) will be answered in writing and provided to all Offerors via posting(s) to the Federal Business Opportunities website (www.FedBizOpps.com).
L1.4. PROPOSAL ACCEPTANCE PERIOD AND DUE DATE
The proposal acceptance period/due date is specified in Table 2.0. Unless otherwise noted, proposals are due no later than 4:00 PM Central Time on the date specified. The offeror shall make a clear statement that its offer is valid for at least 180 days beyond the due date. Late proposals may be rejected from consideration. If any proposal is received late, the Contracting Officer will promptly notify the offeror that its proposal was received late and whether the proposal will still be considered. A receipt e-mail will be sent to the offeror. If the offeror does not receive a confirmation, it is their responsibility to contact the POC.
L1.5. BROCHURES, DOCUMENTATION, BINDING, AND ARTWORK
Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.
L1.6. DISCREPANCIES
If an offeror believes the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale, prior to proposal.
L1.7. DISPOSITION OF PROPOSALS
In accordance with FAR Subpart 4.8, Government Contract Files, the Government will retain the “original” copy of all proposals and supplemental documents provided. Unless the offeror requests otherwise, the Government will destroy all extra copies of proposals and additional documents submitted.
L1.8. PROPOSAL CLARITY
The proposal shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet the requirements. The offeror shall also provide a cross reference matrix referencing back to the requirements documents. The offeror shall assume that the Government has no prior knowledge of the contractor’s capabilities and experience, and will base its evaluation on the information presented in its proposal. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
L1.9. RESTRICTIONS ON DISCLOSURE AND USE OF PROPOSAL
A proposal may include data, such as technical designs or concepts, financial data, or management plans that the offeror does not want disclosed to the public for any reason, or used by the Government for any purpose other than proposal evaluation and contract award. If the offeror wishes to restrict the proposal, the offeror shall mark it in accordance with FAR 52.215-1.
L1.10. SECURITY REQUIREMENTS
The DoD Contract Security Classification Specification, DD Form 254, incorporated as an attachment, identifies the security clearance requirements of this contract.
L1.11. GOVERNMENT FURNISHED PROPERTY (GFP)
Government Furnished Property is provided as an attachment in Section J of the solicitation.
L2.0. ORGANIZATION OF PROPOSALS
The offeror shall prepare the proposal as set forth in the Proposal Organization Table 2.0 below. The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table 2.0. The attachment identified shall be separately bound in three-ring, loose-leaf binders, as necessary. The proposal organization shall be as follows:
Table 2.0: NIDS III Proposal Organization & Page Count
| Volume & Title |
| Max Page Limit |
| Number of copies required |
| Due Date (NLT*) |
TBD 2012
Para #
| I. Executive Summary |
| 3 pages |
| Original plus four (4) copies, and one (1) CD-ROM. |
| 21 May 2012 |
| 3.0 |
| II. Technical Approach/ Technical Risk |
| 40 pages |
| Original plus four (4) copies, and one (1) CD-ROM. |
| 21 May 2012 |
| 4.0 |
| **Pre-Priced Option Task Order |
| 20 pages |
4.6
| Skill Set Matrix |
| No page limit |
III. Past Performance
| Original plus three (3) copies, and one (1) CD-ROM. |
| 30 Apr 2012 |
| 5.0 |
| **Table of Contents |
| 2 pages |
| **Summary |
| 3 pages |
| Contractor’s Past Performance Information Document |
| 15 pages |
[5 references @ 3 pages each
| Past Performance Questionnaire Tracking Record |
| No page limit |
| Subcontractor/Teaming Partner/Joint Venture Past Performance Information Document |
| 2 references each @ 3 pages each |
| Past Performance Assessment Form |
| No page limit |
| Consent Letters |
| No page limit |
| Client Authorization Letters |
| No page limit |
| **Organization Structure Change History |
| 2 pages |
| **Quality Awards |
| 2 pages |
| IV. Cost/Price Price Model, Sec J, Atch 14 shall be returned as a part of the Price Proposal) |
| No Page Limit |
| Original plus four (4) copies, and one (1) CD-ROM |
| 21 May 2012 |
| 6.0 |
Pre-Priced Option Task Order Pricing
4.6
Small Business Participation Plan
4.7
V. Contract Documentation/
Fill-in Clauses
| No Page Limit |
| Original plus four (4) copies, and one (1) CD-ROM |
| 21 May 2012 |
| 7.0 |
| Summary |
| 1 page |
*All documents due by 4:00 PM Central Standard Time on the date specified. ** The individual page limitation does not count toward the respective volume page limitation.
L2.1. DEBRIEFINGS
If a competitive range is established, the Contracting Officer will promptly notify offerors of any decision to exclude them, whereupon they may request and receive a debriefing in accordance with FAR 15.505, Preaward Debriefing of Offerors. The Contracting Officer will also notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.503, Notifications to Unsuccessful Offerors. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.506, Postaward Debriefing of Offerors, as applicable.
L2.2. PROPOSAL FORMAT AND CONTENT
L2.2.1. PAGE LIMITATIONS
Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and (for paper copies) will not be returned to the offeror. Excess pages shall be destroyed along with all unsuccessful proposals (ref. 1.7). For electronic submission, no hidden fields, macros, comments, etc. will be read. All information must be written clearly and be easily accessible. Page limitations may also be placed on Evaluation Notices (ENs), if required. The page limitations for ENs, if any, will be identified in the correspondence forwarding the ENs to the offerors. When both sides of a sheet of paper display printed material, it shall be counted as two pages. Each page shall be counted except: cover pages, tables of contents, cross-reference matrix, tabs, and glossaries.
L2.2.2. PAGE SIZE
Page size shall be 8.5 x 11 inches, not including foldouts. Pages shall be single-spaced. Except for the reproduced sections of the solicitation document, the text size shall be no less than Times New Roman 10 point. Use at least 1-inch margins on all sides of each page. Pages shall be numbered sequentially by volume. If there are discrepancies in page counts between paper, CD-ROM volumes and e-mail submittals, the paper version shall take precedence.
2.2.3. TABLES, CHARTS, GRAPHS, AND FIGURES
Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11 by 17 inches in size when printed. Foldout pages shall fold entirely within the volume, and count as two pages. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics, and not for pages of text. For tables, charts, graphs and figures, the text shall be no smaller than 8 point.
L2.2.4. CLASSIFIED INFORMATION
Proposals shall not contain classified information.
L2.2.5. COST OR PRICING INFORMATION
All cost or pricing information shall be addressed only in the Cost/Price Volume IV.
L2.2.6. ELECTRONIC MEDIA
Offeror shall submit all volumes in electronic format, using IBM-compatible, virus-free CD-ROM. On each CD-ROM indicate the offeror’s name, solicitation number, volume, and title. WinZip shall be the compression/ decompression program used if files are required to be compressed. The electronic copies of the proposal shall be submitted in a format readable and usable by Microsoft 2007 Office suite (MS Word, MS Excel, and PowerPoint). Hidden fields, comments, macros, etc shall be omitted, and read passwords on files shall not be used. The documents submitted should print to match the original, paper copy submitted. All information shall be clearly displayed. In the event there is a discrepancy between the content found in a paper copy and an electronic copy, the paper copy shall take precedence. The receipt of the paper copy shall constitute the timely receipt of the formal proposal.
L2.2.7. CROSS-REFERENCE MATRIX
To the greatest extent possible, each volume shall be written on a stand‑alone basis so that its contents may be evaluated with minimal cross-referencing to other volumes of the proposal. Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity. Offeror shall provide a cross-reference matrix indicating the corresponding proposal paragraph in that section and/or volume which addresses the referenced item. Information required for proposal evaluation that is not found in its designated volume will be assumed omitted from the proposal. The cross-reference matrix will not count against the page limitations for their respective volumes.
L2.2.8. TAB INDEXING
Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections. Indexes and tabs do not count against the page limitations for their respective volumes.
L2.2.9. GLOSSARY OF TERMS
Each volume shall contain a glossary of all abbreviations, acronyms and/or terms used, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.
L2.2.10. BINDING AND LABELING
Each volume of the proposal shall be separately bound in a three-ring, loose-leaf binder, which shall permit the volume to lie flat when open. Staples shall not be used. A cover sheet shall be included in each volume, clearly marked as to volume number, title, copy number, solicitation identification and the offeror's name. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.
L2.2.11. DISTRIBUTION
The “original” proposal shall be identified and delivered to 55CONS. All copies of proposals (See Table 2.0) shall be mailed or delivered to:
55th Contracting Squadron/LGCZ
ATTN: National Target Base/National Desired Ground Zero List Integrated Development System III
(NIDS III)
(Debra Simons or Theresa Bryant)
101 Washington Square, Bldg. 40
Offutt AFB, NE 68113-2107
Offerors are cautioned that Offutt AFB, NE has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HANDCARRYING PROPOSALS.
If mailing, the outside of the envelope or box(es) should be marked as follows:
NOTE: TO BE OPENED BY ADDRESSEE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
FOR OFFICIAL USE ONLY
L3.0. VOLUME 1 - Executive Summary
Volume I is due per Section L, para 2.0. In the executive summary volume, the offeror shall provide the following information:
L3.1. Narrative Summary
The narrative summary is a summary of the entire proposal and should be clear and concise, to include addressing the significant risks, and highlighting any key or unique features, excluding cost/price. This should be a "big picture" explanation and provide the offeror’s overall approach and supporting rationale for the management/operation of the NIDS III requirements. Within the Narrative Summary, the offeror shall state that its proposal is valid for the timeframe designated in paragraph L1.4 Proposal Acceptance Period and Due Date. The contractor shall identify those personnel authorized to negotiate on behalf of the company along with the telephone number, fax number, mailing address, and e-mail address. The contractor shall also provide the person to contact in the event the offeror is awarded a contract (provide at a minimum, contact’s name, title, phone number, and e-mail address). The Executive Summary shall be no more than 3 pages, and will not count towards the maximum page count for Volume II, Technical Approach and Technical Risk. The salient features should tie in with Section M evaluation factors/subfactors. Any summary material presented here shall not be considered as meeting the requirements for any portions of other volumes of the proposal.
L3.2. Table of Contents
Include a master table of contents of the entire proposal. The format of the Executive Summary is at the discretion of the offeror, but shall include a Master Table of Contents of the entire proposal that identifies where material may be found for each evaluation factor and/or subfactor as defined in the RFP.
L4.0. VOLUME II – TECHNICAL APPROACH AND TECHNICAL RISK VOLUME
L4.1. General
Volume II is due per Section L, para 2.0. The Offeror’s Technical Approach proposal shall be specific and complete. Legibility, clarity, and coherence are very important. The Offeror’s technical approach should provide as specifically as possible the actual methodologies that will be used and how a successful partnership with the Government will be established in accomplishing/satisfying the NIDS III requirements. All the requirements specified in the solicitation are mandatory. Through proposal submission, the Offeror represents that it will fulfill the requirements specified in the solicitation; therefore, it is not necessary or desirable for an Offeror to state this in the proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation. The Technical Approach Volume will be used to evaluate the Technical Approach and Technical Risk of the Offeror’s proposal. Evaluation will be against the Technical Approach subfactors as specified in Section M, Evaluation Factors for Award, of this RFP.
L4.2. Format and Specific Content
The purpose of the Technical Approach and Technical Risk volume is to provide the Government the ability to evaluate the management and technical capability of the offeror to perform the NIDS III support requirements. The Technical Approach/Technical Risk volume shall consist of the following sections:
VOLUME II: Technical Approach and Technical Risk
Subfactor 1: Architecture and Systems Engineering
Subfactor 2: Staffing
Subfactor 3: Transition Plan
Subfactor 4: Pre-Priced Option Task Order
Subfactor 5: Small Business Participation Plan
L4.3. Subfactor 1 – Architecture and Systems Engineering: The Offeror shall define and describe the architecture and systems engineering approach to NIDS as identified in the PWS. The offeror shall include internal processes, procedures, and related technical expertise for systems engineering, software engineering, information assurance, configuration management, testing, and technical analysis/evaluation.
L4.3.1. The Offeror shall describe the overall approach and process to effectively manage and maintain NIDS software, to include understanding of the Nuclear Targeting Applications mission architecture, planning processes, and system/software maintenance/enhancement/development tasks. Describe the interfaces NIDS has with other systems, both inside and outside the USSTRATCOM complex. Describe the plan to ensure the sustainment of NIDS software meets the PWS requirements.
L4.3.2. The Offeror shall define and describe the plan, methodology, and processes that will ensure NIDS activities and products provide a solution consistent with the ISPAN MPAS architecture, to include that PWS requirements, and all other contract requirements, are satisfied throughout the system lifecycle. The Offeror shall describe the plan to provide appropriate insight into contractor processes and management systems to include an overview of the software development lifecycle processes that will be followed to maintain/develop software under this PWS.
L4.3.3. The Offeror shall provide a mature process for managing and implementing requirements, to include tracking, test/verification analysis, derived requirement identification/tracking and certification of software change requests and/or new requirements. Provide independent certification (e.g. Capability Maturity Model Integrated Software (CMMI SW) Level 3 or equivalent and ISO 9001) that the division/business unit's software development and maintenance processes demonstrate a solid procedural control. Demonstrate procedures are defined, planned, tracked, and repeatable, and processes are quantitatively managed and/or incorporate continuous improvement. Demonstrate that the processes are clearly used in the day-to-day operations of the business unit and are minimally impacted by using in-house or outsourced resources. Describe alignment/ability of processes to ensure the quality of the software, reviews, metrics and documentation/artifacts required by the PWS and CDRLS.
L4.3.4. The Offeror shall demonstrate how you will collaborate with USSTRATCOM; teaming partners/subcontractors; other application contractors within the ISPAN environment; contractors working programs within USSTRATCOM; and others collaborating with USSTRATCOM.
L4.4. Subfactor 2 – Staffing: The Offeror shall define and describe the plan, methodology, and processes that will ensure the staffing activities/personnel activities/products satisfy the NIDS III PWS requirements, and all other contract requirements throughout the system/software lifecycle. The Offeror shall describe the plan to provide appropriate insight/visibility into contractor processes and management systems. This should include: leadership, reach back capability, contract management, quality control/assurance, and the procedures that will be used for planning, controlling (to include cost and schedule), reporting and directing the accomplishment of the PWS requirements, (to include 24/7 support).
L4.4.1. The Offeror shall describe the leadership and oversight philosophies, tools, techniques, reach back capability to include uninterrupted support for one deep positions, contract management and quality assurance that will be used for planning, controlling (to include cost and schedule), reporting and directing the accomplishments of the NIDS III requirements.
L4.4.2. The Offeror shall describe the process to adequately staff this contract (to include qualifications, personnel skills, organizational chart, experience, and security clearances). Describe years of relevant experience and provide qualification summaries of key personnel. It is mandatory to use Tables 4.1 and 4.2 below. For Table 4.1, each offeror is to list each of their skill sets in the top row of the table. Each skill set will then identify their area of expertise as stated in the left column. Table 4.2 will then identify which skill sets from Table 4.1 will be used to accomplish each corresponding paragraph within the PWS and the number of Full Time Equivalents (FTE) proposed to accomplish each paragraph. The offeror will describe their skill set criteria and definitions. The matrix will not count towards the overall proposal page limit.
L4.4.3. The Offeror shall describe the process to provide training and security clearances that are appropriate for assigned responsibilities/areas.
L4.4.4. The Offeror shall describe the methodology that will be utilized for recruiting, hiring, retaining, and replacing employees (especially those with security clearances) throughout the life of the contract. Submit a total compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract in accordance with FAR 52.222-46. Explain how uninterrupted support will be provided during a labor strike, surges, natural disasters, disruptive world events, terrorist attacks, and other emergencies. Demonstrate how the Continuation of Essential Contractor Services Clause (DFAR 252.237-7023), and Policy and Procedures for Determining Workforce Mix (DoDI 1100.22), will be met.
L4.4.5. The Offeror shall describe the approach to provide system training to users.
Table 4.1
| Skill Set Matrix |
| Skill Set 1 |
| Skill Set 2 |
| Skill Set 3 |
| Etc. |
Domain Concepts
Nuclear target list management
ISPAN
MPAS
Nuclear target option and weapon coding
Nuclear aimpoint/DGZ construction
Nuclear war planning systems
OPLAN 8010
Technical Concepts
Coding standards
DB tuning
Design Patterns
Distributed Computing Architectures
Object-Oriented Design
Service-Oriented Architecture
Web Services
Domain-Specific Models and Algorithms
Nuclear fatality models
Nuclear damage models
General Models and Algorithms
Clustering algorithms
Genetic algorithms
Domain Data Standards
ISPAN Enterprise Database
Languages
Ada
C
C++
Fortran
Java
SQL
WSDL
XML
XSD
Libraries and Application Programming Interfaces
ExtGWT
GTK+
GWT
JavaEE
Java Connector Architecture
JDBC
MOTIF
GOTS Libraries
PDCALC
Client Infrastructure Products
ESRI ArcGIS Engine
Microsoft Internet Explorer
Mozilla Firefox
Red Hat Linux Desktop
Windows XP
Server Infrastructure Products
CGA
Oracle DB
Red Hat Linux Server
VMware
WebLogic Server
Development Tools
GCC compiler
Java Development Kit
Make
Geodesy
CJMTK
DTED
Web Mapping Service
Security
SCI Personnel Clearance
Top Secret Personnel Clearance
NC2 Personnel Clearance
Other Requirements
DB administration
Information Assurance (IA) Expertise
Unix shell scripting
| Skill Set Matrix |
| Skill Set 1 |
| Skill Set 2 |
| Skill Set 3 |
| Etc. |
Domain-Specific Models and Algorithms
DGZ Construction algorithms
Target Isle Construction algorithms
Domain Data Standards
Information Transaction File (ITF) format
ITF XML Schema
Languages
GNU Ada 95
GNU Fortran 77
Java 6
Java 7
Libraries and Application Programming Interfaces
Ada Distributed Annex
GtkAda-for-GNAT
ImageMagick
PolyOrb
Client Operating Environments
Open Text Exceed
Server Operating Environments
Oracle Internet Directory
Solaris
Development Tools
AdaCore GNAT Professional Ada 95compiler
Eclipse Java Development Tools
Fortify 360
GNAT Programming Studio
JUnit
Maven
PowerBuilder
Subversion
X Designer
GNU Make
Table 4.1.1
Required Skillsets needed by the end of the transition period
L4.5. Subfactor 3 – Transition Plan:
L4.5.1 At a minimum, the offeror shall provide:
L4.5.1.1 A realistic, detailed plan for transitioning to the new contract.
L4.5.1.2 Uninterrupted support and no degradation of service for NIDS Applications requirements.
L4.5.1.3 Approach to adequately staff this contract with qualified/skilled personnel possessing appropriate security clearances from award to full performance.
L4.5.1.4 Phase-in process that is reasonable and realistic for assumption of full responsibility.
L4.5.1.5 A logical and well thought out approach for obtaining/retaining personnel with the appropriate mix of qualifications/skill sets, IT certifications, and security clearances prior to full-scale performance.
L4.5.1.6 Understanding of the activities and resources required to successfully transition personnel and workload requirements for continuity of mission support.
L4.5.1.7 Transition risks and measures to mitigate them.
L4.6. Subfactor 4 – Pre-Priced Option Task Order: The Offeror will present a Performance Work Statement, a Technical Volume, and a Cost Volume for accomplishing the following NIDS III task order.
L4.6.1 Validate Facilities and DGZ Data
Objective: The Targeting NTB and DGZ Planners desire the ability to Validate Facilities and DGZ Data. This task will provide a web interface to enable validation of facilities and DGZ data in selectable configuration. This task will allow operators to: specify multiple conditions to be checked via a user-friendly interface that supplies data fields and operators; save and modify sets of conditions for re-use; identify data to be reported for all facilities that do not meet the specified conditions (e.g., facility key), as well as data specific to each failed condition; and provide results in a report format that can be sorted, viewed, and saved.
This task will provide the planner the ability to identify facilities in which required weaponeering coding values are blank, identify facilities that contain invalid attack options, identify facilities in which the vulnerability data does not match the physical vulnerability characterization, Identify facilities that do not have DGZs, and identify facilities that do not have Target Isles.
At a minimum, the Offeror shall provide:
1) A Performance Work Statement
2) A Technical Volume that details the approach/methodology to provide the NIDS software to provide the capability described in the requirement statement, to include high level design artifacts, assumptions, limitations, and constraints.
3) A Cost Volume that details contractor staffing skill sets and levels of effort, associated rates, and delta SLOC estimates required to accomplish the basic task described above
L4.7 Subfactor 5 - Small Business Participation Plan
L4.7.1 Small Business Participation Plan. The Offeror shall submit a Small Business Participation Plan in Cost/Price Volume IV, which will be used for the purposes of evaluating the extent to which offerors identify and commit to small business in contract performance on the NIDS III program. The Participation Plan is required from all offerors, including small businesses, large businesses, non-profit entities and companies with commercial subcontracting plans, master subcontracting plans, individual (program) subcontracting plans and/or comprehensive subcontracting plans. The plan will be incorporated into the resulting contract.
The Government has established a 15% target small business participation goal, based upon total contract dollars, for this requirement. The offeror shall demonstrate how they intend to promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), Historically Underutilized Business Zone (HUBZone) small business, veteran-owned small business (VOSB) and/or service-disabled veteran-owned small business (SDVOSB), including the use of small businesses in mission critical aspects of the program. A small business offeror should show total small business participation, to include their percentage of performance and the percentage they intend to subcontract to small businesses.
L4.7.1.1 All offerors shall provide (1) through (3) below:
(1) A table which lists the following:
a) All proposed first, second, and third tier subcontractors, individually by name with their addresses,
b) Subcontractor business type (large, small (SB), small disadvantaged to include HBCU/MI (SDB), women-owned (WOSB), HUB Zone, veteran-owned (VOSB), service-disabled veteran-owned (SDVOSB)), as determined by the SBA size standard for the specific work being subcontracted. List all applicable categories for each subcontractor.
c) The principal service/supply being provided by the subcontractor.
d) The complexity of the service/product provided. A brief narrative on complexity of subcontract services/products must describe:
Product: Complex performance specifications or stringent tolerances;
Services: Advanced professional skills or application of innovative technologies: and
e) Expected dollar value of the subcontract.
(2) A table which summarizes the total 1st, 2nd and 3rd tier subcontract dollars proposed for each category of small business: SB, SDB, WOSB, HUBZone, VOSB and SDVOSB. Subcontractors that qualify for inclusion in more than one category shall be included in each category for which they qualify. For example, the value of subcontracts at all three tiers to be awarded to a WOSB in a HUBZone shall be included in WOSB, HUBZone and SB totals. (Include this table in the cost/price volume vs. the technical volume)
(3) A copy of binding agreements and enforceable commitments executed with the firms identified in the table required by (1)b above. A sample of the table described in (1)b is provided below:
| Name of 1st, 2nd and 3rd Tier Subcontractors |
| Subcontractor Address |
| Type of Business (Large, SB, HUBZone, SDB, WOSB, VOSB, SDVOSB) |
| Principal Supply/Service Provided |
| Complexity of Product/Service Provided |
| Dollar Amount of Subcontract |
| XYZ Corp. |
| 123 Main St. |
Anytown, NY 01345
| Large |
| Castings |
| Manufactured to .01 tolerance |
| $1,500,000 |
| Acme, Ltd. |
| 456 First Ave. |
Somewhere, NY 54321
| SB, SDB, VOSB |
| Logistics software |
| Utilizing ISO 9000 and S100D Standards with XML |
| $ 75,000 |
Note 1: The CCR & SBA Dynamic Small Business Search ( http://www.bpn.gov/ccr/ and http://web.sba.gov/pro-net/search/dsp_dsbs.cfm) databases will be viewed to verify the small business category or categories of the proposed small businesses in the table. The offerors shall list all applicable business types for which each subcontractor qualifies. The definition of a small business concern is as set forth in 13 CFR 121.105. The definition of “subcontract” is as set forth in FAR 19.701.
Note 2: The Participation Plan is in addition to, not in place of, the subcontracting plan. If a subcontracting plan is required, (See FAR 19.702.) the plan shall be submitted by the offeror in accordance with FAR 52.219-9 – Alternate II stating cumulative subcontracting goals and for each option in dollars, percentages of total subcontracted amount and percentage of total contract value. (See AFFARS 5319.704(a)(1).)
Note 3: Offerors are reminded that in accordance with DFARS 215.304(c)(i) (C), the small businesses and HBCU/MIs considered in evaluation shall be listed in any subcontracting plan submitted pursuant to FAR 52.219-9 to facilitate compliance with DFARS 252.219-7003(g). In addition, all goals accepted and incorporated into the resulting contract will be subject to FAR Clause 52.219-16, “Liquidated Damages-Subcontracting Plan”, unless the offeror is a participant in the Comprehensive Subcontracting Program.
Note 4: Offerors are reminded that the Small Business Subcontracting Plan (required from large businesses only) shall correlate with the proposal information on small business participation as well as all other sections of the proposal.
L4.7.2. Small Business Innovation: The offeror’s SB Participation Plan shall include their planned initiatives to assist, promote, and utilize all categories of small business in the NIDS III program. Demonstrate examples of how the offeror is maximizing SB opportunities and using SB in mission critical aspects (e.g. technology innovation) throughout the proposed program.
L5.0. VOLUME III – PAST PERFORMANCE INFORMATION
Volume III is due per Section L, para 2.0. Limited to no more than five separate contracts with three (3) pages per contract listed. Only references for same or similar type contract desired. Submit original plus five (5) copies.
L5.1. INSTRUCTIONS
The Past Performance volume of the offeror’s proposal is due per Section L, para 2.0. CPARS evaluations will take precedence over individual assessments.
Offeror shall provide past performance information for evaluation. Failure to provide the information may result in the offeror being removed from consideration for award. (Note: An offeror with no past performance experience should submit the Volume with an explanation that they have no recent or relevant experience). The Government will evaluate past performance of the offeror’s recent and relevant contracts to determine an overall “Confidence” rating. For the purpose of this evaluation, the term “offeror” includes the prime offeror and/or team members and major subcontractors.
L5.2. CONTENT OF PAST PERFORMANCE VOLUME
The offeror’s Past Performance Volume shall contain the following:
Table of Contents
Summary Page
Contractor’s Past/Present Performance Information Documents
Past/Present Performance Questionnaire Tracking Record
Past/Present Performance Assessment Reports
Consent Letters
Client Authorization Letters
Organization Structure Change History
Quality Awards
L5.3. SUMMARY PAGE
The Summary shall describe the role (for the proposed NIDS III requirement) of the offeror and each subcontractor, teaming partner/joint venture partner that the offeror is required to provide Past Performance Information Documents pursuant to the paragraph below.
L5.4. CONTRACTOR’S PAST/PRESENT PERFORMANCE INFORMATION DOCUMENTS
L5.4.1. RECENCY AND RELEVANCY OF PAST PERFORMANCE
L5.4.1.1. Offeror’s should provide past performance information on contracts considered relevant in demonstrating their ability to perform the NIDS III requirements. Include rationale supporting your assertion of relevance, however, the Government is not bound by the offeror’s opinion of relevancy. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Where problems existed, clearly demonstrate management actions employed in overcoming these problems and the effects of those actions, in terms of improvements achieved or problems rectified. The evaluation of past performance will take into account past performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. If the offeror submits a delivery/task order as past performance, it shall be counted as a contract.
L5.4.1.2. Contracts submitted for review should also be recent. In determining recency, the Government will only consider work performance under an effort existing after 13 February 2008. Additionally, performance of less than one year from the date of the NIDS III solicitation will not be considered due to limited performance history of these efforts.
L5.4.1.3. Offeror shall submit Past Performance Information Documents in accordance with the format contained at Sec J, Atch 8 for the Prime Offeror and any subcontractors, teaming partners, and joint ventures that will perform major or critical aspects of the requirement when the information is relevant to the subject acquisition. The maximum number of Past Performance Information Documents an offeror may submit is three (3). The maximum number of Past Performance Information Documents an offeror may submit for any subcontractors, teaming partners, and joint ventures is two (2) each. Each Past Performance Information Document is limited to three (3) pages. Submit original plus five (5) copies. (Note: The Government reserves the right to evaluate more references that it locates through past performance evaluation research.) The required documentation is as follows:
L5.4.2. PAST PERFORMANCE QUESTIONNAIRE TRACKING RECORD
Offeror shall send out, and confirm receipt and submission of the Past and Present Performance Questionnaire at Sec J, Atch 10, to each of the offeror’s major subcontractors’, teaming Contractors’ and/or joint venture partners’ (e.g., each entity’s) Points of Contact (POC) identified in the Past Performance Questionnaire Tracking Record at Sec J, Atch 11. The responsibility to send out and track the receipt and submission of the Past Performance Questionnaires rests solely with the offeror. For each questionnaire, complete and sign a letter containing substantially the same information as in the Sample Questionnaire Cover Letter at Sec J, Atch 9. Cover letters shall be printed on company letterhead. The offeror shall exert its best efforts to ensure that at least two POCs, per relevant contract, submit a completed Past Performance Questionnaire directly to the Government not later than the due date for the past performance proposal volume. To avoid potential conflicts offeror’s are exempt from sending Past Performance Questionnaires to other potential competitors of this acquisition. In this situation, it is the offeror’s responsibility to find an alternative method of providing the Government the same or similar information. Each of the offeror’s POCs shall e-mail the completed Past Performance Questionnaire to Ms. Theresa Bryant at theresa.bryant@offutt.af.mil , or Ms. Debra Simons at Debra.Simons@offutt.af.mil. If you do not receive a confirmation e-mail or you do not have the capability to send the documents electronically, please fax it directly to Ms. Bryant or Ms. Simons at fax number (402) 294-0430. Please have your POCs call Ms. Bryant at (402) 294-7282 or Ms. Simons at (402) 294-4494 before faxing their response. Once the Past Performance Questionnaires are completed by your POCs, the information contained therein shall be considered sensitive and shall not be released. Questionnaires shall be sent back directly to the Government, with best efforts made to ensure completion and submissions from at least two of the following (in descending order of availability):
Procuring Contracting Officer/Contract Negotiator or equivalent
Administrative Contracting Officer/Contract Administrator or equivalent
Program/Project Manager or equivalent
L5.4.3. PAST PERFORMANCE ASSESSMENT REPORTS
This information is required on the contracts submitted IAW the Past Performance Information Documents paragraph above. If an evaluation method other than a Contractor Performance Assessment Report (CPAR) has been used in conducting performance assessments (e.g. an Award Fee notification letter, a subcontractor’s prime Contractor performance evaluation, etc.) that form/documentation shall be submitted. The offeror should immediately notify the Contracting Officer listed above if a CPAR or other evaluation form has been accomplished on the offeror’s existing work but the contracting office for that requirement will not release the information. Provide the contract number, point-of-contact, and phone number from which the past performance information shall be obtained. This information shall be provided to the Contracting Officer as soon as any difficulty occurs and before the proposal due date.
L5.4.3.1. Quality and Satisfaction Rating for Contracts Completed in the Past Three (3) Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc.
L5.4.4. CONSENT LETTERS
Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because the offeror is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past performance information to the offeror during exchanges. (Sec J, Atch 12 – Subcontractor/Teaming Partner Consent Letter for the Release of Past and Present Performance Information to the Prime Contractor) In an effort to assist the Government in assessing your past performance relevancy and confidence, request the sample consent letter be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent letter shall be submitted as part of the Past Performance Information Volume, but will not be considered in the page count of this Volume. Should the offeror not submit a completed consent letter for major subcontractors or teaming partners, the Government will only discuss past performance information directly with the prospective sub-contractor or teaming partner that is being reviewed. If there is a problem with the proposed subcontractor’s or teaming partner’s past performance, the offeror can be notified of a problem, but no details may be discussed without the subcontractor’s/teaming partner’s permission. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the offeror's performance. (Sec J, Atch 13-Client Authorization Letter)
L5.4.5. ORGANIZATION STRUCTURE CHANGE HISTORY
Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources. This information is required on the offeror, teaming partners and/or joint venture partners, and major subcontractors, as necessary.
L5.4.6. QUALITY AWARDS
Offeror may describe any quality awards and certifications that indicate the offeror, major subcontractors, teaming contractors and/or joint venture partners possesses the necessary skills to perform the services required. Such awards or certifications include, for example; incentive or quality awards pertinent to the performance of work associated with relevant past performance. Describe when the award or certification was received. If the award or certification is over three years old, provide evidence that the qualifications still apply.
L6.0. VOLUME IV – COST/PRICE PROPOSAL
L6.1 Volume IV is due per Section L, para 2.0. All cost/price information shall be addressed within the cost/price volume only (Note: Section B shall be included in Contract Documentation Volume V). All offerors shall complete and submit the Sec J, Atch14 (excel spreadsheet), NIDS III Price Model, for the proposed price for CLINs X001, X006, X007, X008, and X009. The Offeror shall populate CLINs X002, X003, and X004 with the Government estimates. Each Offeror’s proposal shall represent its best efforts to respond to the NIDS III requirements. The burden of proof for credibility of proposed cost/price rests with the Offeror and cost rates and applications must be verifiable by the cognizant Defense Contract Audit Agency (DCAA). Any inconsistency between proposed performance and cost/price shall be explained in the proposal. For example, if unique and innovative approaches are the basis for the estimate, the nature of these approaches and their impact on cost/price must be explained. A significant inconsistency, if unexplained, may raise a question of the Offeror’s understanding of the nature and scope of the work required and its ability to perform within the proposed cost constraints, which may cause the proposal to be rejected. In connection to the recruiting, hiring, retraining, and employment replacement methodology referenced in Sec L4.4.4, submit a total compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract in accordance with FAR 52.222-46.
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .