NE100010.docx

DOCX document 19 KB Posted

Attached to
CNS Restroom Federal contract opportunity
Solicitation number
FA4600-10-B-0009
Issued by
Department of the Air Force Air Combat Command

About this file

Wage determination

View the file

Other files for this federal contract opportunity

Other files attached to CNS Restroom, newest first.
File Type Posted
Bidder Abstract.pdf PDF
CNS Questions2.pdf PDF
Hour ext.pdf PDF
CNS Questions.pdf PDF
Deadline Amendment.doc DOC document
Sht10.dwf DWF file
10B0009 CNS Sol.doc DOC document
Sht09.dwf DWF file
Bidder Checklist Attch.doc DOC document
Sht05.dwf DWF file
Sht07.dwf DWF file
Sht01.dwf DWF file
NCIC Data attachment.docx DOCX document
Sht04.dwf DWF file
Sht08.dwf DWF file
Sht03.dwf DWF file
Sht02.dwf DWF file
CNS Restroom Specs.pdf PDF
Sht06.dwf DWF file
Pre-Solicitation Notice CNS Restrooms.doc DOC document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NE100010 06/25/2010 NE10

Superseded General Decision Number: NE20080010

State: Nebraska

Construction Type: Building

County: Sarpy County in Nebraska.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 03/12/2010 1 06/25/2010

ASBE0039-002 06/01/2009

Rates Fringes

Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 29.41 11.39

FOOTNOTE:

Work performed from a boatswain chair, staging, or scaffolding suspended from a permanent structure, more than thirty (30) feet above the floor or the ground: $1.00 per hour additional.

BRNE0001-001 06/01/2009

Rates Fringes

BRICKLAYER.......................$ 26.55 10.75

FOOTNOTE: Work on smoke stacks, chimneys and silos 50 ft.

and higher: $2.00 per hour additional, to be paid from the footing.

CARP0444-008 06/01/2009

Rates Fringes

CARPENTER (does not include concrete form work or overhead doors)..................$ 23.41 9.25

CARP1463-001 06/01/2009

Rates Fringes

MILLWRIGHT.......................$ 26.32 9.85

ELEC0022-011 06/01/2009

Rates Fringes

ELECTRICIAN (includes low voltage wiring for fire alarm systems; does not include HVAC control wiring).............$ 30.75 1%+12.24

* ELEC0022-012 03/01/2010

Rates Fringes

Electricians: (Sound and voice transmission, transference systems;

television and video systems;

security stystems;

communication systems that transmit or receive information and/or control systems; energy management systems; and fire alarm systems (does not include raceway systems) (excluding cable tray for the purpose of the above listed systems;

Also, chases and/or nipples (not to exceed 10ft.) may be installed on open wiring systems); Note: Fire alarm systems when installed in raceways in any new or remodel project when other building trades are present shall be the work of the inside electrician) (does not include HVAC control wiring))....$ 20.15 5.44

ELEV0028-001 01/01/2009

Rates Fringes

ELEVATOR MECHANIC................$ 35.23 18.285+a+b

FOOTNOTE:

a. Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0571-004 10/01/2009

Rates Fringes

Power equipment operators:

Group 1.....................$ 18.23 8.10 Group 2.....................$ 21.63 8.10 Group 3.....................$ 24.45 8.10 Group 4.....................$ 26.75 8.10 Group 4A....................$ 27.69 8.10

Group 1: Machine oiler, Rubber tired tractor

Group 2: Trenchers, Forklifts, Hydro-Hammer, Spread oiler, Trailer or skid mounted concrete pumps

Group 3: One & two drum hoist, Tuggers, all backhoes, Dozers

Group 4: Cranes, Concrete pump with swing boom, Mechanic

Group 4A: CCO Crane

IRON0021-010 06/01/2009

Rates Fringes

IRONWORKER (includes metal building erection)...............$ 26.50 9.97

* PLUM0016-009 06/02/2010

Rates Fringes

PLUMBER (does not include HVAC piping).....................$ 33.47 11.15

PLUM0464-007 05/27/2009

Rates Fringes

Pipefitter/steamfitter (includes HVAC piping)...........$ 30.48 13.65

ROOF0085-001 04/10/2007

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 20.28 4.72

SFNE0669-001 01/01/2010

Rates Fringes

SPRINKLER FITTER (FIRE)..........$ 30.41 16.35

SHEE0003-005 07/01/2008

Rates Fringes

Sheet metal worker (includes HVAC duct work, and setting the unit; does not include HVAC piping, HVAC wiring, or metal building erection).........$ 28.76 11.27

SUNE2000-003 09/13/2000

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (includes concrete form work and rebar).............$ 13.34 3.98

LABORER: Mason Tender...........$ 11.50 4.10

LABORER..........................$ 10.50

PAINTER (does not include wallpaper hanging)...............$ 12.50

Power Equipment Operator Loader......................$ 12.43 .04

Sheet metal worker/electrician (HVAC wiring only).....................$ 20.21 6.09

Truck Driver, Tandem Dump........$ 8.00 .03

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION