91 OSS ECP QandA.pdf

PDF 58 KB Posted

Attached to
Entry Control System Install and Preventative Maintenance Federal contract opportunity
Solicitation number
FA452822QTR01
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Entry Control System Install and Preventative Maintenance, newest first.
File Type Posted
20220215_091243.jpg JPG image
INTEL Door.jpg JPG image
20220215_091253.jpg JPG image
146521.jpeg JPEG file
CAT door.jpg JPG image
Intel door 2.jpg JPG image
20220215_091301.jpg JPG image
OSS Entry Control PWS - FA452822QTR01.pdf PDF
Combo - FA452822QTR01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

FA452822QTR01

01 March 2022

Q: Is the existing access control system to be replaced in good working order to reuse the wiring and electric locks?

A: Yes, all existing equipment is fully functioning and able to be reused.

Q: Having a central point of control for both buildings will require a network connection or hardwire communication connection between these buildings. Is there an existing connection that can be reused or will a new line need to be run? Will trenching be required?

A: Yes, the existing network connections between buildings can be reused. No trenching will be required.

Q: Given the remote location of this site is it possible for the government to provide photos of site conditions and doors where the new readers will be installed?

A: Will send photos of outside of area vaults but no interior photos due to security reasons.

Not all doors are pictured, these are just a random few to provide examples of the site conditions and door types. Pictures are in solicitation documents.

Q: We didn’t see a requirement for federal access control that the system be listed on the

GSA approved products list or that a CSEIP is required. Is the intent to follow these standards?

A: There is no intent to follow those requirements.

Q: What is the current state of the existing wiring system? How is it installed (conduit vs open ceiling vs raceway)?

A: All existing equipment is fully functioning and able to be reused. Conduit.

Q: What is the current state of the existing wiring system? How is it installed (conduit vs open ceiling vs raceway)?

A: The SOW says annual PMI, but the CLIN asks for 12 months in the “Quantity” section of the table. Which is correct?

Q: We are hoping to find out if there is (was) an incumbent contractor performing these services, or if this is a brand new contract. If there is an incumbent, could you please provide the current / previous contract number?

A: There is no incumbent and this is a new contract.