Q&A.pdf

PDF 9 KB Posted

Attached to
CYP PA and Intercom System Installation
Solicitation number
FA4528-18-Q-RW04
Issued by

About this file

Questions and Answers from the Site Visit

View the file

Other files

File Type Posted
Combo_-_Amendment_3_-_Update_CO.pdf PDF
Combo_-_Amendment_2_Extend.pdf PDF
Combo_-_Amendment_2_-_Extend.pdf PDF
PWS_PA-Intercom_Revised_23_Aug_18.pdf PDF
Floorplan_YC_and_Annex.pdf PDF
Attachment_1_-_PWS_(Solicitation).pdf PDF
Combo_-_CYP_PA_System.pdf PDF
Attachment_3_-_WD_15.pdf PDF
Attachment_2_Quote_Sheet.xls XLS spreadsheet
Floorplan_CDC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4528-18-Q-RW04 – CYP PA/Intercom System Questions and Answers

1. Q: Is there a possibility that the Period of Performance will be extended?

A: See revised PWS Para. 9.0. Period of Performance has been extended to 90 days

2. Q: Is surface raceway acceptable if needed?

A: Surface raceway is acceptable as long as it is out of reach of children.

3. Q: Is/was there an intercom system previously existing in the Annex (BLDG 168)?

A: No.

File details come from the government source that posted it.