09-0096 A-2.pdf
PDF 146 KB Posted
- Attached to
- Construct Addition to Bldg 973 Federal contract opportunity
- Solicitation number
- FA4528-11-R-0006
About this file
Revised Drawing Sheet 9
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 09-0096 16722 1-23 | — | |
| 09-0096 E-1.pdf | ||
| 09-0096 E-2.pdf | ||
| 09-0096 TOC 1 | — | |
| Amendment 3.doc | DOC document | |
| 09-0096 E-3.pdf | ||
| 09-0096 09688 CARPETING GLUE-DOWN.pdf | ||
| 09-0096 06400 1.pdf | ||
| 09-0096 09650 RESILIENT FLOORING.pdf | ||
| 09-0096 07401 PREFORMED METAL WALL PANELS(for IDIQ metal siding).pdf | ||
| 09-0096 TOC.pdf | ||
| Amendment 2 | — | |
| Amendment 2.doc | DOC document | |
| 09-0096 C-1.pdf | ||
| 09-0096 A-3.pdf | ||
| 09-0096 A-1.pdf | ||
| 09-0096 A-3.pdf | ||
| Solicitaion FA4528-11-R-0006.doc | DOC document | |
| 09-0096 S2.pdf | ||
| Amendment 1.doc | DOC document | |
| 09-0096 Drawings.pdf | ||
| 09-0096 | — | |
| Bid Schedule Bldg 973.pdf | ||
| Solicitaion FA4528-11-R-0006.doc | DOC document | |
| Drawings.pdf | ||
| Solicitaion FA4528-11-R-0006.doc | DOC document | |
| Drawings.pdf | ||
| Attachment 4 Technical Acceptance Criteria.doc | DOC document | |
| ATTACHMENT 5 Responsibility Questionnaire.doc | DOC document | |
| Wage Determination.pdf |
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLAST RESISTANT
WINDOW
EXISTING
EXISTING
BUILT UP ROOF
METAL SIDING TO
MATCH EXISTING
LIGHT-SEE ELEC.
W-2 W-2
BLAST RESISTANT
WINDOW
BUILT UP ROOF
METAL SIDING TO
MATCH EXISTING
EXISTING
EXISTING
LIGHT-SEE ELEC.
W-2 W-2
BLAST RESISTANT
WINDOW
BUILT UP ROOF
METAL SIDING TO
MATCH EXISTING
EXISTING BUILDING
LIGHT-SEE ELEC. LIGHT-SEE ELEC.
W-2 W-2 W-2
EXISTING
EXISTING
8" CMU
FINISHED GRADE
2'x2' ACOUSTICAL CEILING
STEEL BEAM AND JOISTS--SEE
STRUCTURAL.
BUILT UP ROOF
INSULATION
METAL ROOF DECK
" METAL STUDS w/
FC GYP BD BOTH SIDES
EXISTING STORM DRAIN
MANHOLE. SEE C-1.
STEEL BEAM
CORR 101 OFFICE 106 OPEN OFFICE 102
W-2 W-2
NEW ADDITION EXISTING BUILDING
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
PLUMBING VENT
1" PER 20"
FINISHED SLOPE
EXISTING CMU WALL
NEW BUILT UP ROOFING
ASSEMBLY TO MATCH EXISTING
& NEW WOOD BLOCKING.
16K2 JOIST. SEE STRUCTURAL.
SLOPED BEAM BEYOND.
SEE STRUCTURAL.
NEW FLASHING AND COUNTER
FLASHING EXTEND UP
EXISTING WALL.
EXISTING BUILT UP
ROOFING ASSEMBLY.
File details come from the government source that posted it. Updated .