S P E C I F I C A T I O N

FOR PROJECT

QJVF 09-0096 CONSTRUCT ADDITION TO BLDG 973

AT

MINOT AIR FORCE BASE, NORTH DAKOTA

PREPARED BY:

5 CES, ENGINEERING FLIGHT

MINOT AIR FORCE BASE, NORTH DAKOTA

FEBRUARY 2010

i

QJVF 09-0096

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS PAGES

01005 Administrative Provisions 01005-1 thru 11 01010 Environmental Protection 01431-1 thru 15 01300 Submittals 01300-1 thru 2 01400 Quality Control 01400-1 thru 2 01500 Construction Facilities and Temporary Controls 01500-1 thru 4 01700 Contract Closeout 01700-1 01710 Final Cleaning 01710-1 thru 2

DIVISION 2 - SITEWORK

02072 Minor Demolition for Remodeling 02072-1 thru 3 Attachment Pages 1-4 02300 Earthwork for Structures 02300-1 thru 9 02485 Seeding 02485-1 thru 6

DIVISION 3 - CONCRETE

03300 Cast-in-Place-Concrete 03300-1 thru 15

DIVISION 4 - MASONRY

04100 Mortar 04100-1 thru 3 04810 Structural Unit Masonry Assemblies 04300-1 thru 12

DIVISION 5 - METAL

05120 Structural Steel 05120-1 thru 5 05210 Steel Joists 05210-1 thru 5 05310 Steel Deck 05310-1 thru 6 05500 Metal Fabrications 05500-1 thru 5 05510 Sheet Metal Fabrications 05510-1 thru 5

DIVISION 6 - WOOD AND PLASTICS

06100 Rough Carpentry 06100-1 thru 3

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07200 Insulation 07200-1 thru 3 07467 Steel Siding 07467-1 thru 4 07510 Built up Roofing 07510-1 thru 48 Roof Warranty Sign Page 1 07900 Sealants 07900-1 thru 3

DIVISION 8 - DOORS AND WINDOWS

08100 Metal Doors and Frames 08100-1 thru 4 08210 Wood Doors 08210-1 thru 2 08520 Aluminum Windows 08520-1 thru 3 08560 Blast Resistant Windows 08560-1 thru 5 08700 Hardware 08700-1 thru 5 ii

TABLE OF CONTENTS (CON’T.)

DIVISION 9 - FINISHES

09260 Gypsum Wallboard Systems 09260-1 thru 5 09320 Ceramic Mosaic Tile 09320-1 thru 2 09510 Acoustical Ceilings 09510-1 thru 4 09650 Resilient Flooring 09650-1 thru 4 09688 Carpeting Glue-Down 09688-1 thru 4 09900 Painting 09900-1 thru 6

DIVISION 10 - SPECIALTIES

10420 Signage 10420-1 thru 3 10520 Fire Extinguishers 10520-1 thru 3 10800 Toilet and Bath Accessories 10800-1 thru 1

DIVISIONS 11,12,13 AND 14 - NOT USED

DIVISION 15 - MECHANICAL

15010 General 15010-1 thru 5 15250 Thermal Insulation for Mechanical Systems 15250-1 thru 10 15300 Drainage, Soil, and Waste 15300-1 thru 6 15320 Water Distribution System 15320-1 thru 10 15400 Plumbing 15400-1 thru 12 15504 Wet Pipe Fire Suppression 15504-1 thru 15 15600 Hydronic Heating and Cooling 15600-1 thru 11 15800 Air Supply and Distribution System 15800-1 thru 9 15904 DDC for HVAC 15904-1 thru 9

DIVISION 16 – ELECTRICAL

16010 General Provisions 16010-1 thru 5 16020 Remodeling Work 16020-1 thru 2 16040 Identification 16040-1 thru 2 16110 Raceway 16110-1 thru 5 16120 Low Voltage Conductors 16120-1 thru 3 16130 Junction Boxes 16130-1 thru 4 16140 Wiring Devices and Device Plates 16140-1 thru 3 16160 Motor Starters 16160-1 thru 3 16170 Disconnects 16170-1 thru 2 16450 Grounding 16450-1 thru 2 16500 Lighting 16500-1 thru 3 16722 Fire Alarm 16722-1 thru 6 16740 Voice and Data Cabling System 16741-1 thru 8 16900 Connections to Equipment 16900-1 thru 2

01005-1

DIVISION l - GENERAL REQUIREMENTS

SECTION 01005

ADMINISTRATIVE PROVISIONS

1. GENERAL:

1.1 DESCRIPTION OF WORK:

1.1.1 Work of this Contract, Construct Addition to Building 973, QJVF 09-0096, comprises general, mechanical, and electrical construction at Minot Air Force Base, North Dakota.

1.2 SUMMARY OF WORK:

1.2.1 Construct new building addition onto building 973. Building consists of load bearing masonry exterior walls, columns and beams; steel joist framing; metal decking; rigid insulation; and built-up roofing.

1.2.2 Minor demolition, building addition excavation, site grading, paving, and utility work.

1.2.3 Exterior load-bearing wall construction.

1.2.4 New interior steel stud wall framing and gypsum wall board system work.

1.2.5 New interior wall furring.

1.2.6 New steel and wood doors with frames and hardware.

1.2.7 Interior finishes.

1.2.8 Painted interior wall and ceiling finishes.

1.2.9 Mechanical, fire sprinkler, and heating as described on Drawings.

1.2.10 Electrical lighting, receptacles, switches, and related wiring, as described on Drawings.

1.3 WORK SEQUENCE: Work shall not commence until all materials are on hand or confirmed delivery dates have been established.

01005-2

1.4 COORDINATION:

1.4.1 Coordinate work of the various Sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later.

1.4.2 Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

1.4.3 Coordinate space requirements and installation of mechanical and electrical work which are indicated diagramatically on Drawings. Follow routing shown for pipes and conduits as closely as practicable; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

1.4.4 In finished areas, except as otherwise shown, conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements.

1.4.5 Execute cutting and patching to integrate elements of Work, uncover ill-timed, defective, and non-conforming work, provide openings for penetrations of existing surfaces and provide samples for testing. Seal penetrations through floors, walls, and ceilings.

1.4.6 Building will be occupied during construction.

1.5 CONTRACTOR'S WORK HOURS: Working hours for the Contractor will normally be between the hours of 7:30 a.m. and 4:00 p.m., excluding Saturdays, Sundays, and federal holidays. If the Contractor desires to work during periods other than above, additional Government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.

1.6 FIELD ENGINEERING:

1.6.1 Provide field engineering services; establish grades, lines, and levels, by use of recognized engineering survey practices.

01005-3

1.7 REFERENCE STANDARDS:

1.7.1 For products specified by association or trade standards, comply with requirements of the standard.

1.7.2 The date of the standard is that in effect as of the

Invitation for Bid Date.

1.8 SAFETY:

1.8.1 Contractor to comply with all IBC/OSHA/NEC/AF/DOD Regulations.

1.8.2 Contractor to comply with MAFBI 32-2001, Responsibilities of Base Personnel to Eliminate or Control Fire Hazards.

1.9 PERMITS AND WORK CLEARANCES:

1.9.1 Welding:

1.9.1.1 When any welding, cutting, brazing, or use of any

open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department, 320 Flightline Drive, prior to beginning such work.

1.9.1.2 During such work, a fully charged and operable fire

extinguisher, appropriate for the task, shall be provided by the Contractor.

1.9.2 Clearance Work Request:

1.9.2.1 Contractor shall coordinate with appropriate utility

locating agencies, including base communications cable maintenance (Item 1 through 15) of AF Form 103, Base Civil Engineering Work Clearance Request. AF Form 103 will be given to the Contractor during the pre-construction meeting.

Contractor shall complete and follow all instructions on AF Form 103 before start of work on base. A copy of AF Form 103 instructions will be available to the Contractor during the pre-construction meeting.

1.9.2.2 Before any excavation, alteration, or other

construction work is begun, the Contractor shall obtain and fully process an AF Form 103, Base Civil Engineering Work Clearance Request. The form requires extensive coordination with several base agencies, including furnishing all locations, detailed information, and sketches regarding any proposed excavation(s). Processing a separate request for each planned excavation is required; each phase of processing the form and its attachments shall be completed prior to commencing work involving that phase. The AF Form 103 shall be prominently displayed on the job site at all times for review by the Contracting Officer and/or his or her designated representative. A copy of

01005-4 the signed form shall be submitted to the Contracting Officer and a copy to the project inspector. Completion of the AF Form 103 includes certifying compliance with institutional controls indicated by CEV, coordination in getting the form coordinated, and returning the form to the Environmental office when the project has been completed.

1.9.2.3 Contractor shall schedule a meeting time to meet with each utility agency at the work site to locate affected utilities.

1.9.2.4 Contractor shall maintain all marked utilities in the field once they are initially marked by each utility agency. If markings are damaged, Contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates. Expenses for time and materials to perform repeat locates shall be borne by the Contractor, unless otherwise approved by the Approving Officer. Cost to do the repeat locates will be deducted from the final invoice. Cost will be calculated using the average shop rate of each agency. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the Contractor by placing stakes or transcribing the marks on a drawing. When construction resumes, Contractor shall re-mark the site and may request verification of utility locations at no additional cost to him. Off-base utility locates agencies might request additional cost for repeat locates.

1.9.2.5 Clearance request is not valid until signed by the

Approving Officer, block 17 of the AF Form 103. Approving Officer will not sign until all locates are marked and all utility locating agencies signatures are on the form. Excavation work shall commence within 30 days after the Approving Officer's signature; otherwise, clearance request is invalid and a new request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.

1.9.2.6 Protection of Existing Utilities: The Contractor

shall safeguard and protect from damage all utilities encountered or uncovered during digging, excavation, and backfilling.

1.10 SCHEDULING: The Contractor shall schedule work to minimize the amount of disturbance and disruption to the Using Agency. The Contractor shall coordinate the work schedule with the Contracting Officer.

1.11 STORAGE: On base or on site storage will not be provided or allowed.

1.12 HAZARDOUS WASTE: Any hazardous waste generated from government materials shall be disposed by the government. Contact 5 CES/CEANP via the Contracting Officer to coordinate labeling, transport, and disposal of

01005-5 government hazardous waste. Any hazardous waste generated by the Contractors use of hazardous materials shall remain the property of the Contractor. The use, generation and disposal of all hazardous waste/material will be the responsibility of the Contractor and shall be handled in accordance with all federal and state hazardous waste and toxic substances control regulations.

1.13 HAZARDOUS MATERIAL (HAZMAT) COMPLIANCE: This section applies to Contractors who will purchase hazardous materials for use on Minot AFB.

Hazardous materials include, but aren’t limited to solvent, paint, adhesives, sealants, cleaner/detergents, cement, grout, fuel, refrigerant, lubricant, aerosols, and compressed gases. The Installation Hazardous Materials Management Process (IHMMP) team determines what products are considered a hazardous material on Minot AFB. Compliance with this section is required under the Emergency Planning and Community Right-to-Know Act (EPCRA), Air Force Instruction (AFI) 32-7086, Hazardous Materials Management, and other federal, state, and local environmental regulations. Environmentally friendly, water- and bio-based products, non-flammable and non-hazardous materials are preferred, but care must be afforded when selecting a product since performance is a major factor. The Contractor shall strike a balance between environmental impact and performance of the product. Environmentally friendly materials should not result in poor deliverables. If a product contains a regulated or banned chemical, the Contractor shall select one with the lowest concentration possible. No products may be used that contain Ozone Depleting Substances, lead, mercury, and chlorinated solvents.

1.13.1 IAW FAR Claus 52.223-3, each contractor must provide the Contracting Officer with a list of proposed HAZMAT to be used during the performance of the contract and a Material Safety Data Sheet (MSDS) for each item. The MSDS shall match the manufacturer and be within 2 years of the materials manufacture date.

1.13.2 The list and MSDS shall be submitted to the Contracting Officer no less than 15 days before the HAZMAT will be brought on base, and immediately forwarded to 5 CES/CEAN (CEAN) for review.

1.13.3 The product list shall include the product/item name, National Stock Number, manufacturer, initial quantity, container size(s), storage location, and maximum volume of each HAZMAT on hand during the reporting period.

1.13.4 After CEAN review, the Contractor will be notified which items may or may not be brought on Minot AFB, and the items that must be tracked and reported to 5 CES/CEAN on a regular basis throughout the performance of the contract.

1.13.5 The contract specifications will state whether reporting is on a monthly or quarterly basis. Reporting shall be based on a calendar month/quarter, and is due to the Contracting Officer within 7 days after the

01005-6 end of the reporting period. Upon receipt, the Contracting Officer shall immediately forward the report to CEAN.

1.13.6 The report shall contain the name of the material used, manufacturer, quantity used during the reporting period, and storage location if it has changed during the reporting period. The report shall be on company letterhead paper and signed by the project manager or person with primary responsibility for procuring, storing, and managing the hazardous materials.

1.13.7 The prime contractor shall be responsible for reporting all HAZMAT used by sub-contractors. Reporting may be delegated to a sub-contractor. The delegation shall be submitted in writing to the Contract Officer at least 15 days before the start of the project.

1.13.8 All hazardous materials shall be stored properly in

centrally-located areas according to storage requirements of National Fire Code and approval of the Minot AFB Fire Department. Incompatible HAZMAT must be adequately segregated.

1.13.8.1 The Contractor may use a storage locker for HAZMAT, but it must be protected from weather extremes and precipitation, and inspected weekly for leaks and spills. The storage locker shall be at the work site before HAZMAT is brought onto Minot AFB.

1.13.8.2 HAZMAT containers must be securely closed when not

in use.

1.13.8.3 HAZMAT containers must have the original label on it with the appropriate warning labels. If the original container is divided into smaller portions, the alternate container must be clearly marked with the contents, compatible with the material, and securely closed when not in use.

1.13.8.4 The storage area must be posted with the appropriate hazardous warning signs.

1.13.8.5 Flammable items shall be stored in an approved

flammable storage locker.

1.13.8.6 All liquid HAZMAT shall be stored on secondary

containment.

1.13.8.7 All compressed gas cylinders shall be secured to

prevent them from falling over.

1.13.9 At the end of the project, no excess HAZMAT shall remain on Minot AFB unless specifically required by contract. If not already stated in the contract and specification, permission to leave excess HAZMAT on Minot AFB

01005-7 must be granted in writing by the Contract Officer and a copy forwarded to CEAN. The written permission shall show the name of the material, manufacturer, quantity left behind, and the name and phone number of the government agent acquiring custody of the material.

1.13.10 The Contractor may use excess HAZMAT on other projects and shall be solely responsible for disposing of waste generated from use of this

HAZMAT.

1.14 DISPOSAL OF WATER GENERATED DURING CONSTRUCTION DEWATERING:

1.14.1 Criteria for Disposal: Prior to dewatering, the Contractor shall submit a disposal plan detailing the method of disposal for approval.

The disposal plan for Land Application shall include a sketch showing the construction site and the proposed location of the disposal of generated water. The disposal plan for Land Application shall also include a description of the equipment that will be used for the removal of water and a description of filtration methods to be implemented as needed. In addition, the date the discharge will begin, the duration of discharge, and the rate of discharge shall be provided. If the method of disposal is Surface Discharge requiring a state-issued permit, the documentation required for the application and issued permit will suffice as the disposal plan. For sanitary sewer discharge, the disposal plan shall include the rate and location of discharge into the sewer.

1.14.2 Surface Discharge: Surface discharge shall be in accordance with North Dakota’s National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Dewatering and/or Hydrostatic Testing #NDG- 070000. “Surface discharge” implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface drainage may terminate in drainage ditches, creeks, or “waters of the state” and require a discharge permit. The state of North Dakota requires a minimum of 30 days to process the permit application, prior to dewatering.

The Contractor shall submit a copy of the completed application form, a copy of the North Dakota NPDES General Permit for Construction Dewatering #NDG- 070000 issued by the State of North Dakota for this contract, and any subsequent reports and/or information required by the permit or state.

1.15 RECYCLING/REUSE OF EXCESS MATERIALS AND CONSTRUCTION AND DEMOLITION

(C&D) DEBRIS: The Contractor shall reuse/recycle excess materials and Construction and Demolition (C&D) debris to the maximum extent possible.

C&D debris are those excess/residue materials resulting from construction or demolition activity that would normally be discarded to a landfill.

C&D debris includes, but is not limited to soil, rock, vegetation, concrete, asphalt, and building materials such as windows, wood, metal, and roofing materials. The Contractor shall recycle C&D debris and excess materials, if determined to be economical. All C&D debris resulting from demolition shall

01005-8 become the property of the Contractor unless specified otherwise or as determined by the Contracting Officer.

1.15.1 Materials not to be returned to the Government and all Contractor-generated rubbish, if not recycled, shall be disposed of by the Contractor off-base at his own expense, and in compliance with applicable environmental codes and regulations of governing authorities.

1.15.2 Reporting Tonnage of C&D Debris: Contractor shall track and report the tonnage of C&D debris in two categories:

1.15.2.1 Tons of C&D that is or will be recycled or reused.

1.15.2.2 Tons of C&D that is disposed in a landfill.

1.15.3 The C&D recycled/disposed tonnage report shall consist of a written memo with the tonnage of each category (recycled and disposed tonnage) submitted to 5 CES/CEAN through the Contracting Officer. Submit C&D recycled and disposed tonnage report on a quarterly basis. The data shall be collected on a calendar month basis, and reported on a calendar quarter basis. Reports shall be submitted by the 5th of each month following the end of the calendar quarter to the Contracting Officer and immediately submitted to 5 CES/CEAN.

The Reports shall be on company letterhead paper and show each category of waste, the weight, whether it was recycled, re-used, donated, or disposed, the month the waste was recycled, re-used or recycled, and the name, a contact, and phone number of the recycling and disposal facilities. If the waste was re-used, the contractor shall indicate whether the waste was re-used on Minot AFB or not. The report shall be signed by the project manager or other legal company representative.

1.16 USE OF RECYCLED-CONTENT AND BIO-BASED PRODUCTS

1.16.1 The Contractor shall use recycled-content and bio-based construction products as much as practicable. When selecting a product, consider performance as a major factor but strike a balance between environmental impact and performance of the product. Environmentally friendly materials should not result in poor deliverables. If a product with a regulated or banned chemical must be used, select one with the lowest concentration possible, purchase only the amount needed for the job, and use all that is purchased. Excess product shall be removed at the end of the project.

1.16.2 The Contractor shall collect monthly data on its usage of recycled-content and bio-based products during the performance of the contract. The report shall contain the type of product (e.g. conduit, asphalt), the amount of recycled content or bio-based constituents (e.g. 30% post-consumer content, 15% ethanol) in each product, and the weight of each

01005-9 type of product used during the calendar month. Reports shall be submitted by calendar quarter on company letterhead paper and signed by the project manager or other legal representative. The prime contractor shall report for sub-contractors.

1.16.3 If no recycled-content or bio-based products are used for any type of construction product during the quarter, the Contractor shall submit a letter stating their rational for not using these products. Rationale may include poor performance, excess cost, or non-availability of the product.

However, every effort shall be made to re-use demolition materials, and recycled-content and bio-based products.

1.17 ASBESTOS-CONTAINING MATERIAL: Building #973 has not been surveyed for the presence of regulated asbestos-containing materials. The North Dakota Department of Health, Division of Air Quality, Asbestos Control Program requires that “All affected parts of a facility being renovated or demolished must be inspected by a state-certified inspector for the presence of asbestos-containing materials prior to beginning a renovation or demolition project;

all regulated asbestos-containing material that will be disturbed as part of a renovation or demolition must be properly removed by state-certified individuals before beginning the project; all asbestos-containing waste material must be properly disposed of in an approved landfill….” If asbestos materials are encountered or even suspected, immediately stop work and notify the Contracting Officer.

1.17.1 The North Dakota Department of Health, Division of Air Quality, Asbestos Control Program requires that “All affected parts of a facility being renovated or demolished must be inspected by a state-certified inspector for the presence of asbestos-containing materials prior to beginning a renovation or demolition project; all regulated asbestos-containing material that will be disturbed as part of a renovation or demolition must be properly removed by state-certified individuals before beginning the project; all asbestos-containing waste material must be properly disposed of in an approved landfill….”

1.17.2 All affected parts of a facility being renovated or

demolished must be inspected for the presence of asbestos-containing materials (ACM) prior to beginning the renovation or demolition project. The inspector must be asbestos-inspector certified through the North Dakota Department of Health (NDDH).

1.17.3 All regulated asbestos-containing material (RACM) that would be disturbed as part of a renovation or demolition must be properly removed before beginning the project. The individuals removing the material must be certified and the contractors licensed through this Department. RACM includes all friable ACM and nonfriable ACM that will be made friable during the project.

01005-10

1.17.4 All asbestos-containing waste material must be properly disposed of in an approved landfill. A waste shipment record (WSR) must be started prior to transportation of asbestos-containing waste material. The WSR must be delivered to the landfill operator at the time the material is deposited for disposal. A copy of the completed WSR must then be submitted to this Department within ten (10) days of depositing the waste material.

1.17.5 A "Notification of Demolition and Renovation" form must be submitted to the State and to the Government prior to initiation of activities in accordance with the following:

1. In a facility being demolished, a "Notification of Demolition and Renovation" form SFN 17987 (07/09) must be submitted to this Department ten (10) days prior to beginning any demolition activity. This is required whether or not the facility being demolished has ACM in it.

2. In a facility being renovated, where more than 160 square feet of asbestos-containing surfacing material or more than 260 linear feet of asbestos-containing thermal system insulation on pipes will be disturbed, a "Notification of Intent" must be submitted to the Department ten (10) days prior to beginning the removal.

1.18 LEAD BASED PAINT: Some painted surfaces associated with Building #973 were included in a limited lead-based paint survey completed in March 2006. Lead-based paint was found to be present in Building #973. See attached survey. If the painted surfaces associated with this project have not been surveyed for lead-based paint (LBP) it must then be assumed that the painted materials contain LBP exceeding the 1.0 milligrams per square centimeter (m/cm2) or 0.5% by weight. The work under this contract is routine maintenance, not LBP abatement. Occupational Safety and Health Administration (OSHA) standards 29 CFR §1910.1001, General Industry; 29 CFR §1910.1025 General Industry Lead Standard; and 29 CFR §1926.58, Construction Industry will apply in these buildings. We recommend that the facility or parts of the facility where the renovation or demolition will occur be inspected to determine the absence or presence of lead-based paint.

1.18.1 Projects involving building improvements, maintenance or repair are not considered a lead-based paint abatement action even if the effect of the work removes or controls lead exposure potentials to the occupants. However, appropriate precautions for protecting occupants and leaving the building clean after concluding any work disturbing paint with lead must be considered. Specific training and certification requirements (29 CFR §1926.21 or authorized state program requirements) may not be necessary for all projects; nevertheless, it is strongly recommended that the contractor have appropriate training regarding lead-based paint. The Contractor is responsible for ensuring that no employee or building occupant is exposed to lead from lead-base paint.

01005-11

1.19 AS-BUILT DRAWINGS:

1.19.1 The Contractor shall maintain a set of red-lined full-size, as-built construction drawings marked-up to fully indicate as-built conditions. These drawings shall be maintained in a current condition at all times until completion of the work and shall be available for review by Government personnel at all times. The location as dimensioned from permanent features, general description, type of material, and approximate depth below finished grade of all new and existing exterior underground utilities encountered shall be indicated. All variations from the contract drawings for the required coordination between trades, shall be indicated. These variations shall be shown in the same general detail utilized in the initial contract drawings. As-built construction drawings shall be furnished to the Contracting Officer for use during the final inspection. The as-built drawings shall be submitted to the Contracting Officer in accordance with Section 01300: SUBMITTALS.

END OF SECTION

01300-1

MIN 09-0096

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01300

SUBMITTALS

1.1 PROCEDURES:

1.1.1 The Contractor shall be required to submit items listed in the Submittal Schedule at the end of this section.

1.1.2 Transmit each item under AF 3000, Material Approval Submittal form. Identify contract number, project number, and Contractor. Identify section and paragraph reference for each item submitted with the AF 3000.

Submit five (5) copies unless otherwise required elsewhere in the specification.

1.1.3 Unless specifically stated otherwise elsewhere in this

specification, each submittal shall be approved by the Contracting Officer prior to incorporation of materials into the work.

1.1.4 Approvals of submittals which do not conform to the Contract shall not be construed as a change to the contract.

1.1.5 The Contractor shall fill in the "Required Submission Date" on the AF Form 66s with the date he plans on submitting the submittals to the Government. A copy of the AF Form 66s with the required submission date filled in shall be submitted to the Contracting Officer for use by the contract administrator. Submit in accordance with Section 01300.

1.2 MANUFACTURER'S DATA AND SAMPLES: For the following types of submittals when a specific product of a specific manufacturer is identified (by catalog or product number, pattern, or style) and the Contractor does not desire to propose an alternate product as an equal, where an equal is allowed, a detailed submittal will not be required. The Contractor shall submit on an AF Form 3000 a list of submittals for which the specified products will be used. Submit in accordance with procedures identified in 1.1 above.

1.2.1 Product Data: Submit complete manufacturer's literature which describes all salient characteristics identified as requirements in the specification. Literature which is not specific to the proposed product shall be marked to indicate clearly which item is being proposed for use in this contract.

01300-2

1.2.2 Manufacturer's Certification: Submit a statement from the product manufacturer that proposed products meet the specified standards and other salient characteristics identified as requirements in the specification.

1.2.3 Installation Instructions: Submit manufacturer's printed instructions for delivery, storage, assembly, installation, start-up (if applicable) and adjustments. Information shall include temperature restrictions and any other environmental limitations as well as substrate preparation requirements if any exist.

1.2.4 Samples:

1.2.4.1 Submit full range of manufacturer's standard colors, textures and patterns for specified items for selection by the Contracting Officer.

1.2.4.2 Submit samples to illustrate performance and

functional characteristics of the product. Samples shall include integral parts, attachment devices and specified accessories. Provide full identification information on each sample.

1.3 SHOP DRAWINGS: Drawings shall illustrate how the specified materials are integrated into the work as a whole. Adjacent materials which affect the complete installation of the specified products shall be shown and identified.

Deviations from Contract drawings shall be clearly identified and reason for deviation clearly explained.

1.4 TEST DATA: Test results shall be dated and signed by the agency performing the test.

1.5 WARRANTY: Submit detailed warranty information which identifies specifically items covered as well as exclusions from the warranty and the warranty period. All copies shall be dated and signed by an authorized officer of the company. The officer's name and title shall be typed on the warranty adjacent to the signature.

1.6 OPERATION/MAINTENANCE INSTRUCTIONS: Submit manufacturer's published instructions.

1.7 MISCELLANEOUS SUBMITTALS: Submittals which are none of the above types shall meet the specific requirements identified in the referenced paragraph of the Specification Section identified in the schedule.

1.8 SUBMITTAL SCHEDULE: The following is a list of required submittals for this Contract.

SC

H

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T itl e:

S ol ic ita tio n/

C on tra ct

N um be r

T O

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

E R

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A

TO

N um be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

5, 1.

.2 az m at L is t, M

SD

5, .1

4.

D is po sa l P la n

5, .1

4.

N

PD

ES

#N

G -0

5, .1

5.

C ec yc le d/ D is po se d

R ep or t

5, .1

6.

M on th ly

R ep or t

5, .1

6.

Le tte r

5, .1

7.

W as te S hi pm en t R ep or t

5, .1

7.

SF

5, .1

9.

As

B ui lt D ra w in g

0, .3

0, .2

.1 ot ic e of

In te nt

C on st ru ct A dd iti on to

B ui ld in g

01300-1

Q

JV

F

-0

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, 0, .3

.5 is po sa l P ap er w or k

0, S

0, 1.

yc le d

So lid

W as te

0, as te an ag em en t P la n

0, 2.

yc le d

Pu rc ha se

2, .4

0, ar ni ng T ap es

0, Su bm itt al s

5, ub m itt al s

0, .4

A , C

, E , F itt al s

01300-2

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, es ig n M ixt ur e

0, FR

S ta te m en t

0, G

Fi el d

R ep or ts

1, A

Pr od uc t D at a

1, Q ua lif ic at io n D at a

1, C at er ia l C er tif ic at es

1, St em en t

1, ea th er

P ro ce du re s

0, itt al s

0, di ng C er tif ic at es

0, lit y C on tro l R ep or ts

01300-3

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, itt al s

0, di ng C er tif ic at es

0, C er tif ic at es

0, An al ys is

0, itt al s

0, .4

A ,B

,C itt al s

0, Ev al ua tio n R ep or ts

0, Fi d R ep or ts

0, itt al s

0, Sh op D ra w in ig s

0, or

S am pl es

01300-4

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, In st al la tio n In st ru ct io ns

0, yc le d C on te nt

0, itt al s

7, itt al s

0, Fo rm s

A-th ru

A -2

0, Fo rm C

0, uc t D at a

0, FM

lo ba l M an ua l

0, ra nt y (F or m s B-th ru B

-2

0, .6

S

0, .7 yc le d

C on te nt

01300-5

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, .5

.8 lit y

C on tro l R ec or d

0, .5 oo f Pl an D w g

0, .5

.8 .3

A s-

Bu ilt

R oo f Su m m ar y

(F or m s

C

D

0, ra nt y

0, itt al s

0, itt al s

0, ra nt y

0, ra nt y

0, D ra w in gs

0, P ro du ct a

0, ho p

D ra w in gs

01300-6

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, Sc he du le s

0, er tif ic at io ns

0, M M an ua ls

0, ra nt y

0, io r P ro du ct io n H is to ry

0, uc t D at a

0, M M an ls

0, Sa m pl es

0, D aw in gs

8, itt al s

8, .1 ra nt y

01300-7

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

0, uf ac tu re rs

L ite ra tu re

0, uf ac tu re rs

C er tif ic at io n

0, or

C hi ps

0, itt al s

0, itt al s

0, itt al s

SE

C

TI

O N

/1

&M M

AN

U

AL

S

SE

C

TI

O N

/1

AM

ED

IN

ST

R U

C

TI

O N

S

SE

C

TI

O N

/2

VA

LV

E

SC

H

ED

U

LE

SE

C

TI

O N

/1

U C

T

IN

SU

LA

TI

O

N

SE

C

TI

O N

/1

PI

PE

IN

SU

LA

TI

O

N

01300-8

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

SE

C

TI

O N

/1

EF

R

IG

. P

IP

E

IN

SU

L.

SE

C

TI

O N

/1

JA

KE

TI

N

G

A D

H

ES

IV

ES

SE

C

TI

O N

/1

F

IT

TI

N

G S

SE

C

TI

O N

/1

AN

H

O

LE

SE

C

TI

O N

/1

F

IT

TI

N

G S

SE

C

TI

O N

/1

ES

SE

C

TI

O N

/1

TH

ST

B

LO

C

KS

SE

C

TI

O N

/1

AN

H

O

LE

SE

C

TI

O N

/1

F

IT

TI

N

G S

SE

C

TI

O N

/1

ES

SE

C

TI

O N

/1

ER

C

LO

SE

TS

01300-9

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

SE

C

TI

O

N

/1

LA

TO

R

IE

S

SE

C

TI

O

N

/1

FA

C

ET

S

SE

C

TI

O

N

/1

ER

C

O O

LE

R

SE

C

TI

O

N

/1

AC

ES

S

PA

N

EL

S

SE

C

TI

O

N

/1

FL

O R

D R

AI

N

S

SE

C

TI

O

N

/1

.9

TE

ST

R

EP

O R

TS

SE

C

TI

O

N

/1

SP

IN

KL

ER

D

R

AW

IN

G

S

SE

C

TI

O

N

/1

R

EP

O R

TS

SE

C

TI

O

N

/1

ER

TI

FI

C

AT

ES

SE

C

TI

O

N

/1

AS

U

IL

TS

SE

C

TI

O

N

/1

F

IT

TI

N G

S

01300-10

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

SE

C

TI

O

N

/1

ES

SE

C

TI

O

N

/1

PU

PS

SE

C

TI

O

N

/1

TA

K

AI

R

S

EP

SE

C

TI

O

N

/1

LY

C O

L

SE

C

TI

O

N

/1

AU

G

ES

T

H

ER

M O

M

ET

ER

S

SE

C

TI

O

N

/1

R

EP

O R

TS

SE

C

TI

O

N

/1

AI

H

AN

D

LE

R

SE

C

TI

O

N

/1

N D

EN

SE

R U

N

IT

SE

C

TI

O

N

/1

IF

FU

SE

R

SE

C

TI

O

N

/1

EX

AU

ST

F

AN

S

SE

C

TI

O

N

/1

LO

VE

R

01300-11

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

SE

C

TI

O

N

R

EP

O R

T

SE

C

TI

O

N

/2 .1

FI

LT

ER

S

ET

S

SE

C

TI

O

N

N

TR

O L

D R

AW

IN

G S

SE

C

TI

O

N

PR

D U

C T

D

AT

A

SE

C

TI

O

N

/1

M M

AN

U

AL

S

SE

C

TI

O

N

/1

D U

C T

D

AT

A

SE

C

TI

O

N

/1

D

U C

T D

AT

A

SE

C

TI

O

N

/3

SE

C

TI

O

N

/1

D

U C

T D

AT

A

SE

C

TI

O

N

/3

S

01300-12

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

SE

C

TI

O

N

/1

D U

C T

D

AT

A

SE

C

TI

O

N

/1

D

U C

T D

AT

A

SE

C

TI

O

N

/1

D

U C

T D

AT

A

SE

C

TI

O

N

/1

D

U C

T D

AT

A

SE

C

TI

O

N

/1

D

U C

T D

AT

A

SE

C

TI

O

N

/1

SH

AW

IN

G S/

VE

R

IF

IC

AT

IO

N

SE

C

TI

O

N

SU

PP

LI

ER

Q

U

AL

IF

IC

AT

IO

N S

SE

C

TI

O

N

/3

IN

G

SE

C

TI

O

N

/3

AR

R

AN

TY

SE

C

TI

O

N

4/

1.

2.

D U

C T

D

AT

A

01300-13

A F

Fo rm

ED

U

LE

O F

M

AT

ER

IA

LS

S

U B

M

IT

TA

LS

P ro je ct

N um be r

P ro je ct

T ic ita tio n/

C on tra ct

N um

B E

C O

M P

LE

TE

D B

Y P

R O

JE

C

T E

N G

IN

E

B

E C

O M

P

LE

TE

D

B Y

C O

N

TR

A C

T A

D M

IN

IS

TR

A be r o f C op ie s R eq ui re d

LINE NUMBER

IT

EM

O R

D

ES

C R

IP

TI

O N

O F

IT

EM

, C O

N

TR

A C

T R

EF

ER

EN

C

E, T

YP

E

O F

SU

B

M

IT

TA

L

CERTIFICATION OF

COMPLIANCE

SHOP DRAWINGS

SAMPLES

COLOR SELECTION

MANUFACTURER'S

RECOMMENDATIONS

MANUFACTURER'S

WARRANTY

CATALOG DATA

OPERATING

INSTRUCTIONS

TESTS

OTHER

REQUIRED

SUBMISSION DATE

DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

D A

TE

C

O N

TR

A

C

TO

R N

O

TI

FI

ED

CONTRACTOR

RESUBMITTAL

FINAL APPROVAL

R

EM

A R

K S

A

PP

R O

VE

D

D

IS

A

PP

R O

VE

D

C on st ru ct A dd iti on to

B ui ld in g

Q

JV

F

-0

SE

C

TI

O

N

4/

1.

3.

ER

TI

FI

C

AT

IO

N

SE

C

TI

O

N

/1

AR

R

AN

TY

SE

C

TI

O

N

/1

SH

P

D R

AW

IN

G S

01300-14

END OF SECTION

A F

Fo rm

01400-1

SECTION 01400

QUALITY CONTROL

1.1 REQUIREMENTS INCLUDED:

1.1.1 General Quality Control.

1.1.2 Workmanship.

1.1.3 Manufacturers' Instructions.

1.1.4 Manufacturers' Certificates.

1.1.5 Manufacturers' Field Services.

1.1.6 Testing Laboratory Services.

1.2 RELATED REQUIREMENTS:

1.2.1 Section 01300 – Submittals

1.3 QUALITY CONTROL: Maintain quality control over suppliers, manufac-turers, products, services, site conditions, and workmanship, to produce work of specified quality.

1.4 WORKMANSHIP:

1.4.1 Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.

1.4.2 Perform work by persons qualified to produce workmanship of specified quality.

1.4.3 Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.

1.5 MANUFACTURERS' INSTRUCTIONS: Comply with instructions in full detail, including each step in sequence. Should instructions conflict with Contract Documents, request clarification from the Contracting Officer before proceeding.

01400-2

1.6 MANUFACTURERS' CERTIFICATES: When required by individual

Specifications Section, submit five copies of the manufacturer's certificate indicating that products meet or exceed specified requirements.

1.7 MANUFACTURERS' FIELD SERVICES:

1.7.1 When specified in respective Specification Sections, require supplier to provide qualified personnel to observe field conditions;

conditions of surfaces and installation; quality of workmanship; start-up of equipment; test, adjust, and balance of equipment as applicable; and to make appropriate recommendations.

1.7.2 Representative shall submit written report to the Contracting Officer, listing observations and recommendations.

1.8 TESTING LABORATORY SERVICES:

1.8.1 Contractor shall employ and pay for services of an Independent Testing Laboratory to perform inspections, tests, and other services required by individual Specification Sections.

1.8.2 Services will be performed in accordance with requirements of governing authorities and with specified standards.

1.8.3 Reports will be submitted to Contracting Officer in duplicate, giving observations and results of tests, indicating compliance or non-compliance with specified standards and with Contract Documents.

1.8.4 Contractor shall cooperate with Testing Laboratory personnel;

furnish tools, samples of materials, design mix, equipment, storage, and assistance as requested.

1.8.4.1 Notify Contracting Officer and Testing Laboratory

24 hours prior to expected time for operations requiring testing services.

1.8.4.2 Make arrangements with Testing Laboratory and pay for additional samples and tests for Contractor's convenience.

2. PRODUCTS: Not Used.

01500-1

SECTION 01500

CONSTRUCTION FACILITIES & TEMPORARY CONTROLS

1.1.1 Electricity, Lighting.

1.1.2 Heat, Ventilation.

1.1.3 Telephone Service.

1.1.4 Water.

1.1.5 Sanitary Facilities.

1.1.6 Barriers.

1.1.7 Enclosures.

1.1.8 Protection of Installed Work.

1.1.9 Security.

1.1.10 Cleaning During Construction.

1.1.11 Removal.

1.2 RELATED REQUIREMENTS:

1.2.1 Outages.

1.2.1.1 Outages shall include:

1.2.1.1.1 Blocking of Roadway.

1.2.1.1.2 Blocking of Parking Lots.

1.2.1.1.3 Power Outages.

1.2.1.1.4 Fire Alarms

01500-2

1.2.1.2 Notification

1.2.1.2.1 The Contractor shall notify the inspector, in writing, seven days in advance of the intended outage.

1.2.1.2.2 The Contractor shall notify the Fire

Department of an intended roadway blockage.

1.2.1.2.3 The Contractor shall notify the Fire

Department of any intended fire alarm outage.

1.3 REGULATIONS: The Contractor shall comply with the prevention practice contained in NFPA Standard #241, Standard for Safeguarding Building Construction and Demolition Operations.

1.4 ELECTRICITY:

1.4.1 All reasonable quantities of utilities will be made available to the Contractor at no charge.

1.4.2 Provide service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of Construction-type power cords.

1.4.3 Provide lighting for construction operations.

1.4.4 Existing and permanent lighting may be used during

construction. Maintain lighting and make routine repairs.

1.4.5 Portable power, if required, shall be provided by the

Contractor.

1.4.6 Refer to Section 16010 - Electrical General Provisions for electrical outage requirements.

1.5 HEAT, VENTILATION:

1.5.1 Provide as required to maintain specified conditions for construction operations, to protect materials and finishes from damage due to temperature or humidity.

1.5.2 Coordinate use of existing facilities with Using Agency;

extend and supplement with temporary units as required to maintain specified conditions for construction operations, to protect materials and finishes from damage due to temperature or humidity.

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to Construct Addition to Bldg 973, newest first.
File Type Posted
09-0096 E-2.pdf PDF
09-0096 16722 1-23 —
09-0096 E-1.pdf PDF
09-0096 TOC 1 —
Amendment 3.doc DOC document
09-0096 E-3.pdf PDF
09-0096 09650 RESILIENT FLOORING.pdf PDF
09-0096 07401 PREFORMED METAL WALL PANELS(for IDIQ metal siding).pdf PDF
09-0096 TOC.pdf PDF
09-0096 09688 CARPETING GLUE-DOWN.pdf PDF
09-0096 06400 1.pdf PDF
Amendment 2 —
09-0096 A-3.pdf PDF
Amendment 2.doc DOC document
09-0096 C-1.pdf PDF
09-0096 A-3.pdf PDF
09-0096 A-1.pdf PDF
09-0096 A-2.pdf PDF
Amendment 1.doc DOC document
Solicitaion FA4528-11-R-0006.doc DOC document
09-0096 S2.pdf PDF
09-0096 Drawings.pdf PDF
Bid Schedule Bldg 973.pdf PDF
Solicitaion FA4528-11-R-0006.doc DOC document
Drawings.pdf PDF
Solicitaion FA4528-11-R-0006.doc DOC document
Drawings.pdf PDF
Attachment 4 Technical Acceptance Criteria.doc DOC document
ATTACHMENT 5 Responsibility Questionnaire.doc DOC document
Wage Determination.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .