This document is a Solicitation Questions & Answers file for the FY26 Airfield Striping & Rubber Removal project, issued by the 436 CONS/PKA Contracting Office under Solicitation #FA449726R0004. The project involves airfield maintenance services, specifically rubber removal from touchdown zones of Runways 01, 19, and 32, and pavement marking/striping. Key requirements include high-pressure water blasting for rubber removal, on-site demonstration prior to work, three friction tests (once in spring and once in fall), and adherence to specific SOW guidelines for surface preparation, quality control, and waste disposal. Contractors may work extended hours with Contracting Officer approval and must carefully coordinate with Airfield Operations.
The solicitation provides detailed guidance on past performance submissions, work windows, surface temperature limitations, and marking specifications. Contractors must distribute past performance surveys to customers, with surveys to be included in proposal submissions. The contract includes a standard one-year materials and workmanship warranty, and all airfield operations coordination will be determined after contract award. The proposal due date was extended to 16 Jan 2026, with specific points of contact provided: SSgt Mariah Thompson and TSgt Gary Spillane from the contracting office.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA449726R00040002 SF 30.pdf | ||
| Additional FY26 Airfield Striping Rubber Removal QAs.pdf | ||
| Solicitation Amendment FA449726R00040001 SF 30.pdf | ||
| Solicitation - FA449726R0004.pdf | ||
| 1. SOW FY26 Airfield Striping AND Rubber Removal_28 Aug 25.pdf | ||
| 3. Past and Present Performance Survey.pdf | ||
| 4. Wage Determination.pdf | ||
| 2. Bid Schedule FY26 Striping AND Rubber Removal.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions & Answers
18 April 2019 Page 1 of 318 April 2019 Page 1 of 3
Program Title: FY26 Airfield Striping & Rubber Removal
Contracting Office: 436 CONS/PKA
Solicitation #: FA449726R0004
Subject: FY26 Airfield Striping & Rubber Removal
Summary of Site Visit (if applicable)
Question Answer
1. Will the Government recognize past experience and performance of sister companies to the submitting offeror (subsidiaries owned by the same parent company who share the same leadership, best practices, and operating procedures) as equivalent to that of the offering firm?
The government will only recognize past performance of companies (contractor or subcontractor) that will actually be performing the work.
2. To provide the government with a cohesive and thoroughly reviewed scope and comprehensive pricing, would the government consider extending this due date by two weeks, with an equivalent extension to the RFI due date?
The due date will be extended to 16 Jan 2026.
3. Please confirm that Past performance surveys need to be sent to our customer with instructions to send them directly to you in the 436 CONS at these email addresses.
We request that you distribute the past performance surveys to your customers. Once completed, they may be sent directly to the contracting office or returned to you to be included with the proposal. Before sending, please ensure all customer contact information is accurate and legible.
4. Please confirm that for CPARS we should complete the Past performance survey attach the CPARS to it and then just send that to you.
If CPARS are available, ensure their inclusion in your proposal submission. You may attach them to the Past performance survey.
5. Typically we just include the Past performance surveys / CPARS in our proposal as a complete package and submit that to the Contracting Office. I just want to confirm that we are sending them separately and before the closing date.
You may include past performance surveys / CPARS in our proposal and submit that to the Contracting Office to ensure a complete package.
6. Can you confirm the POCs? SSgt Mariah Thompson / mariah.thompson@us.af.mil TSgt Gary Spillane / gary.spillane@us.af.mil
7. How is the water from the removal process typically disposed of?
See SOW Part 2 Para 4.8.2. Wet debris from the removal process is stored at the laydown area and allowed to dry. The dry debris is then disposed of properly off base.
8. Will extend work hours be allowed i.e night and weekend work.
Yes, however hours outside normal duty hours require Contracting Officer approval. It is best to propose the actual hours planned up front and have base access badges reflect the actual hours the contractor proposes to work. Careful coordination with Airfield Operations is required for all working hours.
9. The project calls for 3 before and after frictions test on rubber removal areas. Will the be done twice, once in spring and once in fall?
Yes
10. Statement of Work, paragraph 1.2 states, “The contractor shall provide all design, labor, materials, tools, and equipment necessary to perform Airfield Striping & Rubber Removal.”
Please clarify the design requirements for this project.
There are no "design" requirements as such. However design layout ----SOW 1.4.1.3. Provide layouts for all new pavement markings. This requirement is rare but does occur when pavement markings are changed by new regulatory requirements or or old markings removal
18 April 2019 Page 2 of 3
Question Answer
11. Please confirm that the Government will allow the proposer a minimum of fourteen (14) calendar days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received.
The Government will allow the proposer the time indicated in the RFP to respond. The government will endeavor to answer RFIs in a timely manner
12. Will the Government accept CPARS in lieu of Past Performance Surveys? Given the holiday period, obtaining Past Performance Surveys from our references in a timely fashion will be difficult.
No
13. Section L., 3(b) Past and Present Performance Surveys states, “Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate.” Is there a narrative requirement for Past Performance or do the Past Performance Surveys constitute the entire Past Performance submission?
Proposals may explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate in the proposal narratives. Care must be taken to avoid exceeding narrative page limits (if indicated).
14. If there is a narrative requirement for Past Performance, do any page limitations apply? See Answer 13.
15. Please confirm the governing Criteria for airfield pavement markings and rubber removal, including all applicable UFCs, ETLs, and AFIs to be used for materials, installation, testing and acceptance.
Outlined in SOW Part II, 1
16. In the event of conflicts between drawings, specifications, UFCs, ETLs, and AFIs, please confirm the order of precedence.
Typically, the order of precedence in Department of Defense (DoD) and Air Force construction projects is as follows:
1 Contract Modifications and Change Orders 2 The Contract Agreement 3 Specifications 4 Drawings 5 Referenced Documents (UFCs, ETLs, AFIs) When a conflict is identified, the proper procedure is to submit a Request for Information (RFI).
17. Please clarify the exact limits of rubber removal at runway, taxiway, and apron locations (e.g., touchdown zones only versus full width/full-length areas). Are limits to be field-verified or strictly per the drawings?
The contractor shall perform rubber removal on the touchdown zones of Runways 01, 19, and 32. The amount of rubber removal shall not exceed the quantities stated in SOW Para 1.4.1.18.
18. Please confirm the acceptable rubber removal methods (high-pressure water blasting, chemical removal, mechanical methods) and whether method approval, testing, or on-site demonstration is required prior to production work.
High pressure water blasting is the preferred method. On-site demonstration/pressure adjustment is required prior to production work.
19. Following rubber removal, please confirm minimum surface friction or texture requirements, testing method (CFME, DFT, or equivalent), testing frequency, and acceptable criteria.
See Sow Para. 1.4.1.18
20. Please clarify whether existing pavement markings must be fully removed prior to restriping or if over-striping is permitted in designated areas.
See SOW Para. 1.4.1.1
21. Please confirm approved pavement marking materials for runways, taxiways, aprons, and shoulders, including any operational restrictions.
See SOW Part II Para 1.5 Specifications For Airfield And Heavy-Duty Pavements
22. Please confirm glass bead type, gradation, application rate, and minimum retroreflectivity values at acceptance and during the warranty period.
ee SOW Part II Para 1.5 Specifications For Airfield And Heavy- Duty Pavements
18 April 2019 Page 3 of 3
23. Please confirm required dimensions, tolerances, and color standards for runway, taxiway, and apron markings, including hold positions and ILS critical area markings.
Outlined in SOW Part II, 1
24. Please clarify allowable work windows, maximum closure durations, daily phasing limits, and coordination requirements with airfield operations.
All limits to airfield operations shall be worked out by the contractor with airfield operations after contract award and prior to rubber removal/striping operations.
25. Please confirm minimum and maximum pavement temperature, ambient temperature, humidity, wind, and moisture limitations for rubber removal and striping operations.
Outlined in SOW Part II, 1
26. Please clarify required surface preparation following rubber removal, including drying time, cleanliness standards, and inspection hold points prior to striping.
Outlined in SOW Part II, 1
27. Please confirm the QC staffing requirements, testing frequency, documentation, and whether a dedicated QCM is required during all airfield operations.
Outlined in SOW Part II, 4.7
28. Please identify required government inspections, testing, and approvals prior to reopening runways, taxiways, or aprons to aircraft traffic.
Outlined in SOW Part II, 6.3 & 6.4
29. Please confirm protection requirements for airfield lighting, signage, sensors, and adjacent pavements during rubber removal and striping.
Outlined in SOW Part II, 4.6
30. Please confirm FOD control measures, sweep frequency, inspection responsibilities, and acceptance requirements prior to reopening pavements to aircraft.
Outlined in SOW Part II, 4.6. FOD control shall be ongoing and completed immediately. The work environment is an active airfield.
31. Please clarify waste disposal requirements for rubber residue, spent water, chemicals, and removed pavement markings, including any base-specific environmental procedures, permits, or approved disposal locations.
See SOW Part 2 Para 4.8.2. Wet debris from the removal process is stored at the lay down area and allowed to dry. The dry debris is then disposed of properly off base.
32. Please confirm warranty duration and performance criteria for pavement markings, including allowable wear, peeling, delamination, or retroreflectivity.
Standard 1 year materials and workmanship warranty
33. Please confirm whether the contractor is responsible for survey, layout, and verification of existing airfield geometry and pavement markings prior to stripping operations, or if layout is based solely on existing conditions and contract drawings.
SOW 1.4.1.3. Provide layouts for all new pavement markings.
This requirement is rare but does occur when pavement markings are changed by new regulatory requirements or or old markings removal
34. Please identify any concurrent or planned airfield construction, maintenance, or operational activities that may affect access, phasing, sequencing, or completed pavement markings.
None All affected areas will be identified by project manager and airfield management prior to execution.
Date
05 Jan 2026
Earl D. Waller, Project Engineer Signature
Date
07 Jan 2026
Gary J. Spillane, TSgt, USAF Signature
| Untitled |
| Untitled |
Solicitation Questions & Answers 18 April 2019 Page of Summary of Site Visit (if applicable) Question Answer 9.0.0.2.20120627.2.874785
| Security_Markings: |
| CurrentPage: |
| PageCount: |
| Program-Title: FY26 Airfield Striping & Rubber Removal |
| Contracting-Office: 436 CONS/PKA |
| Contracting-Office: FA449726R0004 |
| Basic_Quantity: FY26 Airfield Striping & Rubber Removal |
| TextField1: |
| Add: |
| Cell1: 1. Will the Government recognize past experience and performance of sister companies to the submitting offeror (subsidiaries owned by the same parent company who share the same leadership, best practices, and operating procedures) as equivalent to that of the offering firm? |
| Cell1: 2. To provide the government with a cohesive and thoroughly reviewed scope and comprehensive pricing, would the government consider extending this due date by two weeks, with an equivalent extension to the RFI due date? |
| Cell1: 3. Please confirm that Past performance surveys need to be sent to our customer with instructions to send them directly to you in the 436 CONS at these email addresses. |
| Cell1: 4. Please confirm that for CPARS we should complete the Past performance survey attach the CPARS to it and then just send that to you. |
| Cell1: 5. Typically we just include the Past performance surveys /CPARS in our proposal as a complete package and submit that to the Contracting Office. I just want to confirm that we are sending them separately and before the closing date. |
| Cell1: 6. Can you confirm the POCs? |
| Cell1: 7. How is the water from the removal process typically disposed of? |
| Cell1: 8. Will extend work hours be allowed i.e night and weekend work. |
| Cell1: 9. The project calls for 3 before and after frictions test on rubber removal areas. Will the be done twice, once in spring and once in fall? |
| Cell1: 10. Statement of Work, paragraph 1.2 states, “The contractor shall provide all design, labor, materials, tools, and equipment necessary to perform Airfield Striping & Rubber Removal.” Please clarify the design requirements for this project. |
| Cell1: 11. Please confirm that the Government will allow the proposer a minimum of fourteen (14) calendar days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received. |
| Cell1: 12. Will the Government accept CPARS in lieu of Past Performance Surveys? Given the holiday period, obtaining Past Performance Surveys from our references in a timely fashion will be difficult. |
| Cell1: 13. Section L., 3(b) Past and Present Performance Surveys states, “Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate.” Is there a narrative requirement for Past Performance or do the Past Performance Surveys constitute the entire Past Performance submission? |
| Cell1: 14. If there is a narrative requirement for Past Performance, do any page limitations apply? |
| Cell1: 15. Please confirm the governing Criteria for airfield pavement markings and rubber removal, including all applicable UFCs, ETLs, and AFIs to be used for materials, installation, testing and acceptance. |
| Cell1: 16. In the event of conflicts between drawings, specifications, UFCs, ETLs, and AFIs, please confirm the order of precedence. |
| Cell1: 17. Please clarify the exact limits of rubber removal at runway, taxiway, and apron locations (e.g., touchdown zones only versus full width/full-length areas). Are limits to be field-verified or strictly per the drawings? |
| Cell1: 18. Please confirm the acceptable rubber removal methods (high-pressure water blasting, chemical removal, mechanical methods) and whether method approval, testing, or on-site demonstration is required prior to production work. |
| Cell1: 19. Following rubber removal, please confirm minimum surface friction or texture requirements, testing method (CFME, DFT, or equivalent), testing frequency, and acceptable criteria. |
| Cell1: 20. Please clarify whether existing pavement markings must be fully removed prior to restriping or if over-striping is permitted in designated areas. |
| Cell1: 21. Please confirm approved pavement marking materials for runways, taxiways, aprons, and shoulders, including any operational restrictions. |
| Cell1: 22. Please confirm glass bead type, gradation, application rate, and minimum retroreflectivity values at acceptance and during the warranty period. |
| Cell1: 23. Please confirm required dimensions, tolerances, and color standards for runway, taxiway, and apron markings, including hold positions and ILS critical area markings. |
| Cell1: 24. Please clarify allowable work windows, maximum closure durations, daily phasing limits, and coordination requirements with airfield operations. |
| Cell1: 25. Please confirm minimum and maximum pavement temperature, ambient temperature, humidity, wind, and moisture limitations for rubber removal and striping operations. |
| Cell1: 26. Please clarify required surface preparation following rubber removal, including drying time, cleanliness standards, and inspection hold points prior to striping. |
| Cell1: 27. Please confirm the QC staffing requirements, testing frequency, documentation, and whether a dedicated QCM is required during all airfield operations. |
| Cell1: 28. Please identify required government inspections, testing, and approvals prior to reopening runways, taxiways, or aprons to aircraft traffic. |
| Cell1: 29. Please confirm protection requirements for airfield lighting, signage, sensors, and adjacent pavements during rubber removal and striping. |
| Cell1: 30. Please confirm FOD control measures, sweep frequency, inspection responsibilities, and acceptance requirements prior to reopening pavements to aircraft. |
| Cell1: 31. Please clarify waste disposal requirements for rubber residue, spent water, chemicals, and removed pavement markings, including any base-specific environmental procedures, permits, or approved disposal locations. |
| Cell1: 32. Please confirm warranty duration and performance criteria for pavement markings, including allowable wear, peeling, delamination, or retroreflectivity. |
| Cell1: 33. Please confirm whether the contractor is responsible for survey, layout, and verification of existing airfield geometry and pavement markings prior to stripping operations, or if layout is based solely on existing conditions and contract drawings. |
| Cell1: 34. Please identify any concurrent or planned airfield construction, maintenance, or operational activities that may affect access, phasing, sequencing, or completed pavement markings. |
| Cell3: The government will only recognize past performance of companies (contractor or subcontractor) that will actually be performing the work. |
| Cell3: The due date will be extended to 16 Jan 2026. |
| Cell3: We request that you distribute the past performance surveys to your customers. Once completed, they may be sent directly to the contracting office or returned to you to be included with the proposal. Before sending, please ensure all customer contact information is accurate and legible. |
| Cell3: If CPARS are available, ensure their inclusion in your proposal submission. You may attach them to the Past performance survey. |
| Cell3: You may include past performance surveys / CPARS in our proposal and submit that to the Contracting Office to ensure a complete package. |
| Cell3: SSgt Mariah Thompson / mariah.thompson@us.af.mil |
TSgt Gary Spillane / gary.spillane@us.af.mil
| Cell3: See SOW Part 2 Para 4.8.2. Wet debris from the removal process is stored at the laydown area and allowed to dry. The dry debris is then disposed of properly off base. |
| Cell3: Yes, however hours outside normal duty hours require Contracting Officer approval. It is best to propose the actual hours planned up front and have base access badges reflect the actual hours the contractor proposes to work. Careful coordination with Airfield Operations is required for all working hours. |
| Cell3: Yes |
| Cell3: There are no "design" requirements as such. However design layout ----SOW 1.4.1.3. Provide layouts for all new pavement markings. This requirement is rare but does occur when pavement markings are changed by new regulatory requirements or or old markings removal |
| Cell3: The Government will allow the proposer the time indicated in the RFP to respond. The government will endeavor to answer RFIs in a timely manner |
| Cell3: No |
| Cell3: Proposals may explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate in the proposal narratives. Care must be taken to avoid exceeding narrative page limits (if indicated). |
| Cell3: See Answer 13. |
| Cell3: Outlined in SOW Part II, 1 |
| Cell3: Typically, the order of precedence in Department of Defense (DoD) and Air Force construction projects is as follows: |
1 Contract Modifications and Change Orders 2 The Contract Agreement 3 Specifications 4 Drawings 5 Referenced Documents (UFCs, ETLs, AFIs) When a conflict is identified, the proper procedure is to submit a Request for Information (RFI).
| Cell3: The contractor shall perform rubber removal on the touchdown zones of Runways 01, 19, and 32. The amount of rubber removal shall not exceed the quantities stated in SOW Para 1.4.1.18. |
| Cell3: High pressure water blasting is the preferred method. On-site demonstration/pressure adjustment is required prior to production work. |
| Cell3: See Sow Para. 1.4.1.18 |
| Cell3: See SOW Para. 1.4.1.1 |
| Cell3: See SOW Part II Para 1.5 Specifications For Airfield And Heavy-Duty Pavements |
| Cell3: ee SOW Part II Para 1.5 Specifications For Airfield And Heavy-Duty Pavements |
| Cell3: Outlined in SOW Part II, 1 |
| Cell3: All limits to airfield operations shall be worked out by the contractor with airfield operations after contract award and prior to rubber removal/striping operations. |
| Cell3: Outlined in SOW Part II, 1 |
| Cell3: Outlined in SOW Part II, 1 |
| Cell3: Outlined in SOW Part II, 4.7 |
| Cell3: Outlined in SOW Part II, 6.3 & 6.4 |
| Cell3: Outlined in SOW Part II, 4.6 |
| Cell3: Outlined in SOW Part II, 4.6. FOD control shall be ongoing and completed immediately. The work environment is an active airfield. |
| Cell3: See SOW Part 2 Para 4.8.2. Wet debris from the removal process is stored at the lay down area and allowed to dry. The dry debris is then disposed of properly off base. |
| Cell3: Standard 1 year materials and workmanship warranty |
| Cell3: SOW 1.4.1.3. Provide layouts for all new pavement markings. This requirement is rare but does occur when pavement markings are changed by new regulatory requirements or or old markings removal |
| Cell3: None All affected areas will be identified by project manager and airfield management prior to execution. |
| Date: 05 Jan 2026 |
| Date: 07 Jan 2026 |
| Name: |
| Signature: |
| TextFieldStyle1: |
| TextFieldStyle2: |
| TextFieldStyle3: |
| TextFieldStyle4: |
| TextFieldStyle5: |
| TextFieldStyle6: |
| TextFieldStyle7: |
| TextFieldStyle8: |
| TextFieldStyle9: |
| TextFieldStyle10: |
| TextFieldStyle11: |
| TextFieldStyle12: |
| TextFieldStyle13: |
| TextFieldStyle14: |
| TextFieldStyle15: |
| TextFieldStyle16: |
| TextFieldStyle17: |
| TextFieldStyle18: |
| TextFieldStyle19: |
| TextFieldStyle20: |
| TextFieldStyle21: |
| TextFieldStyle22: |
| TextFieldStyle23: |
| TextFieldStyle24: |
| TextFieldStyle25: |
| TextFieldStyle26: |
| TextFieldStyle27: |
| TextFieldStyle28: |
| TextFieldStyle29: |
| TextFieldStyle30: |
File details come from the government source that posted it. Updated .