2. Bid Schedule FY26 Striping AND Rubber Removal.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
FY26 Airfield Striping & Rubber Removal Federal contract opportunity
Solicitation number
FA449726R0004
Issued by
Department of the Air Force Air Mobility Command

About this file

This file is a Bid Schedule Excel spreadsheet for the FY26 Airfield Striping & Rubber Removal project at Dover Air Force Base. The document provides a detailed cost estimation template for contractors, requiring completion of 50 divisions using Construction Specifications Institute (CSI) format, with specific focus on Division 32 Exterior Improvements. The project involves paint removal, pavement markings (reflective and non-reflective), and rubber removal across approximately 975,000 square feet of airfield surface.

The solicitation is a Small Business set-aside with a project magnitude between $250,000 and $500,000, utilizing NAICS code 237310. The contract will be Firm Fixed Price (FFP) with a 365-calendar day performance period. Key submission dates include a question deadline of 1:00pm EST on 17 December 2025, and proposal submission due by 1:00pm EST on 9 January 2026, with proposal validity through 31 March 2026. The contract will be managed by the Department of the Air Force Air Mobility Command, with point of contact SSgt Mariah Thompson and Mr. Dimas Bernacchia.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Summary

BID SCHEDULE
28-Aug-24
COMPANY
436th Civil Engineering
PROJECT
FY25 Airfield Striping & Rubber Removal
LOCATIONPROJECT NO.FJXT210026/FJXT220012
DOVER AIR FORCE BASE, DE
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 1General RequirementsERROR:#DIV/0!$0.00
DIVISION 32Exterior ImprovementsERROR:#DIV/0!$0.00
FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

GC Overhead
GC Profit
Risk/Bonding
Design
This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas
2
2

Select Area Cost Factor Type:

DIVISION 36RESERVED
DIVISION 37RESERVED
DIVISION 38RESERVED
DIVISION 39RESERVED
DIVISION 46RESERVED
DIVISION 47RESERVED

DIVISION 49 RESERVED ERROR:#REF! ERROR:#REF!

HARD COST TOTAL ERROR:#DIV/0! $0.00

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%$0.00
SUBTOTAL$0.00
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)0%$0.00
SUBTOTAL$0.00
$0.00
SUBTOTAL$0.00
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0.0%$0.00
CONTRACT TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Sustainment Repair/Const ACF Already Factored

Div1

BID SCHEDULEDATE
August 28, 2024
PROJECTBASIS FOR ESTIMATE
FY25 Airfield Striping & Rubber RemovalCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT210026/FJXT220012
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABOREQUIPMENT
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

BID SCHEDULEDATE
August 28, 2024
PROJECTBASIS FOR ESTIMATE
FY25 Airfield Striping & Rubber RemovalCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT210026/FJXT220012
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
Paint Removal5,000SF$0.00$0.00
Pavement Markings, Reflective (Type I)230,645SF$0.00$0.00
Pavement Markings, Reflective(Type III)SF$0.00$0.00
Pavement Markings, Non-Reflective65,000SF$0.00$0.00$0.00
Rubber Removal975,000SF$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
(02580/1.4 & 1.5)$0.00$0.00$0.00
$0.00
$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
ERROR:#REF!ERROR:#REF!ERROR:#REF!
$0.00
(02680/1.3.1 & 1.4.1)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
$0.00$0.00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL LABOR/MATERIALS$0.00$0.00$0.00
SUBTOTAL$0.00
$0.00
$0.00
$0.00
TOTAL$0.00

&"Verdana,Bold"Construction Cost Estimate

File details come from the government source that posted it. Updated .