2. Bid Schedule FY26 Striping AND Rubber Removal.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- FY26 Airfield Striping & Rubber Removal Federal contract opportunity
- Solicitation number
- FA449726R0004
About this file
This file is a Bid Schedule Excel spreadsheet for the FY26 Airfield Striping & Rubber Removal project at Dover Air Force Base. The document provides a detailed cost estimation template for contractors, requiring completion of 50 divisions using Construction Specifications Institute (CSI) format, with specific focus on Division 32 Exterior Improvements. The project involves paint removal, pavement markings (reflective and non-reflective), and rubber removal across approximately 975,000 square feet of airfield surface.
The solicitation is a Small Business set-aside with a project magnitude between $250,000 and $500,000, utilizing NAICS code 237310. The contract will be Firm Fixed Price (FFP) with a 365-calendar day performance period. Key submission dates include a question deadline of 1:00pm EST on 17 December 2025, and proposal submission due by 1:00pm EST on 9 January 2026, with proposal validity through 31 March 2026. The contract will be managed by the Department of the Air Force Air Mobility Command, with point of contact SSgt Mariah Thompson and Mr. Dimas Bernacchia.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional FY26 Airfield Striping Rubber Removal QAs.pdf | ||
| Solicitation Amendment FA449726R00040002 SF 30.pdf | ||
| Solicitation Amendment FA449726R00040001 SF 30.pdf | ||
| FY26 Striping and Rubber Removal QAs.pdf | ||
| 3. Past and Present Performance Survey.pdf | ||
| 4. Wage Determination.pdf | ||
| Solicitation - FA449726R0004.pdf | ||
| 1. SOW FY26 Airfield Striping AND Rubber Removal_28 Aug 25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
Exceptions:
(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.
(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute
&"Verdana,Bold"Construction Cost Estimate
&P of &N
Summary
| BID SCHEDULE | |
| 28-Aug-24 | |
| COMPANY | |
| 436th Civil Engineering |
| PROJECT | ||||
| FY25 Airfield Striping & Rubber Removal | ||||
| LOCATION | PROJECT NO. | FJXT210026/FJXT220012 | ||
| DOVER AIR FORCE BASE, DE | ||||
| DIVISION | DESCRIPTION | % by | ||
| Division | Division Total |
| DIVISION 1 | General Requirements | ERROR:#DIV/0! | $0.00 | |
| DIVISION 32 | Exterior Improvements | ERROR:#DIV/0! | $0.00 | |
| FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| GC Overhead |
| GC Profit |
| Risk/Bonding |
| Design |
| This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas |
| 2 |
| 2 |
Select Area Cost Factor Type:
| DIVISION 36 | RESERVED |
| DIVISION 37 | RESERVED |
| DIVISION 38 | RESERVED |
| DIVISION 39 | RESERVED |
| DIVISION 46 | RESERVED |
| DIVISION 47 | RESERVED |
DIVISION 49 RESERVED ERROR:#REF! ERROR:#REF!
HARD COST TOTAL ERROR:#DIV/0! $0.00
| PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | $0.00 |
| SUBTOTAL | $0.00 | |
| PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | $0.00 |
| SUBTOTAL | $0.00 | |
| $0.00 | ||
| SUBTOTAL | $0.00 | |
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0.0% | $0.00 |
| CONTRACT TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Sustainment Repair/Const ACF Already Factored
Div1
| BID SCHEDULE | DATE | |||
| August 28, 2024 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| FY25 Airfield Striping & Rubber Removal | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT210026/FJXT220012 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | EQUIPMENT | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | ||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| - 0 | |||||||
| - 0 | |||||||
| - 0 | |||||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div32
| BID SCHEDULE | DATE | |||
| August 28, 2024 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| FY25 Airfield Striping & Rubber Removal | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT210026/FJXT220012 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | |||||||
| Paint Removal | 5,000 | SF | $0.00 | $0.00 | |||
| Pavement Markings, Reflective (Type I) | 230,645 | SF | $0.00 | $0.00 | |||
| Pavement Markings, Reflective(Type III) | SF | $0.00 | $0.00 | ||||
| Pavement Markings, Non-Reflective | 65,000 | SF | $0.00 | $0.00 | $0.00 | ||
| Rubber Removal | 975,000 | SF | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| (02580/1.4 & 1.5) | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||
| $0.00 | |||||||
| (02680/1.3.1 & 1.4.1) | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| TOTAL LABOR/MATERIALS | $0.00 | $0.00 | $0.00 | ||||
| SUBTOTAL | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| TOTAL | $0.00 |
&"Verdana,Bold"Construction Cost Estimate
File details come from the government source that posted it. Updated .