Attachment 1 - PWS Refuse and Recycling (Amend 0007).pdf
PDF 670 KB Posted
- Attached to
- DAFB Refuse and Recycling
- Solicitation number
- FA449726Q0036
About this file
This is a Performance Work Statement (PWS) for Refuse and Recycling services at Dover Air Force Base, Delaware, effective October 1, 2026 through September 30, 2027.
The contractor shall provide comprehensive waste management services including collection, processing, and disposal of municipal solid waste, food waste, and recyclable materials across the main base and four specialized facilities (Medical, Joint Personnel Exchange Deployment, Training Warrior Combat Focused, and Lodging). Municipal solid waste collection comprises an estimated 870 tons annually from 157 eight-cubic-yard containers plus additional roll-off containers, with pickup frequencies ranging from one to five times weekly based on facility type. Food waste collection from dining facilities requires 100 tons annually, and recyclable materials including cardboard, paper, plastics, glass, aluminum, scrap wood, batteries, and tires total 150 tons annually. Over-and-above services priced separately include unscheduled pickups (40 tons estimated), construction and demolition debris handling (200 tons), additional pickups, and container relocations. All vehicles must be weighed at certified public scales or Delaware Solid Waste Authority facilities, with monthly reporting of tonnage, disposal dates, and tipping fees. The contractor shall empty containers based on historical data for the first 30 days or at minimum weekly, with adjustments subject to government coordination. Collection occurs Monday through Saturday, 7:00 a.m. to 4:30 p.m., through the South Gate/Commercial Vehicle Gate. The contractor must maintain all containers in professional condition matching base architectural standards (Bald Eagle Brown for eight-cubic-yard containers, Eagle Feather Tan for roll-off containers) and maintain a 10-foot cleanup radius around collection points. Performance objectives establish thresholds for defect-free collection (zero defects for exceptional rating), recyclable materials processing aligned with Air Force waste diversion goals and Qualified Recycling Program requirements, proper disposal compliance, equipment maintenance, unscheduled collection response within one business day, and monthly reporting by the fifth working day. Quality assurance employs periodic validations through contractor work schedules with spot-check inspections; unsatisfactory performance triggers corrective action notices and potential contract remedies under FAR 52.212-4. The contractor shall establish an office with an available contract manager accessible within one hour during duty hours, maintain personnel contact information for after-hours emergencies, and provide vehicle passes and identification badges for all employees. Security requirements include FBI background checks for base access, adherence to force protection conditions, prohibition on key duplication, compliance with security training and operational security protocols, and immediate reporting of lost or compromised security items.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PERFORMANCE WORK STATEMENT
REFUSE AND RECYCLING
Dover Air Force Base, Delaware 22 July 2026
Reviewed:
Quality Assurance Program Coordinator Date
Approved:
Contracting Officer Date
PERFORMANCE WORK STATEMENT
REFUSE AND RECYCLING
Dover AFB 22 July 2026
3CUI
1. Description of Services .. 8
1.1 Collection Requirements 8
1.1.1
1.1.1.1 Municipal Solid Waste 8
1.1.1.2 Food Waste 8
1.1.1.3 Recycling . 8
1.1.1.4 Vehicle Weighing
1.1.3 Over and Above Requirements
1.1.3.1 Unscheduled Pickup and Special Events
1.1.3.2 Construction and Demolition Debris (C&D)
1.1.3.3 Additional Pickups ... 9
1.1.3.4 Container Relocations .9
1.1.4 Inclement Weather Schedule
1.1.5 Route Parameters
1.1.6 Points of Collection 10
1.1.8 Government- Approved Containers
1.1.9 Maintaining Containers and Collection Area
1.2 Recyclable Materials Processing
1.2.1 Materials ...10
1.2.2 Pickup Points ...10
1.2.3 Sales Receipts ..10
1.3 Disposal .
4CUI
1.3.1 Off-base Disposal .11
1.3.2 Disposal of Non-marketable Materials ..11
1.4 Equipment Maintenance ..11
1.5 Reports and Records ..11
2. Service Summary ..11
2.1 Quality Control 3
2.2 Quality Assurance ...13
2.3 Performance Assessment ...13
2.3.1 Periodic Validations
2.3.2 Unsatisfactory Performance
2.4 Periodic Progress Meetings 3
2.4.1 Meetings .. 3
2.4.2 Meeting Minutes
3. Government Furnished Property and Services
4. General Information
4.1 Mission
4.1.1 Safety Requirements and Reports
4.1.4 Contracting Officer and Contracting Officer Representative (Quality Assurance
4.1.5 Partnering Agreement . . 14
4.1.6 Damages to Government Buildings, Equipment, or Vegetation . 4
4.2 Hours of Operation
4.3 Holidays & Closures .. 5
5CUI
4.3.1 Other Base Closures
4.4 Performance of Service During Crisis or Heightened Security
4.5 Contractor Work Schedule
4.5.1 Schedule Submission and Approval .. 5
4.5.2 Schedule Changes
4.6 Contract Personnel
4.6.1 Contract Manager .. . 5
4.6.2 Personnel
4.6.3 Employee Restrictions
4.7 Contractor Manpower Reporting 6
4.8 Security Requirements
4.8.1 Base Access .. .16
4.8.2 Key Control
4.8.3 Main Base Access
4.8.4 Security Manager
4.4.1 Security Training .. 7
4.9.4.2 Security Authority
4.9.5 Restricted/Controlled Areas
4.9.5.1 Access Coordination
4.9.5.2 Escorts
4.9.6 Employee Background Checks .. . 7
4.9.6.1 Pre-approval Coordination
4.9.6.2 Badge Issuance
6CUI
4.9.6.3 Access Revocation . ..18
4.9.6.4 Badge Validity . 8
4.9.6.5 Contract Personnel Requirements ..18
4.9.7 Contractor Vehicles .18
4.9.8 For Official Use Only (FOUO) .18
4.9.9 Reporting Requirements .18
4.9.10 Physical Security
5. Awareness Training
5.1 Antiterrorism Awareness Level 1 Training . 19
6. Appendices .. . 20
Appendix A ... 21
Table A1 Estimated Workload Data
Table A2 Tasks & Estimated Frequencies .. 22
Appendix B Maps and/or Site Plans 5
Appendix C- Government Furnished Property/Services/Equipment 5
Appendix D CLINS ... 6
8CUI
1. DESCRIPTION OF SERVICES
The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervisions, and other items and services necessary to perform Refuse and Recycling services at the base. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors and list of Dumpster Locations are in Appendix A.
1.1 COLLECTION REQUIREMENTS
1.1.1 Main Base
1.1.1.1 Municipal Solid Waste
The contractor shall empty refuse containers based on historical data for the first 30 days of performance or at least weekly. The Contractor shall establish initial vehicle routes and collection schedules upon contract award. Details on size, routes, and frequencies shall be submitted to the Contracting Officer (CO) 5 calendar days prior to start of contract performance. The
Representative (COR/Quality Assurance Personnel) and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size routes, or frequencies should be made to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waster container overflow. No changes are allowed to the schedule or haul route with CO or COR coordination. Historical frequency tables are located at Appendix A, Table A2. When the Contractor completes services at a location there shall be no litter, waste, or recyclable material on the ground within a 10 foot radius of the container. The following facilities are assigned to specific CLINs: JPED (Bldg 122), MED (Bldg 300 & 304), TWCF (Bldg. 550A, 550B, 706, 709, 711, 715, 719A, 719B, 721, 726, 760A, 760B, 779, 794, 916, 945 & 1212), Lodging (Bldg 800, 801, 860A & 860B.
1.1.1.2 Food Waste
Empty containers used to dispose of food waste as necessary to maintain a healthy, vector free environment (on days when the facility is in operation). Food waste containers and pickup days are identified in Appendix A, Table A-2.
1.1.1.3 Recycling
The contractor shall empty recycling containers based on historical data for the first 30 days of performance or at least weekly.
The Contractor shall establish initial vehicle routes and collection schedules upon contract award. Container size, routes, and frequencies should be established to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. They are to be submitted to the Contracting Officer (CO) 5 calendar days prior to start of contract performance.
Representative (COR/Quality Assurance Personnel) and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix A, Table A2. When the Contractor completes services at a location there shall be no litter, waste, or recyclable material on the ground within a 10 foot radius of the container.
1.1.1.4 Vehicle Weighing
All vehicles used to collect MSW, C&D, organics and recyclable commodities shall be weight on state-certified public scales/weigh station off base. When use of off base scales are the only option, a predetermined public state-certified scale/weigh station will be identified for use. The COR may be present at the public scale for empty and loaded weighing with no notice to the Contractor. All eight discrepancies will be resolved prior to departing the scale site. The Contractor and COR (if present) shall sign all weight tickets. The Contractor shall submit a monthly report (para 1.5) that includes weigh tickets that reflect the disposed tonnage, disposal date, vehicle type and landfill tipping fee coast. The Contractor shall be reimbursed for tipping fees according to submitted invoices.
Use of Delaware Solid Waste Authority scales/facilities is the preferred method of vehicle weighing.
1.1.3 Over and Above Requirements
9CUI
The following services shall be priced separately in accordance with the cost contained in blocks 19 through 24 on the SF 1449. The contractor shall be compensated IAW the price specified on the SF 1449 for that service. The contractor shall be compensated IAW the unit price when these services are requested.
1.1.3.1 Unscheduled Pickup and Special Events
In addition to the scheduled solid waste collections, the CO or COR may request the contractor make unscheduled collections and disposals. For unscheduled events, the contractor shall respond within one business day of notification from the CO or COR. For special events, the contractor shall also provide (or re-position as directed) solid waste containers. These containers shall be placed in locations for a length of time designated by the CO or COR. The CO shall notify the contractor in writing at least 7 days in advance of the special event date. See Appendix A, Table A-1 for workload data.
1.1.3.2 Construction and Demolition Debris (C&D)
The CO or COR may request the contractor perform C&D container services, to include placement, replacement, or removal.
For C&D container requests, the contractor shall respond within one (1) business day of notification from the CO or COR.
The contractor shall also provide (or re-position as directed) C&D solid waste containers. These containers shall be placed in locations for a length of time designated by the CO or COR.
1.1.3.3 Additional Pickups
In the event unusual conditions cause a container to require pickup before the scheduled time, the CO or COR may request in writing (email/Fax sufficient) pickup within 24 hours and the contractor will be compensated at a unit rate based on the container size.
1.1.3.4 Container Relocations
The Government may request relocation of containers. The request will be made in writing and the container will be relocated within 24 hours.
1.1.4 Inclement Weather Schedule
The contractor shall collect MSW and recyclable material during periods of inclement weather. In cases of severe weather, the CO or COR may authorize exceptions. When exceptions are granted all missed collections shall be performed within 24 hours after the severe weather has terminated, unless the CO authorized additional time.
1.1.5 Route Parameters
The contractor shall propose routes to the base through the South Gate/ Commercial Vehicle Gate to the CO and COR for acceptance. Collection shall be made between the hours of 7:00 a.m. to 4:30 p.m. Monday through Saturday. Collection outside these hours shall require prior coordination of the CO or COR.
1.1.6 Points of Collection
Collection stations for MSW and recyclable materials are shown in Appendix B. The contractor shall position bulk containers for customer ease in depositing MSW. The contractor shall also position containers to minimize interference with adjacent parking areas, sidewalks, roadways, overhead utilities, trees, storm drains, and other potential obstructions.
1.1.7. Cubic Yard Capacity
Proposed capacity of containers is indicated in Appendix A, Table A2. The contactor is encouraged to identify changes to the capacity of containers and/or pickup frequency to improve the overall efficiency of MSW and recycling removal, and to submit the changes to the CO or COR. No changes shall be made until the proposed change is coordinated with the CO or COR.
1.1.8 Government-Approved Containers
Collection of MSW and recyclable materials in all areas shall be from contractor-provided, CO or Cor accepted containers.
Containers shall meet the base architectural/appearance standards.
10CUI
1.1.9 Maintaining Containers and Collection Area
The Contractor shall return all MSW and recycling containers to their original location after servicing, in an upright position with the lids securely in place (closed). The Contractor is responsible for cleaning up any spills, debris, etc., on the ground within 10 feet of the container when servicing a location, The contractor shall collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, cans, tied bundles, or other containers. It is intended that most debris will be placed in containers. The Contractor shall notify the COR of locations where debris is frequently placed outside of containers so the COR may notify facility managers and, if necessary, the Contractor can adjust the container size of pickup frequency with CO or COR approval. The contractor shall also notify the COR if it is discovered that a particular receptable is being utilized for the wrong material.
1.2 RECYCLABLE MATERIALS PROCESSING
The base operates a Qualified Recycling Program (QRP) to reduce the volume of non-hazardous solid waste generated. It is the intent of the base to conduct direct sales of recyclable commodities through a QRP. The contractor shall provide a detailed accounting of recyclable commodities sold (type/weight/price) to the QRP along with 100 percent of the sales proceeds. The contractor shall be aware of the DoD and USAF waste diversion goals and notify the base QRP manager of protentional waste diversion opportunities in the local area. The Air Force waste diversion goals can be found in the most current USAF Strategic Sustainability Performance Plan (SSPP). The USAF SSPP can be found at http://www.safie.hq.mil/esoh.
1.2.1 Materials
The following items shall be recycled: metal beverage containers, glass (clear, brown, green), office paper, newspaper, corrugated cardboard, plastics, scrap wood, batteries, tires. Contractor may recycle materials not listed above with prior coordination of the CO or COR. All recyclable items shall be stored, shipped and disposed of in accordance with federal and local requirements.
1.2.2 Pickup Points
Contractor shall provide recycling containers at the locations specified in Appendix A. Table A2. Containers shall be emptied as specified in section 1.1.1.3.
1.2.3 Sales Receipts
The contractor shall provide a Commodity Sales Summary to the COR, no later than the fifth working day of each month, consisting of commodity type sold, sales proceeds achieved by commodity and weights of commodity sold. Documentation to accompany the Commodity Sales Summary includes commodity sales receipts, commodity sold weigh tickets, and reimbursement check for commodity sales proceeds. The contractor shall also submit an invoice for reimbursement for costs associated with conducing sales transactions, collection, processing commodities, and transporting commodity buyers.
1.3 DISPOSAL
1.3.1 Off-Base Disposal
The contractor shall transport and dispose of all municipal solid waste at a permitted off-base disposal site. A copy of the landfill(s) operating permit that material is transported to shall be provided to the CO. The contractor shall transport recyclable commodities to an off-base material recovery facility. The contractor is responsible for disposal being in accordance with existing local, state, and federal regulations. The contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations and all reimbursements be invoice to associated CLIN with the disposal type.
1.3.2 Disposal of Non-marketable Materials
Any commodity rejected by a predetermined commodity buyer must be reclaimed by the contractor for commodity rework or disposal. Commodity rejection explanation must be provided to the CO or COR within 24 hours of buyer rejection along with remedy of the reject and plans to prevent same future rejections.
1.4 EQUIPMENT MAINATENANCE
The Contractor shall furnish containers that match the architectural/appearance standards of the base. Additional re-painting must match the approved color scheme. The Contractor shall maintain all Contractor and Government provided containers so that they have a professional appearance and ensure they are free of unpleasant odors, dirt, debris, and pests. All containers must remain in good, workable condition, with no leaks. They must remain easily accessible to customers. The Contractor shall perform all cleaning, panting, repair and other maintenance tasks off base. Trucks and trailers used for hauling and collecting shall be free of odor, dirty, debris, and pests. Contractor vehicles and equipment shall not have any waste, or equipment leaks
11CUI
such as oil or hydraulic fluid. Should any contractor vehicles or equipment have any leaks, the contractor is responsible for cleanup.
Current color scheme is Bald Eagle Brown for 8 cu yd containers and Eagle Feather Tan for roll-off containers.
1.5 REPORTS AND RECORDS
The Contractor shall provide a monthly report, by the fifth working day of the month, detailing the previous months total contract costs incurred, cumulative weight tickets for total tonnage of solid waste collected (MSW, C&D, organic, and recycling), tipping fees, weights diverted by recyclable commodity, cost for divert to recyclable commodity, and commodity sales proceeds reimbursed in sufficient detail to support Defense Environmental Programs Management requirements. ALL RECYCLABLE SALES RECEIPTS must accompany the report. Format for these monthly reports shall be coordinated with the CO or COR.
RECORDS MANAGEMENT: The contractor understands that when creating, handling and maintaining records for the Air Force, either electronic or paper, you must meet the requirements established in AFRIMS Records Disposition Schedule (RDS), AFI 33-322, Records Management Program. To meet the requirements established IAW the above-mentioned regulations contact the Base Records Management Office (436 CS/SCXK, Bldg. 310) at (302)677-5157 for guidance and training.
2. SERVICE SUMMARY
The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) Contractor performance, and the expected method of government validation and conformation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions Commercial Items, Inspection/Acceptance, will be sued to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each Performance Objective shall be allowed in ana effort to identify normal phase-in problems.
Performance Objective PWS Para Monthly
Performance Threshold
Remedy Method of
Surveillance
PO-1 Collect Municipal Solid Waste 1.1
Exceptional: 0 Defects Very Good: 1 Defect Satisfactory: 2 Defects Unsatisfactory: 3 or more Defects
Re-performance within 8 hours of notification or an acceptable timeframe approved by the COR
Periodic COR checks
PO - 2 Perform Recyclable Materials Processing IAW QRP and
USAF SSPP
1.2
Exceptional: 0 Defects Unsatisfactory: 1 or more Defects
Re-performance within 8 hours of notification or an acceptable timeframe approved by the COR
Periodic COR checks
PO - 3 Dispose of Municipal Solid Waste IAW the established governing directives 1.3
Exceptional: 0 Defects Unsatisfactory: 1 or more Defects
Re-performance within 8 hours of notification or an acceptable timeframe approved by the COR
Periodic COR checks
12CUI
PO - 4 - Maintain equipment in good workable condition.
Trucks and solid waste containers washed and free of odors. 1.4
Exceptional: 0 Defects Very Good: 1 Defect Satisfactory: 2 Defects Unsatisfactory: 3 or more Defects
Re-performance within 8 hours of notification or an acceptable timeframe approved by the COR
Periodic COR checks
PO - 5 Perform unscheduled collections required by the contracting officer IAW paragraph 1.1
1.1.3.1 Exceptional: 0 Defects Unsatisfactory: 1 or more Defects
Re-performance within 8 hours of notification or an acceptable timeframe approved by the COR
Periodic COR checks
PO - 6
Produce/maintain reports and records by 5th working day of the month
1.5
Exceptional: 0 Defects Unsatisfactory: 1 or more Defects
Re-performance within 8 hours of notification or an acceptable timeframe approved by the COR 100% Inspection
1.2 QUALITY CONTROL
The contractor shall develop and maintain a quality program to ensure refuse and recycling services is performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Summary.
2.2 QUALITY ASSURANCE
The Government requirements set forth in this PWS. The contractor shall provide work schedules to the COR in accordance with paragraph 4.3 of this PWS. The COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting their task of its results to determine whether performance meets the standards contained in this PWS. The COR will use thereof, to record validation results. Results of the validation then become the performance. When a performance threshold has not been met or Contactor performance has not been accomplished, the COR will initiate and provide the COR a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the Contractor. The Contractor shall respond to the CDR IAW instructions provide and return it the CO within 10 calendar days of receipt.
2.3 PERFORMANCE ASSESSMENT
2.3.1 Periodic Validations
This method requires the COR to employ validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
2.3.2 Unsatisfactory Performance
Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a
13CUI
contract period shall constitute an immediate Progress Meeting with the Multi-function Team. All remedies shall be in accordance with the FAR 52.212.-4 (a), Contract Terms and Conditions Commercial Items, Inspection/Acceptance.
2.4 PERIODIC PROGRESS MEETINGS
2.4.1 Meetings
The CO, Functional Commander, COR, QRP Manager and/or Solid Waste Manager, other government personnel as appropriate, and the Contractor shall periodically meet to discuss opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
2.4.2 Meeting Minutes
The minutes of these meetings will be reduced to writing, signed by the CO, and any other signatures as deemed appropriate, distributed to the functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.
3. GOVERNEMNT FURNISHED PROPERTY AND SERVICES
No government furnished property is associated with this contract.
Government furnished service will include:
On base Distribution: Any documentation for the COR or Solid Waste Manager may be sent/brought to the Recycling Center/Scrap Yard, Building 650 Atlantic Street.
Security Police and Fire Protection, The Government will provide general information on base Security Police and Dire Protection service. Security and Emergency services dial 911, for Security Police telephone extension 2100 for emergencies, and 677-6666 for routine calls.
1.3 Recycling Center/Material Recovery Facility RESEREVED
4. GENERAL INFORMATION
4.1 MISSION
The overall Civil Engineer mission at the base is to plan, maintain, operate, and protect the infrastructure. Facilities, and environment for assigned Airmen, families, and civilian employees.
4.1.1 SAFETY REQUIRMENTS AND REPORTS
The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupation disease, or adverse environment impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.
4.1.2 FLIGHT LINE DRIVING:
Anyone driving on behalf of the Contractor will be required to obtain an Airfield Management, which includes attendance at a course lasting approximately 2 hours. Drivers must also Flight- line Driving: Contractors will have to adhere to the provisions in DAFBI 13-202 if operating on the airfield.
4.1.4 CONTRACTING OFFICER AND CONTARCTING OFFICE RESPRESNTATIVE. (QUALITY ASSURANCE
PERSONNEL)
The Contracting Officer will appoint a primary and alternate representative for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contract award.
4.1.6 PARTNERNING AGREEMENT
14CUI
The CO may require a partnering agreement, or multi-functional team, between the Government and Contractor to facilitate cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a Government-Contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principle to share the risk involved in completing the project and to establish and promote a nurturing partnership environment.
Representatives from each organization are encourage to participate in developing a partnering agreement. The partnering agreement that results may be formal or informal. If formal, it should be reduced to writing and signed by the parties involved.
4.1.7 DAMAGES TO GOVERNEMNT BUILDINGS, EQUIPMENT, OR VEGETATION
Damages to government buildings, equipment, or vegetation are addressed in FAR 52.237-2, Protection of Government Building, Equipment, and Vegetation.
4.2 HOURS OF OPERATION
Perform refuse and recycling services during normal duty hours and be available (by phone, pager, cell phone, text message or fax) during the Government -hours response to refuse/recycling problems or emergencies. This excludes federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the Contractor to work at times other than normal duty hours. When the an Air Force mission requirement, advise the CO and reschedule the work to minimize disruption.
4.4 HOLIDAYS & CLOSURES
Recognized Federal Holidays
There may be federal holidays when the Contractor is not required to perform service, except in emergency situations or to support specific mission needs. The holidays are:
1 January Martin Luther King Day 3rd Monday in January
3rd Monday in February Memorial Day Last Monday in May Juneteenth June 19th
Independence Day 4 July Labor Day 1st Monday in September Colombus Day 2nd Monday in October
11 November Thanksgiving Day 4th Thursday in November Christmas Day 25 December If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day after the holiday observance.
4.4.1 Other Base Closures
Work scheduled but not accomplished because of base closure due to exercises or real-world events will be accomplished as soon as possible after base reopening.
4.5 PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY
The services under this contract are not essential for performance during crisis. The CO will determine circumstances which constitute a crisis based on direction from Security Forces and base leadership.
4.6 CONTRACTOR WORK SCHEDULE
4.6.1 Schedule Submission and Approval
The Contractor shall submit a schedule for all services described in this PWS and Appendices to the CO for approval at the post-
15CUI
award conference. The schedule shall include routes, pickup points, times, and days that pickups will occur. The Contractor shall not deviate from the approved schedule without prior approval from the CO or COR. Permanent changes to the schedule must be submitted 10 days before implementation and receive CO approval before the Government will allow the proposed changes. The schedule must be submitted electronically using a file format compatible with Government software.
4.6.2 Schedule Changes
Occurrence-based (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the COR and do not require CO approval.
4.7 CONTRACT PERSONNEL
4.7.1 Contract Manager
The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to meet on the installation within 1 hour with the government personnel designated by the CO to discuss problem areas. The contractor shall provide the CO telephone number(s) where validation results and complaints can be reported. The contractor shall also provide to the CO the names and phone numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur.
The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.
4.7.2 Personnel
Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
4.7.3. Employee Restrictions.
The government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
4.8 CONTRACTOR MANPOWER REPORTING
The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the electronic Contractor Manpower Reporting Application (eCMRA) help desk.
4.9 SECURITY REQUIREMENTS
Contractor employees shall comply with Dover AFB security requirements always imposed by the Installation Commander while on Dover AFB premises. The contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at Dover AFB. The contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination employment for the contractor. The contractor shall comply with all Dover AFB policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized entry to the installation for the purpose of work under this contract only, and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, contractor personnel shall be required to fluently speak, comprehend, read, and write English.
16CUI
4.9.1 Base Access
The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the FBI for base access.
4.9.2 Key Control
The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR or CO any occurrences of lost or duplicated keys.
In the event keys other than master keys are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor.
In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the contractor.
4.9.3 Main Base Access
Current security access restrictions at the South Gate require all contractor vehicles (which are the size of a standard bread delivery truck or larger) to enter through the Commercial Vehicle Gate only. Contractor vehicles may be subject to search prior to gaining base entry. The Contractor should plan and allow for delays because of increased and ever- changing security procedures. The contractor shall obtain contractor identification badges for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto DAFB from 438 SFS Pass and Registration, for the duration of the contract. Vehicle llation.
All vehicles entering the Dover Air Force Main Base, Military Family Housing or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.
During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.
During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
During Higher FPCONs (Charlie and Delta) the base will normally curtail non-essential operations/functions; access by non-essential Contract operations will be suspended as the direction of the Installation Commander.
4.9.4 Security Manager
Upon contract award, the Contractor shall designate, in writing to the CO, a Security Manager who shall be the point of contact for all security matters. Within 5 working days of contract award, the Security Manager shall contact the Civil Engineer Squadron (CES) Security Manager for assistance on accomplishing Contractor personnel security requirements.
4.9.4.1 Security Training
Contractor personnel are required to attend security and OPSEC orientation under Homeland Security Presidential Directive (HSPD) Title 12. The Contractor shall schedule initial and annual refresher training (for all assigned contractor personnel) through the CES Security Manager. All contractor personnel shall be thoroughly briefed by the CES Security Manager on established security requirements and procedures as stipulated in Air Force Policy Directive (AFPD 31-1, Integrated Defense).
4.9.4.2 Security Authority
The Contractor shall brief all employees that they shall immediately leave any area upon notification by the CO, COR, constituted authority, Security Forces, or when directed as occasional operational requirements, real world activities, or emergencies dictate.
4.9.5 Restricted/Controlled Areas
Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services
17CUI
in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area.
4.9.5.1 Access Coordination
The facility manager/user/occupant/requester will be responsible for providing access, escorts, or temporary visitor access badges for contractor personnel while performing ISWM duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.
4.9.5.2 Escorts
At all times while in restricted/controlled areas, contractor employees shall be under direct surveillance of a person from that facility who is cleared to wear a controlled area badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each time the employee completes the duties and leaves the area. This requirement is waived for contractor personnel who have unescorted access privileges and display a controlled area badge for the restricted/controlled areas.
4.9.6 Employee Background Checks
All Contractor employees who do not have a current security investigation acceptable to the Security Forces, and who require a National Agency Check (NAC) for the performance of their duties, shall complete an Electronic Personnel Security Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies (original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. For all employees requiring local area network (LAN) access (if applicable), the Contractor shall submit the following information: full name, date and place of birth, social security account number, affirmation of United States citizenship, and any current security investigation data. Information shall be in writing, on company letterhead, and submitted to Security Forces through the CES Security Manager.
4.9.6.1 Pre-approval Coordination
The CES Security Manager is the source for the necessary forms and will provide instructions for receiving, preparing, and processing these forms. The Contractor shall coordinate with all required facilities to process all necessary paperwork. After forms have been properly completed, the CES Security Manager will make an appointment for contractor employee(s) to go to the Security Forces for submittal of paperwork and fingerprinting. Appointments will be scheduled within two weeks of request.
4.9.6.2 Badge Issuance
A minimum of 180 days is required to process contractor employee NACs. Additional time will be required if the NAC is unfavorable and may result in denial of entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager will notify the Contractor of any NAC results. After completion of a favorable NAC, each eligible employee shall report to the CES Security Manager for processing of AF Form 2586, Unescorted Entry Authorization Certificate. The CES Security Manager will schedule appointments for issuance of badges.
4.9.6.3 Access Revocation
The Dover AFB Installation Commander reserves the right to deny restricted area entry to any contractor NAC is unfavorable, and the right to terminate the entry of any employee upon disclosure of information indicating the continued entry to a secure area is not in the best interest of national security.
4.9.6.4 Badge Validity
Controlled area badges will be valid only for the actual period of employment or the term of the contract, whichever occurs first.
Contractor employees must display the controlled area badge on their outer garment above waist level, and must, upon request, surrender the badge to any DoD member for identification verification. Violations or deviations from established security procedures by contractor employees may result in confiscation of controlled area badges and denial of future entry to restricted areas.
4.9.6.5 Contract Personnel Requirements
18CUI
The Contractor shall not employ persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
4.9.7 Contractor Vehicles
Contractor vehicles must be always maintained in a safe and operational condition while on Dover AFB.
4.9.8 For Official Use Only (FOUO)
The contractor shall comply with DoD 5400-7-R, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.9.9 Reporting Requirements
Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security or well-being of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.
4.9.10 Physical Security
The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
5. AWARENESS TRAINING
5.1 ANTITERRORISM
References:
Department of Defense Instruction O-2000.16, Volume 1 DoD Antiterrorism (AT) Standards, Standard 18
Defense Federal Acquisition Regulation Supplement (DFARS) (Reference (r)) reflects current DoD AT security requirements for defense contractors.
Joint Publication 3-07.2 Antiterrorism
Terrorism is defined as: The calculated use of unlawful violence or threat of unlawful violence to inculcate fear; intended to coerce or to intimidate governments or societies in the pursuit of goals that are generally political, religious, or ideological.
Antiterrorism: As a prelude and during performance of any contract, it is critical that the Contractor be supportive of all Department of Defense (DoD) requirements to protect personnel and their families, installations, facilities, information, and other resources from terrorist acts.
Antiterrorism Awareness Level I Training Contractors or subcontractors possessing a Common Access Card (CAC) will complete AT Awareness Level I training IAW DAFI 31-145, Antiterrorism the MyLearning site. This training site is available through the AF Portal at https://lms-jets.cce.af.mil/moodle/. This site automatically records members completion of training and enables the user to print a certificate if needed by the Unit or Base Training Manager.
Contractors or subcontractors without a CAC or who do not have access to a government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction/services on the installation will complete AT Awareness Level I training
IAW DAFI 31-
(CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf Force Protection Condition (FPCON) Impact on Work Levels: If the DAFB FPCON level is elevated to Charlie, the installation shall evaluate the need for contract services to be discontinued. At FPCON Delta, services are discontinued. Services shall resume when the FPCON level has been lowered.
Administrative Note: In the event of an emergency, dial 9 1 1 from any land line on the installation. The call will be routed to the ECC (302-677-6666). If you use a cell phone and dial 9 1 1, you will be routed to the county 9 1 1 dispatch (Kent County).
Simply inform the dispatcher that you are on DAFB, they will route your call to the DAFB ECC.
19CUI
5.2 OPERATIONAL SECURITY (OPSEC)
Avoid revealing or discussing information/media related to work conducted on/for the installation to any person without a valid need to know and adhere to a 100% shred policy when discarding written/printed materials. Contractors or subcontractors possessing a Common Access Card (CAC) will complete DAF-Operations Security Awareness Training (CBT) course through the MyLearning site. This training site is available through the AF Portal at https://lms-jets.cce.af.mil/moodle/. This site se Training Manager. For contracts that require additional OPSEC measures, elevated security requirements will be conducted utilizing DD Form 254, Department of Defense Contract Security Classification Specification and appropriately annotated IAW DODM5220.22V2_AFMAN 16-1406v2, NATIONAL INDUSTRIAL SECURITY PROGRAM: INDUSTRIAL SECURITY PROCEDURES FOR GOVERNMENT ACTIVITIES. Additionally, if the OPSEC block is checked on the DD Form 254, the 436th Contracting Squadron unit OPSEC coordinators shall: Task the contractor to develop an OPSEC program plan to address how the contractor plans to protect critical and sensitive contracted information, and upon organization acceptance, implement an OPSEC program plan crafted for nature of work and operational concerns.
20CUI
6. APPENDICES
APPENDIX A
TABLE A1 ESTIMATED WORKLOAD DATA
TTEM / CLIN REF NAME ANNUAL ESTIMATED QUANTITY
X001 Municipal Solid Waste Collection - Base (PWS 1.1.1.1) 870 Tons
X002 Food Waste Collection - Base (PWS 1.1.1.2) 100 Tons
X003 Recyclable Collection - Base (PWS 1.1.1.3) Cardboard/Paper 8CY
150 Tons
X005
40 Tons
300 Tons
Container Relocations (PWS 1.1.3.7) 2 Each
EquipmentMaintenance 170 Each
X009 Provide Tire Enclosed Container 1- 20 CY 1 Each
X010 Collect/Dispose of Tire Container 8 Tons
Collect/Dispose Refuse Base (30CY) 240 Tons
X012 Municipal Solid Waste Collection MED (2-8 CY Containers) 18 Tons
X013 Maintenance/Clean Bulk Containers MED 2 Each
X014 Municipal Solid Waste Collection JPED (1-8 CY Container)
7 Tons
X015 Maintenance/ Clean Bulk Containers JPED 1 Each
X016 Municipal Solid Waste Collection TWCF (17-8 CY Containers)
175 Tons
X017 Maintenance/ Clean Bulk Containers TWCF 17 Each
X018 Municipal Solid Waste Collection Lodging (4-8 CY Container)
30 Tons
X019 Maintenance/ Clean Bulk Containers Lodging 4 Each
X006 Additional Pickups (PWS 1.1.3.6.) Recycling 30 CY
X007
X008
X011
X004 Unscheduled Items Pick- up and Special Events (8 CY Containers) (PWS 1 .1 .3 .1 ) Construction and Demolition Debris Placement / Pickup (PWS 1.1.3.2) (3 0 CY Containers) 200 Tons
21CUI
TAB LE A2 - TASKS & ESTIMATED FREQUENCIES
ITEM NAME ESTIMATED CONTAINERS
1 Maintain, clean, and paint containers for Dover Main Base, sites and ranges 170 Each 2 Provide service to 8 Cu Yd containers 157 Each 3 Provide service to 30 Cu Yd roll-off containers 10 Each 4 Provide service to 20 Cu Yd roll-off container 1 Each 5 Provide service to 20 Cu Yd tire roll-off container 1 Each 6 Provide service to 2 Cu Yd container 1 Each
MSW Container Location/Schedule R = Refuse Containers G = Food & Garbage Containers
Facility # Size (CY) Type Mon Tue Wed Thu Fri Sat Dumps/Week 105 8 R X 1 115A 8 R X 1 115B 8 R X 1
116A 8 R X 1
116B 8 R X 1 122 8 R X 1
140/150 8 G & R X X X X X 5
203 8 R X 1
205 8 R X X 2
206 8 R X X 2
211 8 R X 1
212 8 G & R X X X X X 5
222 8 G & R X X X X X 5
261 8 R X 1 264 8 R X 1 266A 8 G & R X X X X X 5 266B 8 R X 1 268A 8 G & R X X X X X 5 268B 8 G & R X X X X X 5
268C 8 G & R X X X X X 5
270A 8 R X 1 270B 8 R X 1
300 8 R X X 2
304 8 R X 1 310 8 R X 1 401/2 8 R X X X 3 403A 8 G X X X X X 5 403B 8 G X X X X X 5 414 8 G X X X 3
JPED
MED
MED
22CUI
417 8 R X 1 420/423 8 G & R X X X X X 5 421 8 R X X X 3 430 8 R X X X 3 435 8 R X X X 3 445 8 R X X X 3 475 8 R X 1 476 8 R X 1 479A 8 G & R X X X X X 5 479B 8 G & R X X X X X 5 501 8 R X X 2 502 8 R X 1 503A 8 R X X 2 503B 8 R X X 2 508 8 R X X 2 520/524 8 R X 1 550A 8 R X X 2 550B 8 R X X 2 600 8 R X 1 607A 8 R X 1 607B 8 R X 1 615 8 R X 1 635 8 R X 1 639A 8 R X X 2
639B 8 R X 1 639C 8 R X 1 639D 8 R X 1 639E 8 R X 1 639 30 R X 1 650 30 R X 1 650 8 R X 1 706 8 R X 1 709 8 R X 1 711 8 R X 1 715 8 R X 1 719A 8 R X X 2 719B 8 R X X 2 721 8 R X X 2 726 8 R X X 2 760A 8 R X X 2 760B 8 R X X 2 779 8 R X X 2 780 8 R X 1 781 8 R X 1 794 8 R X X 2 800 8 R X X 2 801 8 R X X 2
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
TWCF
23CUI
810 8 G & R X X X X X 5 845 8 R X 1 860A 8 R X X 2 860B 8 R X 1 910 8 R X 1 916 8 R X 1 918 8 R X 1 921/922 8 R X 1 945 8 R X 1 1212 8 R X 1 1270 8 R X 1 1301 8 R X 1 1306 8 R X 1 1320 8 R X 1 1344 8 R X 1 1350 8 R X 1
Fam Camp
8 R X 1
1402 8 R X 1 1403 8 R X 1 1501 2 R X 0.5 2998 8 R X 1
Recycling Container Location/Schedule C = Cardboard P = Paper M = Mixed Plastics/Glass/Aluminum Cans W = Wood
Facility # Size (CY) Type Mon Tue Wed Thu Fri Sat Dumps/Week 115A 8 C X 1 115B 8 P X 0.25 122 8 C X 1 140 8 C X 1 200 8 P X 0.25
206 8 C X 1
212 8 C X 1 222 8 C X 1 261A 8 C X 1 261B 8 P X 0.25
266 8 C X 1
270A 8 C X 1
270B 8 P X 0.25
300A 8 C X 1 300B 8 P X 0.25
304 8 C X 1
TWCF
24CUI
310 8 C X 1
403 8 C X 1
421 8 C X 1
423 8 C X 1
442 8 C X 1
476 8 C X 1
501A 8 C X 1
501B 8 P X 0.25
502 8 C X 1
503 8 C X 1
515 8 C X 1
520A 8 C X 1
520B 8 P X 0.25
550A 8 C X 1
550B 8 P X 0.25
550C 30 C As Needed
550D 30 W As Needed
550E 30 W As Needed
600A 8 C X 1
600B 8 P X 0.25
608 8 C X 1
630 8 C X 1
632 8 C X 1
639A 8 C X 1
639B 8 C 1
639C 8 C 1
639D 8 P X 0.25
639E 30 W As Needed
650A 8 C X 1
650B 8 P X 0.25
650C 30 W As Needed
650D 30 M As Needed
712 8 C X 1 715 8 C X 1 721 8 C X 1 725A 8 C X 1 725B 8 P X 0.25 727 8 C X 1 760A 8 C X 1 760B 8 P X 0.25 778 8 C X 1 781 8 C X 1 800 8 C X 1 801 8 C X 1 810 8 C X 1 845 8 C X 1
25CUI
862 8 C X 1 910 8 C X 1 916 8 C X 1 922 8 C X 1 1212A 30 W As Needed 1212B 30 W As Needed 1270 8 C X 1 1301 8 C X 1 1350 8 C X 1 1403 8 C X 1
APPENDIX B - MAPS AND/OR SITE PLANS
Maps will be provided to contactor showing all station locations for containers and where they are in relation to each other. Refer to the attached Dumpster Location document station locations.
MAIN BASE
CENTRALIZED BULK COLLECTION
POINT RECYCLING CENTER
Other Pertinent Government Office
CIVIL ENGINEERING BLDG 600
COR OFFICE 650
CONTRACTING BLDG 639
PASS AND ID BLDG 331
APPENDIX C GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT
No government furnished property/equipment
26CUI
APPENDIX D - CLINS
CONTRACT
LINE ITEM NO.
(CLIN)
SUPPLIES/SERVICE QTY UNIT UNIT PRICE AMOUNT
NON-PERSONAL SERVIES:
Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Refuse and Recycling services at Dover AFB for the period 1 Oct 26 31 Sep 27in accordance with the Performance-based Work Statement (PWS) dated: 1 October 26. This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINS (0001-0018).
0001 Municipal Solid Waste Collection - Base
(PWS 1.1.1.1)
12 MO
0002 Food Waste Collection…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .