5. Bid Schedule Repair Purple Heart Pavement.xlsx

XLSX spreadsheet 546 KB Posted

Attached to
Repair Purple Heart Drive Pavement - Dover AFB
Solicitation number
FA449725R0001
Issued by

About this file

This is a bid schedule spreadsheet template for contractors to provide cost estimates for repairing Purple Heart Drive pavement at Dover Air Force Base. The spreadsheet contains 50 division tabs following the Construction Specifications Institute (CSI) format, with Division 32 (Exterior Improvements) detailing the key scope items including: 25,437 square yards of pavement milling, 2,896 linear feet of sawcutting, 400 cubic yards of excavation, 100 cubic yards of GABC base course, 280 tons of PG 76-22 "B" mix bituminous concrete, 1,415 tons of PG 76-22 "C" mix bituminous concrete, and 2,022 linear feet of pavement markings.

The template allows contractors to input labor and material costs for each division, with automatic calculation of overhead, profit, bonds, and area cost factors specific to Dover AFB (11% sustainment ACF, 13% repair ACF). The spreadsheet includes tabs for general requirements, earthwork, utilities and other divisions, though the pavement work appears to be the primary scope. The template is dated March 7, 2024 and references project number FJXT 210039 for the 436th Civil Engineering Squadron.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Summary

BID SCHEDULEDate:
7-Mar-24
COMPANY
436th Civil Engineering
PROJECT
Repair Purple Heart Pavement
LOCATIONPROJECT NO.FJXT 210039
DOVER AIR FORCE BASE, DE
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTSERROR:#DIV/0!- 0
DIVISION 02EXISTING CONDITIONSERROR:#DIV/0!- 0
DIVISION 03CONCRETE WORKERROR:#DIV/0!- 0FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

DIVISION 04MASONRYERROR:#DIV/0!- 0
DIVISION 05METALSERROR:#DIV/0!- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITESERROR:#DIV/0!- 0GC Overhead
DIVISION 07THERMAL AND MOISTURE PROTECTIONERROR:#DIV/0!- 0GC Profit
DIVISION 08OPENINGSERROR:#DIV/0!- 0
DIVISION 09FINISHESERROR:#DIV/0!- 0
DIVISION 10SPECIALTIESERROR:#DIV/0!- 0
DIVISION 11EQUIPMENTERROR:#DIV/0!- 0Risk/Bonding
DIVISION 12FURNISHINGSERROR:#DIV/0!- 0Design
DIVISION 13SPECIAL CONSTRUCTIONERROR:#DIV/0!- 0This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 15RESERVEDERROR:#DIV/0!- 0
DIVISION 16RESERVEDERROR:#DIV/0!- 0
DIVISION 20RESERVEDERROR:#DIV/0!- 0
DIVISION 21FIRE SUPRESSIONERROR:#DIV/0!- 0
DIVISION 22PLUMBINGERROR:#DIV/0!- 02
DIVISION 23HEATING, VENTILATING AND A/CERROR:#DIV/0!- 02
DIVISION 24RESERVEDERROR:#DIV/0!- 0
DIVISION 25INTEGRATED AUTOMATIONERROR:#DIV/0!- 00
DIVISION 26ELECTRICALERROR:#DIV/0!- 0
DIVISION 27COMMUNICATIONSERROR:#DIV/0!- 0Select Area Cost Factor Type:
DIVISION 28ELECTRONIC SAFETY AND SECURITYERROR:#DIV/0!- 0
DIVISION 29RESERVEDERROR:#DIV/0!- 0
DIVISION 30RESERVEDERROR:#DIV/0!- 0
DIVISION 31EARTHWORKERROR:#DIV/0!- 0
DIVISION 32EXTERIOR IMPROVEMENTSERROR:#DIV/0!- 0
DIVISION 33UTILITIESERROR:#DIV/0!- 0
DIVISION 34TRANSPORTATIONERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
DIVISION 36RESERVEDERROR:#DIV/0!- 0
DIVISION 37RESERVEDERROR:#DIV/0!- 0
DIVISION 38RESERVEDERROR:#DIV/0!- 0
DIVISION 39RESERVEDERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
DIVISION 46RESERVEDERROR:#DIV/0!- 0
DIVISION 47RESERVEDERROR:#DIV/0!- 0
ERROR:#DIV/0!- 0
DIVISION 49RESERVEDERROR:#DIV/0!- 0

HARD COST TOTAL ERROR:#DIV/0! - 0

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%- 0
SUBTOTAL- 0
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)0%- 0
SUBTOTAL- 0
0.00%- 0
SUBTOTAL- 0
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)- 0
CONTRACT TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Sustainment Repair/Const ACF Already Factored

UFC 3-701-01

Table 4-4: Operation and Maintenance Escalation Rates

Budget GuidanceProjected
FYAnnual Escalation RateEnd of Fiscal YearEscalation Factor
(Note 1)(Note 2)
20191.0000
20202.00%20201.0200
20212.00%20211.0404
20222.00%20221.0612
20232.00%20231.0824
20242.00%20241.1041
20262.00%20251.1262
Note 1: Annual Inflation Guidance rates for military construction budget authority published by USD (Comptroller) on 16 December 2019.
Note 2: Use these factors to adjust plant replacement value to the target year.
AREA COST FACTORSUSTAINMENT ACF
DOVER AFB SITE #111%13%

Div1

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABOREQUIPMENT
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
Site Superintendent60HR- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div2

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
LS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div3

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div4

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div5

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div6

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div7

BID SCHEDULEDATE
INDEPENDENT GOVERNMENT ESTIMATE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div8

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div9

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div10

INDEPENDENT GOVERNMENT ESTIMATEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div11

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div12

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div13

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div14

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div15

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div16

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div20

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div21

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div22

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div23

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div24

BID SCHEDULEDATE
BID SCHEDULE
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div25

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div26

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div27

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div28

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div29

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div30

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div31

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

INDEPENDENT GOVERNMENT ESTIMATEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 240004
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
Pavement Milling25437SY-IN- 0- 0- 0
Sawcutting2896LF-IN- 0- 0- 0
Excavation400CY- 0- 0
GABC100CY- 0- 0- 0
Hot Biituminous Concrete PG 76-22 "B"280Tons- 0- 0- 0
Hot Biituminous Concrete PG 76-22 "C"1415Tons- 0- 0- 0
Pavement Markings2022LF-IN- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div33

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div34

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div35

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
RESERVED$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div36

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div37

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div38

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div39

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div40

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div41

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div42

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div43

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div44

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div45

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
0.00%- 0
FY Escalation Rate0.00%- 0
Dover Area Cost Factor0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div46

BID SCHEDULEDATE
March 7, 2024
PROJECTBASIS FOR ESTIMATE
Repair Purple Heart PavementCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210039
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL

This is the start of the file's text. The full file is on GovTribe.