The document is a Q&A for the Pipe Video Inspection contract opportunity, Solicitation Number FA449724R0006, issued by the Department of the Air Force Air Mobility Command. The contract requires the contractor to provide all labor, materials, tools, and equipment necessary for storm drain cleaning and TV inspection of approximately 35,000 LF of storm water pipes beneath or near airfield pavements at Dover AFB. The Q&A addresses questions about the longest linear footage span of piping between access points, which is approximately 1,000 feet for a 60-inch line. The contract appears to be focused on inspecting the storm water pipe system for potential defects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
| Untitled |
| Untitled |
Solicitation Questions & Answers 18 April 2019 Page of Summary of Site Visit (if applicable) Question Answer 9.0.0.2.20120627.2.874785
| Security_Markings: |
| CurrentPage: |
| PageCount: |
| Program-Title: Pipe Video Inspection |
| Contracting-Office: 436 CONS/PKAB |
| Contracting-Office: FA449724R0006 |
| Basic_Quantity: Pipe Video Inspection |
| TextField1: |
| Add: |
| Cell1: 1. Are any bonds required? Bid bond, payment & performance? If so please advise percentages/amounts. |
| Cell1: 2. Will any retainage be held during the project? |
| Cell1: 3. Will there be any liquidated damages associated with this project? |
| Cell1: 4. Is this project advertised for small business only or can anyone participate in this project? |
| Cell1: 5. Will you provide the work hours? |
| Cell1: 6. Is there an engineers estimate? |
| Cell1: 7. Please confirm the contractor is allowed to release filtered water removed during the pipe vacuuming process (known as “decant water”) into the sanitary or storm system. |
| Cell1: 8. If the decant water is to be released to the sanitary system, please confirm the sanitary sewer operator has granted permission |
| Cell1: 9. If the decant water is to be released to the storm system, please provide a copy of the MS4 permit. |
| Cell1: 10. Can the water introduced for pipe jetting, remain in the storm system? |
| Cell1: 11. Will 80,000lb trucks be allowed on the grass leading to outfalls? If so, will restoration be the responsibility of the Air Force? |
| Cell1: 12. Can trucks be left on the airfield grass area overnight? |
| Cell1: 13. Are there any precautions required when cleaning outfall pipes? |
| Cell1: 14. Will the Air Force pump down water retention ponds to allow for pipe inspection? |
| Cell1: 15. Will the outfall areas be cleared to allow truck access? |
| Cell1: 16. Where is the water fill location? |
| Cell1: 17. Will the contractor be allowed to work during flight/taxi activities? |
| Cell1: 18. Can the bid tabs for pipe cleaning be separated into light cleaning by the foot (3 passes with a jet-hose) and heavy cleaning by the hour? |
| Cell1: 19. Can a bid item for truck matting be added? |
| Cell1: 20. Can a bid item for downtime caused by activities out of the contractor’s control be added? |
| Cell1: 21. Is the debris in the pipes considered hazardous? Will testing be required? |
| Cell1: 22. Will DAFB provide a lay down area so that equipment can be stored on-site for the duration of the project? |
| Cell1: 23. Will DAFB allow for matting to be utilized for access? |
| Cell1: 24. Do the access areas that need to be cleared and/or created have to be restored to original condition? |
| Cell1: 25. Is there a Bid specification or are the bidders to bid only from the map provided during the site walk? |
| Cell1: 26. Is water available on site for use in the cleaning activity? |
| Cell1: 27. Is there a location on site for disposal of debris from the cleaning activity? |
| Cell1: 28. Will the workers be required to sign in each day with credentials or will they receive a “job pass” for the duration? |
| Cell1: 29. Will DAFB consider an alternate bid response to allow for pricing to be provided based upon pipe diameter? Presently, the bid response form only allows for one unit rate to cover all sizes. |
| Cell1: 30. Will DAFB consider additional line items to provide differential rates for normal cleaning and heavy cleaning? Can DAFB provide a definition for heavy cleaning and allow for this to be priced on an hourly rate basis? |
| Cell1: 31. Should a separate heavy cleaning rate be acceptable, will DAFB allow for heavy cleaning to be defined as cleaning that cannot be accomplished within 8 passes (suggested) utilizing a standard jet nozzle approach? |
| Cell1: 32. When will the bidders receive answers to the questions provided? If not until just prior to the scheduled bid date, will DAFB consider extending the deadline to allow for addition bid preparation time? |
| Cell1: 33. Are we able to move standing water from the drainage systems and retention ponds? What is the protocol or acceptable methods of removing/moving the water from the retention areas for the VPI data collection? |
| Cell1: 34. Are we responsible for clearing/excavating the foliage and terrain prior to VPI at the retention pond and overgrown areas? |
| Cell1: 35. Does the air traffic suspend work, or what is the protocol/restrictions for working on/near the runways? |
| Cell1: 36. Do we need SWAC or other credentials? |
| Cell1: 37. Do we need to take Airfield Management Training? |
| Cell1: 38. Any limitations to setting up matting, or other supplies to stage the equipment and trucks? |
| Cell1: 39. Are we responsible for jetting/cleaning the lines prior to VPI? |
| Cell1: 40. Are we able to operate with two (2) crews at once working independently? (A jetting crew and a VPI crew?) |
| Cell1: 41. Are there water hookup points on-site for potential jetting or do we need a water tanker truck? Are there any restrictions to where will the truck able to be parked? |
| Cell1: 42. What is the longest linear footage span of piping between the access points? (manholes/clean out /storm drains) |
| Cell3: No, bonds are not required. |
| Cell3: No |
| Cell3: Liquidated damages will not be associated with this requirement. |
| Cell3: Small business only |
| Cell3: Normal work hours are 7:30 A.M. and 4:30 P.M. daily, Monday through Friday, excluding federal legal holidays. These can be modified with contracting approval to enhance airfield accessibility and during minimized airfield operations. |
| Cell3: No |
| Cell3: Yes, filtered water is allowed to be release into the storm system. |
| Cell3: NA because water is not being put into the sanitary system. |
| Cell3: NA |
| Cell3: Yes |
| Cell3: From an Airfield perspective, yes 80,000 lbs are allowed on the grass leading to the outfalls. Matting should be utilized. Restoration should be the responsibility of the contractor. |
| Cell3: Contractors will be provided a lay down area for the vehicles. Trucks will not be authorized to remain on the airfield at night. |
| Cell3: All safety precautions should be taken that involves this type of work. |
| Cell3: No, but contractor can pump water down stream if present for pipe access. |
| Cell3: No |
| Cell3: B945 has a fill station for this purpose. |
| Cell3: Depending on the location, the contractor will be authorized to work during flight operations. When the contractor's work is within 200' of the Runway the aircraft movement area will need to be closed. Airfield Management will require 5 business day for notification of this work. |
| Cell3: We are assuming heavy cleaning for all piping. Bid appropriately. |
| Cell3: Include matting as part of heavy cleaning CLIN. |
| Cell3: No. Any unforeseen downtime will be handled at the Contracting Officer's discretion. |
| Cell3: No. Removed material will be stored on base near the lay down site. |
| Cell3: A lay down area will be provided |
| Cell3: Matting is authorized for use on the airfield grass areas |
| Cell3: Yes |
| Cell3: Map provides all piping that is to be cleaned and video surveyed. |
| Cell3: There is no water available on site. |
| Cell3: The site for disposal of debris is located near the lay down area. |
| Cell3: The contractor will require to complete airfield drivers training prior to project start and will require daily check in/out with Airfield management |
| Cell3: Bid proposals should encompass all sizes of pipe and pipe length. |
| Cell3: No. Assuming heavy cleaning for all pipes. |
| Cell3: Assume heavy cleaning for all pipes. |
| Cell3: The deadline can be extended at the discretion of the Contracting Officer. |
| Cell3: Yes. Can pump water down stream if present for pipe access. |
| Cell3: Yes, as necessary. |
| Cell3: Airfield Management will require 5 business day notification of any work within 200' of the runway. |
| Cell3: No Storm Water Credentials required. |
| Cell3: Yes, Airfield Driver's training is required. The class lasts about 1 hour |
| Cell3: Matting can be set up for equipment and trucks, but keep in mind that no vehicles can be left on the airfield after work is completed for the day. |
| Cell3: If the lines have debris, they will require cleaning prior to Video. |
| Cell3: Ideally yes, but will require 2 escorts. To be determined. |
| Cell3: You will need a water truck. There are no hookup points on the airfield. There are no restrictions on where the truck can be parked, if the airfield is closed in the work vicinity. |
| Cell3: It appears that a 60" line that is approx. 1,000 ft long. |
| Date: 07 May 2024 |
| Name: |
| Signature: |
| TextFieldStyle1: |
| TextFieldStyle2: |
| TextFieldStyle3: |
| TextFieldStyle4: |
| TextFieldStyle5: |
| TextFieldStyle6: |
| TextFieldStyle7: |
| TextFieldStyle8: |
| TextFieldStyle9: |
| TextFieldStyle10: |
| TextFieldStyle11: |
| TextFieldStyle12: |
| TextFieldStyle13: |
| TextFieldStyle14: |
| TextFieldStyle15: |
| TextFieldStyle16: |
| TextFieldStyle17: |
| TextFieldStyle18: |
| TextFieldStyle19: |
| TextFieldStyle20: |
| TextFieldStyle21: |
| TextFieldStyle22: |
| TextFieldStyle23: |
| TextFieldStyle24: |
| TextFieldStyle25: |
| TextFieldStyle26: |
| TextFieldStyle27: |
| TextFieldStyle28: |
| TextFieldStyle29: |
| TextFieldStyle30: |
File details come from the government source that posted it. Updated .