Attachment 6 - VMS Phase Plan.pdf
PDF 512 KB Posted
- Attached to
- Dover AFB - Video Management System Amendment 1 Federal contract opportunity
- Solicitation number
- FA449724Q0041_Amendment_1
About this file
This document appears to be an attachment to a federal contract opportunity, specifically Amendment 1 to Solicitation Number FA449724Q0041 for a Video Management System (VMS) at Dover AFB. The attachment provides a Phase Plan detailing the equipment, camera channels, and maintenance required for various phases of the project, such as the Main & Housing Gates, North Gate, CVI Gate, and Key Intersections. The Phase Plan is projected to be executed over the base year and four option years. The related federal contract opportunity is for the contractor to provide all labor, personnel, tools, parts, supervision, and items necessary to inspect, repair and install the VMS with an approved authority to operate on the Air Force Network, as defined in the Performance Work Statement (PWS). All equipment must be maintained by the contractor in accordance with manufacturer specifications, and the contractor will ensure all drawings, diagrams, as-builts and documentation are provided to the Security Forces representative.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Part Qty Server - NVR5-PRM-FIPS-96TB-NA 1 Operator Station - RM7-WKS-2MN-NA 1 Monitor 1 Camera - 24C-H5A-3MH 4 Camera - 8.0C-H6SL-DO1-IR 3 Camera - 5.0C-H6SL-BO2-IR 4 Camera Channel 11 Maintenance Mounts/Equipment Labor/Materials
Part Qty Camera - 24C-H5A-3MH 1 Camera - 8.0C-H6SL-DO1-IR 3 Camera - 5.0C-H6SL-BO2-IR 2 Operator Station - RM7-WKS-2MN-NA 1 Monitor 1 Camera Channel 6 Maintenance Mounts/Equipment Labor/Materials
Part Qty Server -NVR5-PRM-FIPS-96TB-NA 1 Camera - 24C-H5A-3MH 1 Camera - 8.0C-H6SL-DO1-IR 3 Camera - 5.0C-H6SL-BO2-IR 3 Camera Channel 7 Maintenance Mounts/Equipment Labor/Materials
Part Qty Camera - 24C-H5A-3MH 3 Camera - 8.0C-H6SL-DO1-IR 2 Camera - 5.0C-H6SL-BO2-IR 2 Camera Channel 7 Maintenance Mounts/Equipment Labor/Materials
Part Qty Camera - 24C-H5A-3MH 1 Camera - 8.0C-H6SL-DO1-IR 1 Camera Channel 2 Maintenance Mounts/Equipment Labor/Materials
PHASE PLAN
Phase 5: Gate 5
Phase 1: Main & Housing Gates
Phase 2: North Gate
Phase 3: CVI Gate
Phase 4: Key Intersections
Below is the projected execution for the Phase Plan; however, the phases can be exercised at any given time as long as the Government issues the preliminary notice in accordance with the terms and conditions of the contract.
Phase 1: Base Year | Phase 2: Option Year 1 | Phase 3: Option Year 2 | Phase 4: Option Year 3 | Phase 5: Option Year 4