Technical_Evaluation_Factors.pdf
PDF 143 KB Posted
- Attached to
- Repair Hangar Doors at Bldg 714 Federal contract opportunity
- Solicitation number
- FA449718R0017
About this file
Technical Evaluation Factors
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA449718R00170003_Amendment.pdf | ||
| Q&A_for_Hangar_Doors.pdf | ||
| FA449718R00170002_Amendment.pdf | ||
| Specifications_for_Hangar_Doors_Bldg_714.pdf | ||
| Questions_and_Answers_For_Hangar_Doors_Bldg_714.pdf | ||
| FA449718R00170001_Amendment.pdf | ||
| Bid_Schedule.pdf | ||
| FA449718R0017.pdf | ||
| Wage_Determination.pdf | ||
| SOW_for_Repair_Hangar_714_(17_July_2018).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION FACTORS
Repair Hangar Doors Bldg 714
PROJECT 1059113
1 March 2018
BASIS FOR CONTRACT AWARD:
1. This is a competitive selection in which competing offerors will be evaluated on Lowest
Price Technically Acceptable (LPTA).
The Government expects to award one firm-fixed price contract as a result of this solicitation.
The US Government will make an award to the responsible (IAW the Federal Acquisition
Regulation [FAR]) contractor whose offer conforms to the solicitation and are determined to be the most advantageous to the Government considering price and non-price factors. The solicitation requirements include all stated terms, conditions, representations, certifications, and other information required by 52.212-1 of this solicitation.
PRICE: The Government will evaluate offers based on price using the Lowest Price Technically
Acceptable method. The lowest proposal will be considered and reviewed for technical acceptability. If the proposal is not technically acceptable, the next lowest proposal will be reviewed for technical acceptability until the Government has determined a proposal to be technically acceptable.
TECHNICAL CAPABILITY: The following technical capability will be evaluated on an acceptable/unacceptable basis. If all of the following technical capabilities are not submitted with the quote, the quote shall not be considered and shall be removed from consideration.
The contractor at a minimum shall meet the following requirements mentioned below IAW the
SOW:
1. Work Plan: Does the offeror provide a basic work plan which demonstrates a realistic approach to the accomplishment of the work, including 1) time line identifying critical path for project construction within the contract performance period, 2) performance statement identifying their plan of action and scope understanding.
2. Initial Design: Does the offeror provide shop drawings of the design at building 714 for the hangar railings as described in the SOW?
3. Past Projects of Similar Scope: Does the offeror provide satisfactory evidence of at least 2 past projects in the past 3 years from the date of this solicitation of similar magnitude and scope which demonstrates relevant experience?
The following ratings will be used in rating technical capability:
Acceptable: Proposed meets the minimum requirements of the solicitation
Unacceptable: Proposed does not meet the minimum requirements of the solicitation
File details come from the government source that posted it.