Amendment 002 Epoxy Floor Coating.pdf
PDF 38 KB Posted
- Attached to
- Epoxy Floor IDC
- Solicitation number
- FA4497-11-R-0010
About this file
Amendment 0002 Epoxy Floor Coating
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1Q3FQ1175A001 111164
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Section J, Attachment 1 - Update Wage Rates
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4497-11-R-0010
X 9B. DATED (SEE ITEM 11)
29-Jul-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2011
CODE
436 CONTRACTING SQUADRON
BLDG 639 ATLANTIC ST
DOVER AFB DE 19902-5639
FA4497 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4497-11-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT DESCRIPTION PAGES DATE
Attachment 1 Rates of Wages 4 0 22 JUL 2011 Attachment 2 Operational Climatic Data Summary 3 0 5 SEP 1997 Attachment 3 Mean Days Precipitation Trace to .5 Inches 1 30 JUN 2003 Attachment 4 Material Approval Submittals 1 030 JUN 2011 Attachment 5 Sample Questionnaire Cover Letter 1 230 JUN 2011 Attachment 6 Past and Present Performance Questionnaire 3 30JUN 2011 Attachment 7 Performance Requirements 1 30 JUN 2011
To:
Exhibit/Attachment Table of Contents
DOCUMENT DESCRIPTION PAGES DATE
Attachment 1 Rates of Wages 4 2 12 AUG 2011 Attachment 2 Operational Climatic Data Summary 3 0 5 SEP 1997 Attachment 3 Mean Days Precipitation Trace to .5 Inches 1 30 JUN 2003 Attachment 4 Material Approval Submittals 1 0 30 JUN 2011 Attachment 5 Sample Questionnaire Cover Letter 1 2 25 JUL 2011 Attachment 6 Past and Present Performance Questionnaire 3 30JUN 2011 Attachment 7 Performance Requirements 1 30 JUN 2011
(End of Summary of Changes)
SOLICITATION NO.FA4497-11-R-0010
CONTRACT NO.
Attachment 1
RATES OF WAGES
General Decision Number: DE100005 08/12/2011 DE5 Superseded General Decision Number: DE20080005 State: Delaware Construction Type: Building County: Kent County in Delaware
Modification Number Publication Date 0 03/12/2010 1 06/11/2010 2 07/09/2010 3 08/13/2010 4 09/24/2010 5 12/31/2010 6 04/08/2011 7 07/01/2011 8 07/22/2011 9 08/12/2011
ASBE0042-001 07/14/2009
Rates Fringes Asbestos Worker/Heat and Frost Insulator.............................................................. $ 29.57 18.76
BRDE0001-002 05/01/2011
Rates Fringes TILE FINISHER..................................................................................................... $ 21.37 14.40 TILE SETTER......................................................................................................... $ 27.69 17.03
BRDE0001-003 05/01/2011
Rates Fringes BRICKLAYER........................................................................................................ $ 28.00 17.03
CARP0454-005 07/01/2009
Rates Fringes PILEDRIVERMAN................................................................................................ $ 25.30 9.86+A FOOTNOTE: A. PAID HOLIDAYS: Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (provided the employee works the day before the holiday and the day after the holiday).
CARP0626-001 05/01/2010
Rates Fringes
CARPENTER
Including Acoustical Ceiling Install, and Drywall Hanging.............................. $ 29.82 18.04 Scaffold............................................................................................................... $ 29.57 15.09
CARP1545-001 05/01/2007
Rates Fringes MILLWRIGHT....................................................................................................... $ 31.07 22.13
CARP1823-006 05/01/2010
Rates Fringes Soft Floor Layers, Carpet and Vinyl....................................................................... $ 20.75 17.19
Attachment
ELEC0313-001 06/01/2011
Rates Fringes ELECTRICIAN....................................................................................................... $ 35.00 23.70
ENGI0542-018 06/01/2010
Rates Fringes Operating Engineers:
Backhoes, Bulldozers, Cranes, Graders, Loaders, and Scrapers........................ $ 34.54 21.27+A Roller.................................................................................................................. $ 32.36 20.62+A FOOTNOTE: A. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day (provided the employee works the scheduled work day following the holiday)
IRON0451-001 07/01/2009
Rates Fringes
IRONWORKER
Ornamental, Reinforcing Rigger and Structural................................................. $ 31.60 23.90
LABO0199-001 05/01/2009
Rates Fringes Laborers:
Brick Mason Tender, Cement/Concrete (Incl. Mason Tending) and Power Tool Operator.............................................................................. $ 22.80 13.30 Common/Unskilled............................................................................................. $ 22.80 13.30
PAIN0021-017 05/01/2009
Rates Fringes GLAZIER................................................................................................................ $ 36.64 23.40
PAIN0021-020 05/01/2010
Rates Fringes Painters:
Brush and Roller................................................................................................. $ 24.58 14.64
PAIN0021-033 05/01/2010
Rates Fringes Drywall Finisher/Taper........................................................................................... $ 29.86 10.40
* PLAS0008-004 05/01/2011
Rates Fringes PLASTERER........................................................................................................... $ 33.90 23.55
PLAS0592-033 05/01/2011
Rates Fringes CEMENT MASON/CONCRETE FINISHER........................................................ $ 30.79 13.58
ROOF0030-022 05/01/2009
Rates Fringes ROOFER, Including Waterproofing....................................................................... $ 30.00 22.70
SFDE0669-001 04/01/2011
Rates Fringes SPRINKLER FITTER............................................................................................. $ 31.75 18.50
SHEE0019-003 07/01/2009
Rates Fringes Sheet Metal Worker (HVAC Duct Only)................................................................ $ 32.27 31.47+A FOOTNOTE A: PAID HOLIDAY: Election Day.
SUDE2007-001 08/16/2007
Rates Fringes
ABATEMENT WORKER: ASBESTOS
(Removal from Floors, Ceilings, and Walls)...................................................... $ 18.68 6.89 OPERATOR: Forklift............................................................................................ $ 31.28 6.70 PAINTER: Spray Only.......................................................................................... $ 21.43 8.08 PIPEFITTER, Including HVAC Pipe...................................................................... $ 24.43 15.32 PLUMBER, Excluding HVAC Pipe....................................................................... $ 25.90 6.81 SHEETMETAL WORKER, Excluding HVAC Duct Installation.......................... $ 26.30 17.94 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .