Convert T-621 into Substation and T-624 into Structures Shop P
Solicitation number
FA448622R0002
Issued by

About this file

This solicitation is for the conversion of two facilities, T-621 and T-624, at Lajes Field in the Azores, Portugal. T-621 will be converted into a substation, while T-624 will become a structures shop. The Department of the Air Force, through the United States Air Forces in Europe - Air Forces Africa, will award a firm fixed-price contract not to exceed $5 million for the work in accordance with FAR Subpart 16.202. Offerors must consider seven annexes and one set of project drawings in their proposals, which are due by an unspecified date. The North American Industry Classification code for this opportunity is 236220. The contractor will be selected based on a best-value determination of their responsibility and compliance with the requirements outlined in Sections L and M of the solicitation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5.

1.20

1.

5.

5.82

.6

Passeio 15.31m²

01 02 03 04 05 06 07 08 09 10 11 12

3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10

Parking Spaces 202.74m²

7.53

1.25

.8

1.

5.49 3.

6.80

9.66

GATE 3

Gate 1

Gate 2

Gate 4

2.

5.14

6.

39°

Sidewalk 91.28m²

STRETCH 1

6.

4.60

4.67 .37

40.15

10.39

10.09

7.

1.08

11.37

2.91

22.13 2.07

12.88

25.20

3.

1.

4.

16.13

3.44

3.381.54

1.

4.16

STRETCH 2

STRETCH 3

STRETCH 4

STRETCH 5

STRETCH 6

STRETCH 7

STRETCH 8

STRETCH 9

STRETCH 4

STRETCH 5

STRETCH 6

STRETCH 9

STRETCH 10

STRETCH 11

STRETCH 12STRETCH 12

STRETCH 13

8.

4.30

1.

7.

1.20

1.

.5

.67

00.00

SGS

c e r t i f i c a ç ã o a c r e d i t a d a

PE23162 AR

1:100

ARQ.

PROC.

ESCALAS:

PROJ.

DES.

PLAN AND DETAILS

Marcos AguiarJUL.2021

FINAL PACKAGE - PROJETO DE EXECUÇÃO

1:50 1:20

AR844

L A J E S F I E L D - A Z O R E S - P O R T U G A L

RENOVATE T-621 AND T-624

TRANS.

USAFE - 765th AIR BASE SQUADRON

765 CENPSEP.2021

AutoCAD SHX Text

PLAN - TO EXECUTE

AutoCAD SHX Text 1:100

AutoCAD SHX Text 199.786

AutoCAD SHX Text 199.763

AutoCAD SHX Text 199.656

AutoCAD SHX Text 199.798

AutoCAD SHX Text 199.776

AutoCAD SHX Text 199.955

AutoCAD SHX Text 199.945

AutoCAD SHX Text 199.996

AutoCAD SHX Text 199.915

AutoCAD SHX Text 200.00

AutoCAD SHX Text 199,846

AutoCAD SHX Text 199,947

AutoCAD SHX Text 199,847

AutoCAD SHX Text 199,891

AutoCAD SHX Text 199,891

AutoCAD SHX Text 199.368

AutoCAD SHX Text 199.653

AutoCAD SHX Text 199.640

AutoCAD SHX Text 199.420

AutoCAD SHX Text 200.429

AutoCAD SHX Text 200.302

AutoCAD SHX Text 199.975

AutoCAD SHX Text 199.802

AutoCAD SHX Text 199.990

AutoCAD SHX Text 199.458

AutoCAD SHX Text 199.420

AutoCAD SHX Text 199.915

AutoCAD SHX Text 199.888

AutoCAD SHX Text 199,709

AutoCAD SHX Text 199.980

AutoCAD SHX Text

SEE GATE DETAIL DRAWING 1

AutoCAD SHX Text

SEE GATE DETAIL DRAWING 4

AutoCAD SHX Text

SEE GATE DETAIL DRAWING 3

AutoCAD SHX Text

SEE GATE DETAIL DRAWING 2

AutoCAD SHX Text 2%

AutoCAD SHX Text 2%

AutoCAD SHX Text 2%

AutoCAD SHX Text 2%

AutoCAD SHX Text 2%

AutoCAD SHX Text 199.520

AutoCAD SHX Text 199.566

AutoCAD SHX Text 200.320

AutoCAD SHX Text

LC1

AutoCAD SHX Text

LC1

AutoCAD SHX Text

LC1

AutoCAD SHX Text

LC1

AutoCAD SHX Text

LC1

AutoCAD SHX Text

LC2

AutoCAD SHX Text

LC2

AutoCAD SHX Text

LC2

AutoCAD SHX Text

LC2

AutoCAD SHX Text

LC2

AutoCAD SHX Text

LC3

AutoCAD SHX Text

LC3

AutoCAD SHX Text

LC3

AutoCAD SHX Text

LC3

AutoCAD SHX Text

LC1

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text Betuminous Pavement

AutoCAD SHX Text

SYMBOLS:

AutoCAD SHX Text Concrete Pavement

AutoCAD SHX Text Stone Masonry Walls

AutoCAD SHX Text Garden Areas

AutoCAD SHX Text Topographical levels

AutoCAD SHX Text

MATERIAL CHARACTERISTICS:

AutoCAD SHX Text

3-CONCRETE COVER OF REBARS

AutoCAD SHX Text 40mm - At all surfaces

AutoCAD SHX Text (%%C - rebar diameter)

AutoCAD SHX Text The minimum mooring length and/or splice for all rebar shall a minumum of 45%%C

AutoCAD SHX Text 4-

AutoCAD SHX Text

2-STEEL

AutoCAD SHX Text A500 NR - For Structural Rebar

AutoCAD SHX Text

AutoCAD SHX Text All levels and dimensions refer to unfinished surfaces and are expressed in meters and

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text shall be confirmed on-site.

AutoCAD SHX Text 1-

AutoCAD SHX Text 2-

AutoCAD SHX Text The depth of the foundation and terrain characteristics shall be confirmed to be

AutoCAD SHX Text of 0.20 MPa (2.0 Kgf/cm ).

AutoCAD SHX Text

AutoCAD SHX Text

1-CONCRETE

AutoCAD SHX Text EN206-1; C25/30; XC4(P); Dmax 25; S4; CL0.2 - For structural concrete

AutoCAD SHX Text EN206-1; C12/15; X0(P); Dmax 25; S4; CL1.0 - For blinding concrete

AutoCAD SHX Text All visible concrete elements shall be painted with Hidro-repellent paint equal or similar

AutoCAD SHX Text to "WEBER KLINOR HYDROFUGE B"

AutoCAD SHX Text 3-

AutoCAD SHX Text

HORIZONTAL SIGNAGE

AutoCAD SHX Text 1:50

AutoCAD SHX Text Plain Concrete

AutoCAD SHX Text Foundation

AutoCAD SHX Text Curb Detail (LC1)

AutoCAD SHX Text Jointed, Anti-slip

AutoCAD SHX Text (With Sidewalk)

AutoCAD SHX Text 1:20

AutoCAD SHX Text 2%%%

AutoCAD SHX Text C25/30 Concrete

AutoCAD SHX Text finish

AutoCAD SHX Text Compacted

AutoCAD SHX Text Compacted Soil

AutoCAD SHX Text Cinder

AutoCAD SHX Text Plain concrete

AutoCAD SHX Text foundation

AutoCAD SHX Text Curb Detail (LC2)

AutoCAD SHX Text (With Sidewalk)

AutoCAD SHX Text 1:20

AutoCAD SHX Text variable%%%

AutoCAD SHX Text Compacted soil

AutoCAD SHX Text Fundação em

AutoCAD SHX Text Betão Simples

AutoCAD SHX Text Curb Deatil (LC3)

AutoCAD SHX Text (With Sidewalk)

AutoCAD SHX Text 1:20

AutoCAD SHX Text 2%%%

AutoCAD SHX Text Plantation

AutoCAD SHX Text compost

AutoCAD SHX Text Plantation

AutoCAD SHX Text compost

AutoCAD SHX Text Compacted

AutoCAD SHX Text soil

AutoCAD SHX Text Jointed, Anti-slip

AutoCAD SHX Text C25/30 Concrete

AutoCAD SHX Text finish

AutoCAD SHX Text Compacted

AutoCAD SHX Text Compacted Soil

AutoCAD SHX Text Cinder

AutoCAD SHX Text SUB-BASE COURSE (VULCANIC GRAVEL) - 0.20m

AutoCAD SHX Text BASE COURSE (TOUT-VENANT) - 0.15m

AutoCAD SHX Text SURFACE COURSE (BETUMINOUS) - 0.06m

AutoCAD SHX Text

COMPACTED SOIL

AutoCAD SHX Text

BETUMINOUS PAVEMENT

AutoCAD SHX Text 1:20

AutoCAD SHX Text BINDER COURSE - 0.05m

AutoCAD SHX Text

COMPACTED SOIL

AutoCAD SHX Text

SIDEWALK PAVEMENT

AutoCAD SHX Text 1:20

AutoCAD SHX Text COMPACTED CINDER - 0.15m

AutoCAD SHX Text

C25/23 CONCRETE (ANTI-SLIP AND

AutoCAD SHX Text JOINTED FINISH) - 0.10m

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text Ç

AutoCAD SHX Text Ã

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

Sheets and Views
AR02 - PE23162

File details come from the government source that posted it. Updated .