This is a Statement of Work for CCTV installation and security camera system deployment at the Global Reach Deployment Center (GRDC) located at Joint Base McGuire-Dix-Lakehurst in New Jersey. The contractor must provide labor, materials, and comprehensive installation services for a complete surveillance system. Work shall be performed Monday through Friday, 7:30 a.m. to 4:00 p.m., excluding federal holidays except in emergency situations. The contractor must maintain an on-site point of contact, comply with all JB MDL security requirements, ensure personnel possess valid DoD identification or visitor passes, and adhere to strict photography and operational restrictions within the controlled/restricted area. All contractor personnel must have legal United States residency and work authorization status.

The CCTV system must include dome-style cameras capable of 4K to 1080p resolution at 15-30 frames per second with infrared night vision capability for 24-hour continuous coverage. Outdoor cameras must provide 1080p to 4K resolution with 180-degree field of view for facial and license plate detection. The system shall be standalone without internet connectivity, include export capability via USB to external hard drives, maintain a minimum 90-day video retention period, and operate on an uninterrupted power supply (UPS) for up to 60 minutes during power outages. The NVR system, monitors, and recording device shall be installed in either room 112 (Wing XP Office) or room 115 (Port Office). All equipment must be securely mounted with proper cable installation using conduit or trunking, include infrared night vision capability, vandalism protection housing, and a minimum two-year warranty on parts and labor. The contractor must remove the existing CCTV system, conduct a final completion walkthrough with 621 CRSS personnel, provide training to users, and ensure the warranty period begins from the final completion date.

View the file

Other files

File Type Posted
cctv questions.docx DOCX document
CCTV Combined Synopsis (v2 updated).docx DOCX document
cctv combo 1449 1.pdf PDF
cctv combo 1449 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Global Reach Deployment Center Security Camera Installation

1. BASIC SERVICE: 621 CRSS is soliciting services of labor, material and fully comprehensive work to perform CCTV installations within the Global Reach Deployment Center (GRDC) at Joint Base McGuire-Dix-Lakehurst (JB MDL), NJ.

1.1. GENERAL INFORMATION: c

1.2. HOURS OF PERFORMANCE: The contractor shall perform work during normal operating hours Monday through Friday, 7:30 a.m. to 4:00 p.m. at the GRDC on JB MDL. The contractor shall provide an on- site point of contact (POC) for all contractual matters during all hours of operation.

1.2.1. RECOGNIZED HOLIDAYS: The contractor shall not provide service on Federal holidays, except in emergency situations; the holidays are.

New Years Day – 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

1.2.2. If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday; the following Monday will be observed. If a holiday falls on a scheduled service day, the contractor will be responsible for rescheduling services for the first day past the holiday observance.

1.2.3. SIGNS: The contractor shall post signs and / or cordon entrances and affected area stating, “Work in Progress – No Admittance”, during the duration of the work.

1.2.4. CLEAN-UP: The contractor shall discard all waste material used in appropriate containers. The entire work will be left clean and presentable.

1.3. SECURITY REQUIREMENTS: The contractor shall comply with all JB MDL security requirements. The GRDC is a controlled/restricted area and special security procedures are utilized to deter espionage, sabotage, and theft of Air Force resources. The contractor shall be responsible for security of their work areas in cooperation with applicable base agencies. All contractor personnel must have legal United States residency and work authorization status.

1.3.1. VEHICLES AND PASSES: All contractor or contractor employee vehicles used in the performance of this contract shall comply with all local, state, and federal regulations. All contractor employees must possess a valid DoD ID or obtain a visitor pass from the Visitor Center located on Enoch Road. All vehicles will be used in accordance with AFI 31-218, Air Force Motor Vehicle Traffic Supervision. All vehicles attempting to gain access to JB MDL must be available for inspection. Large commercial vehicles will present themselves at the JB MDL Commercial Vehicle Entry Gate for inspection prior to gaining access to JB MDL.

1.3.2. PHOTOGRAPHY: Procedures for taking photographs within restricted areas are established to ensure that only authorized personnel take photos and only for authorized purposes. Photographs, drawings, videotaping, sketches, cell phones with digital cameras, or any like method of recording operations within a restricted area for other than approved official use is strictly prohibited.

1.3.3. CONTRACTOR PERSONNEL: The contractor’s personnel shall conduct themselves in a professional manner. Contractor uniforms, badges, and appearance standards shall be commensurate with industry standards. The contractor through the contracting office will provide a POC with the Contracting Officer Representative (COR) before proceeding to start work.

2. QUALITY CONTROL: The contractor is responsible for quality of workmanship and shall ensure proper work in accordance with commonly accepted commercial practices. If not completed to commercial standards the contractor will re-accomplish the task.

2.1. QUALITY ASSURANCE: The government, through the COR, will inspect the contractor’s performance in accordance with the specific contract performance requirements.

2.2. GOVERNMENT REMEDIES. The Contracting Officer (CO) shall follow FAR 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services (January 2025), for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

3. WORK TO BE COMPLETED:

3.1. OPERATIONAL REQUIREMENT:

3.1.1 SAFETY AND SECURITY

· The system should be capable of increasing the safety and security of the employees and the property of the GRDC.

· The system will provide a passive deterrence.

· In case of criminal investigation, recorded images should be of good quality and fit the purpose in the event of an after-the-fact incident.

3.2. MINIMUM CHARACTERISTICS (ALL CAMERAS)

· System must monitor entrances and equipment in the GRDC.

· Cameras must be dome-style, providing panoramic imaging.

· Cameras must be standalone – they will not connect to internet.

· System resolution must be 4k to 1080p.

· System frame rate must be 15-30 frames per second.

· System must detect individuals approaching the GRDC.

· System must observe vehicles approaching the West side of the GRDC.

· System must obtain continuous 24-hour imaging coverage that would enable 621 CRSS personnel or police to identify individuals.

· Cameras must be fixed and point in specific directions. A survey of the location will be completed (See attached diagram)

· Cameras must be infrared night vision capable, providing good quality images during hours of darkness.

· Cameras must be fitted with housing for protection against vandalism.

· Cameras must include a minimum 2-year warranty on parts and labor.

3.3 MINIMUM CHARACTERISTICS (OUTDOOR CAMERA)

· Cameras must be fitted with housing for protection against environmental conditions.

· Outdoor camera must have high resolution (1080p to 4k) for face and license detection.

· Outdoor camera must have 180° field of view.

3.4 MINIMUM CHARACTERISTICS (OTHER EQUIPMENT)

· The CCTV system must be provided with suitable export facility, meaning the ability to export video to an external “plug and play” hard drive via a USB.

· System must have a retention period of a minimum of 90 days

· The system must operate on an uninterrupted power supply (UPS) for up to 60 minutes in case of power outages.

· The system must include a minimum 2-year warranty on parts and labor.

· The system must be able to hook up with existing monitor or install a new monitor with HD 1920-1080 resolution.

· The NVR CCTV including UPS system, monitors, and recording device shall be installed in room 112(Wing XP Office) or an alternate location room 115 (Port Office) if room 112 does not work.

· The system will be standalone and will not be using the NIPR network.

4. STANDARDS OF INSTALLATION

4.1 MOUNTING AND SERCURING THE EQUIPMENT

· All equipment installed must be suitable to withstand the prevailing environmental conditions.

· All cameras and IT supporting hardware will be securely mounted. The camera mounting bracket / pole must support the weight and windage of the camera and any associated hardware.

4.2 CABLE INSTALLATION

· All interconnecting cables shall be fixed, supported, and installed to conform to good working conditions and secured.

· Conduit: when metal is used, suitable bushes or grommets must be fixed to each end to prevent damage to the cable. Where conduit is used to carry the cable, it must terminate as close as possible to the unit to be connected.

· PVC or metal trunking: where trunking is used to carry cable, it must terminate as close as possible to the unit to be connected.

· All cable must be of a type and size appropriate to the application and must take account of transmission rate, electrical interference, and voltage drop.

· Any plastic or PVC components used as part of the installation of cables must be suitable for the environment in which it is installed.

4.3 MAINTENANCE

· Effective and regular maintenance of the CCTV surveillance system is essential to ensure that the system always remains reliable. Regular maintenance by the service company, and effective failure reporting by the user, will enable potential problems to be identified at an early stage for appropriate action to be taken.

· Preventive Maintenance visits – Planned services of the system, carried on a scheduled basis. The organization will coordinate visits with the installer to conduct Preventive Maintenance visits.

· Corrective Maintenance – Emergency servicing of the system, or part thereof, carried out in response to the development of a fault. The system must have a warranty of at least three years upon which the installer shall not charge 621 CRSS for any corrective maintenance.

4.4 HANDOVER

· At handover, the installer shall demonstrate all aspect of the system operation to the customer, including any necessary safety precautions.

· Ensure correct documentation is provided to the customer to enable the system to be operated, adjusted, and maintained.

· Provide the necessary training to the users, and coordinate for any future necessary training.

· Ensure that users know the procedure for requesting assistance in the event of system malfunctions.

5. CONTRACTORS RESPONSIBILITY

· The contractor shall install CCTV system in the GRDC area as specified in the attached diagram.

· The contractor shall remove the current CCTV system and dispose of equipment that cannot be used to install new camera system. If there are existing cables/conduit that can be used, do not remove them, and reuse as needed.

5.3 PROCEDURES

· All building rubble shall be removed, and site shall be kept clean.

· Any damage to well shall be repaired.

· Areas where work is completed shall be returned to previous conditions as before work commenced.

· Safety gear shall be used to prevent any injuries.

· The contractor shall coordinate a Final Completion walkthrough with 621 CRSS POC. The warranty shall be based on that completion date image1.jpg