A11 Vehicle Barrier Maintenance Questions and Answers 4 Feb 25.docx
DOCX document 20 KB Posted
- Attached to
- Vehicle Barrier
- Solicitation number
- FA448425R0009
About this file
This is a Questions and Answers document for solicitation FA448425R0009 regarding vehicle barrier maintenance services at Joint Base McGuire-Dix-Lakehurst. The document addresses 14 contractor questions covering technical specifications, security requirements, and barrier details.
Key clarifications include: the NAICS code was changed to 561621, security checks are valid for 3 years but site passes only for duration of work, contractors must source an equivalent paint since Grip-Tite is no longer manufactured, CLIN X005 for barrier schematics has been removed, and the most recent preventative maintenance was performed January 28-29, 2025. The document references an attached "Barrier Template" that provides details on barrier quantities, power units, and control systems per gate. While manufacturer certification is not strictly required, contractors must follow manufacturer specifications or prescribed standards. The solicitation requires quarterly maintenance services for 10 vehicle barriers, with quotes due by 5:00 PM EST January 31, 2025, and questions were due by 2:00 PM EST January 22, 2025.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A for FA448425R0009, Vehicle Barrier Joint Base McGuire-Dix-Lakehurst.
Q1. Could there be a consideration to change the existing NAICS code to 561621 or 811210?
Answer: The NAICS was changed to 561621 in order to facilitate a more comprehensive response.
Q2. A8 SFS Appendix CONTRACTOR APPENDIX, Page 2, Section 3.1.6.7 History Record and Background Checks will be valid for a period not to exceed 3 years.
Does this mean site passes are valid for 3 years?
Answer: Site passes are only valid for as long as the work is being done. The security checks will be valid for 3 years and after that time period will need to be redone before further work can be performed on the installation. This does not mean that changes in policy can’t occur and new checks may be required.
Q3. ATT 1 - Performance Work Statement, Page 67, Section 1.2.1.6 Paint/Corrosion Control. Please confirm an equivalent brand preference due to Grip-Tite paint is no longer manufactured.
Answer: PWS Paragraph 1.2.1.6 PAINT/CORROSION CONTROL – TASK ORDER LEVEL states: “Barrier systems, both active and passive, shall be maintained and protected from corrosion with high adhesion paint such as GripTite® paint or an equivalent adhesive paint.” The contractor is responsible, as the subject matter experts on the barriers, to procure and apply an equivalent adhesive paint for the appropriate barriers.
Q4. A1 Performance Work Statement, Page 8, Section 1.2.4 Please confirm barrier schematic and documentation (CLIN X005) option will be utilized, should CLIN X005 pricing be included in proposal.
Answer: This CLIN will not be utilized and associated verbiage has been removed from the PWS.
Q5. A1 Performance Work Statement, Page 22, Appendix A Please confirm the quantity of barriers per Gate and/or lane.
Answer: See attachment labeled “Barrier Template”
Q6. A1 Performance Work Statement, Page 22, Appendix A Please confirm the quantity of Power Units per Gate.
Answer: See attachment labeled “Barrier Template”
Q7. A1 Performance Work Statement, Page 22, Appendix A Please confirm the Power Source for each Gate (Electric or Hydraulic). For example, DSC501 Hydraulic.
Answer: See attachment labeled “Barrier Template”
Q8. A1 Performance Work Statement, Page 22, Appendix A Please confirm the approximate equipment installation year for each Gate.
Answer: See attachment labeled “Barrier Template”
Q9. What is the date of the last preventive maintenance (PM) service? What type of service was it (monthly, quarterly, semi-annual, annual)? If not an annual PM, when was the last annual PM conducted for scheduling purposes?
Answer: The date of the most recent preventative maintenance was January 28-29, 2025. As it states in the Performance Work Statement, section 1.2.1 “The Contractor shall provide a total of four (4) each quarterly (or as identified in the Task Order) maintenance, inspections, and repair services. The frequency of PM will be identified by the Ordering Contracting Officer (CO) at the Task Order level and shall be at least quarterly.”
Q10. Is the contractor required to be certified by the AVB manufacturer?
Answer: Not necessarily, however, as it states in the Performance Work Statement, section 1.2.1, “The Contractor shall comply with the recommendations of the manufacturer, but the performance frequency shall be as determined by the Ordering CO and included in the resultant Task Order. The Contractor is responsible for obtaining the manufacturer specifications. If the manufacturer specifications are not available, the Contractor shall adhere to the following order of precedence (higher to lower): contents of this PWS, Original Equipment Manufacturer (OEM) requirements, and industry standards.”
Q11. APPENDIX A: TASK ORDER BARRIER LOCATIONS lists the gate locations and the make/model of barrier at each gate. However, it does not indicate the number of each make/model barrier at each gate. Please confirm the makes/models of barriers at each gate is accurate and specify the number of each make/model barrier at each gate.
Answer: See attachment labeled “Barrier Template”
Q12. For each barrier location, please confirm the make/model of the control system in place and any traffic lights (overhead or side of the road), overspeed detection, wrong way detection, and number/location of push button controls.
Answer: See attachment labeled “Barrier Template”
Q13. Can the government provide pictures of each barrier location to show the roadway markings on the surrounding pavement?
Answer: A site visit can be arranged after successfully awarding the contract prior to scheduling the first quarterly maintenance.
Q14. Please specify how many feet in front of, behind, and to the sides of the barriers are included in the requirement to paint roadway markings.
Answer: Please refer to section 1.2.1.6 of the Performance Work Statement, “Paints used for pavement marking and delineation must conform to all Federal, State, and local laws, and regulations (see PWS Appendix D).”