A1_Performance_Work_Statement.pdf
PDF 48 KB Posted
- Attached to
- Hangar Fire Protection Systems Federal contract opportunity
- Solicitation number
- FA4484-14-R-0017
About this file
A1 - Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Amendment_6_Conformed.pdf | ||
| FA4484-14-R-0017_Site_Visit_Meeting_Minutes.pdf | ||
| FA4484-14-R-0017_Site_Visit_Questions_and_Answers_Oct_2014.pdf | ||
| SF30_Amendment_6.pdf | ||
| FA4484-14-R-0017-0005.pdf | ||
| SF_30_Amendment_4.pdf | ||
| SF_30_Amendment_3.pdf | ||
| HANGAR_FIRE_PROTECTION_PWS_REV_6__17_SEP_14.doc | DOC document | |
| SF_30_Amendment_3_Conformed.pdf | ||
| SF__30_Amendment__2.pdf | ||
| SF_30_Amendment__2.pdf | ||
| SF_30_Amendment_1.pdf | ||
| FA4484-14-R-0017_Hangar_Fire_Protection_Solicitation.pdf | ||
| A4_Past_Performance_Questionnaire.pdf | ||
| A6_Security_Forces_Appendix.pdf | ||
| A2_Quality_Assurance_Surveillance_Plan.pdf | ||
| A3_Past_Perf_Cover_Letter.pdf | ||
| A5_Wage_Determination_2005-2449.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
ANNUAL PREVENTATIVE MAINTENANCE,
INSPECTION / TESTING, REPAIR,
AND CERTIFICATION OF AIRCRAFT
HANGAR FIRE PROTECTION SYSTEMS
AT
JOINT BASE MCGUIRE-DIX-LAKEHURST
Joint Base McGuire-Dix-Lakehurst Rev 4
29 Jul 14
PERFORMANCE WORK STATEMENT
FOR
ANNUAL PREVENTATIVE MAINTENANCE,
INSPECTION / TESTING, REPAIR, AND CERTIFICATION
OF AIRCRAFT HANGAR FIRE PROTECTION SYSTEMS
AT
JOINT BASE MCGUIRE-DIX-LAKEHURST
1.0. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain continuous and safe operations of aircraft hangar fire protection systems located at Joint Base McGuire-Dix-Lakehurst. The scope of work includes, but is not limited to: the annual preventative maintenance, inspection / testing, repair, and certification of fire protection systems located in aircraft hangars, freight terminal, high bay warehouses, and supporting pump houses listed on Appendix A.
1.1. BASIC SERVICES. The contractor shall perform preventative maintenance, inspection / testing, repair, and certification of aircraft hangar fire protection systems, freight terminal fire protection systems and high bay warehouses fire protection systems including supporting pump houses on an annual basis located on McGuire. The aircraft hangar fire protection systems include but not limited to: pumps, tanks, risers, sprinkler heads, cannons, alarm panels, transceivers, enunciator panels, modules, sensors, power supplies, horns, strobes, etc. The contractor shall repair mechanical / electrical deficiencies found during the preventative maintenance and inspection / testing cycle. The contractor shall use the following publications for guidance: Unified Facilities Criteria (UFC 3-601-02 dated 8 Sep 2010), National Fire Protection Association (NFPA-25), National Fire Protection Association (NFPA-72), Air Force Occupational and Environmental Safety and Health (AFOSH), American National Standards Institute (ANSI), American Society of Mechanical Engineers (ASME), and Occupational Safety and Health Administration (OSHA). All routine annual preventative maintenance, inspections / testing, repairs, and certifications shall be scheduled in advance with the Contracting Officer Representative (COR) to minimize disruption to government operations / employees. The government reserves the right to postpone or interrupt scheduled services up to four days per contract year to support emergent mission requirements with no additional cost increases to the government.
1.1.1. PREVENTATIVE MAINTENANCE. The contractor shall perform preventative maintenance on all aircraft hangar fire protection systems, freight terminal fire protection systems, high bay warehouses fire protection systems and supporting pump houses listed on Appendix A in accordance with NFPA-25 and NFPA-72 for all mechanical and electrical systems concurrent with the annual inspection / testing, repair, and certification cycle. Any deficiencies, malfunctions, or discrepancies discovered during the preventative maintenance cycle shall be immediately reported to the COR in a written report for determination of repair procedure. All defects found shall be corrected by the contractor, up to the limits established in Paragraph 1.1.4. Air Force personnel will be responsible for performing preventative maintenance on mechanical / electrical systems in accordance with the frequencies delineated in NFPA-25 / NFPA-72 during the year. The contractor shall provide a written report of all preventative maintenance actions performed on each fire protection system.
1.1.2. INSPECTION / TESTING. The contractor shall perform the inspection / testing of all fire protection systems and supporting pump houses listed on Appendix A in accordance with NFPA-25 and NFPA-72 for all mechanical and electrical systems concurrent with the annual preventative maintenance, repair, and certification cycle. The annual inspection / testing schedule shall be provided by the contractor to insure the availability of the fire protection systems due to mission requirements. Inspection / testing shall be witnessed and certified by the government’s authorized representative. Any deficiencies, malfunctions, or discrepancies discovered as a result of these inspections / testing shall be immediately reported to the COR by written report for determination of repair procedure. All defects found shall be corrected by the contractor, up to the limits established in Paragraph 1.1.4. After repairs are made, the failed inspection / testing shall be re-performed. Documentation of inspection / testing shall be maintained by the contractor and a copy shall be provided to the COR.
1.1.3. SERVICE CALLS. At times, repair work will be identified through in-house fire technicians or as a result of equipment malfunctions. The contractor may be requested to provide quotations for repairs by inspecting the damaged equipment at no cost to the government.
1.1.4. REPAIRS. The contractor shall repair all mechanical / electrical / control / safety deficiencies as a result of the preventative maintenance, inspection / testing, and certification procedures.
1.1.4.1. MINOR REPAIRS. The contractor shall repair the fire protection system at the contractor’s expense if the material cost is less than $100.00 per system. The contractor shall absorb the labor expenditure. The contractor shall ensure all minor repair work commences within one (1) business day. The contractor shall ensure that all repair work is completed within one (1) business day of commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a written report to include but not limited to: mechanical / electrical / control / safety deficiencies found, actual parts replaced, parts cost, and man hours per repair. A copy of the repair report shall be provided to the COR.
1.1.4.2. MAJOR REPAIRS. The contractor shall repair the fire protection system at the contractor’s expense if the material cost is less than $100.00 per system. If the repair work for a fire protection system is between $100.00 and $2,500.00 in total costs, the contractor shall provide a written repair cost estimate to the COR within two (2) business days of finding the deficiency requesting authorization to proceed. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of material, the labor hours needed to complete repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for material and labor costs only if COR authorization is granted. At no time shall work in excess of $100.00 be completed without COR approval. If the work exceeds $2,500.00 in total costs, the contractor shall provide a written repair cost estimate directly to the Contracting Officer (CO) only (not to the COR) within two (2) business days of finding the deficiency. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of the material, the labor hours needed to complete the repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for the material and labor costs only if CO authorization is granted. At no time shall work in excess of $2,500.00 be completed without CO approval. There’s no maximum financial threshold for major repairs under this contract. The contractor shall ensure all major repair work commences within three (3) business days of COR or CO approval. The contractor shall ensure that all repair work is completed within seven (7) business days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a written repair completion report to include but not limited to: mechanical / electrical deficiencies found, actual parts replaced, parts cost, and actual man hours per repair. A copy of the repair report shall be provided to the COR.
1.1.5. CERTIFICATION. The contractor shall certify each fire protection system and supporting pump houses on an annual basis to insure that all systems have passed the requirements of NFPA-25 and NFPA-72. The fire protection systems shall be certified in conjunction with the annual preventative maintenance, inspection / test cycle and repair (if applicable) without releasing the fire retardant foam. The contractor shall physically attach an annual certification sticker on each fire protection system. The contractor shall provide a certification document / report for each fire protection system to the COR.
1.2. REPORTS / DOCUMENTATION. The contractor shall prepare and submit written reports and documentation for the preventative maintenance, inspection / testing, repair, and certification of each fire protection system. The reports and / or documentation shall be forwarded to the COR within two (2) business days of the completion of any service. The reports and / or documentation shall include but not limited to: location, type, manufacturer, and model number of each fire protection system; work performed; repairs completed (if applicable);
preventative maintenance, date of inspection, date of repair, date of certification, name of technician, and overall condition of the equipment.
1.3. MANPOWER REPORTS. The contractor shall make available at the end of each contract year, any contractor reports analyzing labor hours, materials consumption, and equipment usage and general performance data. Reports will itemize such data and provide overall scope summaries. The contractor shall mark any proprietary information. The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each government fiscal year (FY), which runs 1 Oct through 30 Sep. While inputs may be reported any time during the FY, all data shall be reported no later than 31 Oct of each calendar year. The contractor may direct questions to the Contractor Manpower Reporting Application help desk at http://www.ecmra.mil
2.0. SERVICE DELIVERY SUMMARY
Performance Objectives
Statement of Work
Paragraph
Performance Thresholds
Preventative Maintenance.
Performs full preventative maintenance actions and provides required reports on an annual basis.
1.1.1 All preventative maintenance shall be completed 100% of the time
Inspections / Testing. Performs inspections / testing and provides required reports on an annual basis.
1.1.2 All units shall be inspected / tested 100% of the time.
Repairs. Performs repairs found during preventative maintenance and inspection / testing cycle in accordance with timelines.
1.1.4 All repairs shall be completed within the allotted timeframes 98% of the time.
Certifications. Conducts the certification process on an annual basis in accordance with all publications / industry standards.
1.1.5 All certifications shall be completed 100% of the time
Reports / Documentation.
Provides accurate reports and documentation.
1.2 All reports / documentation are current and available 100% of the time.
Manpower Reports. Provides annual labor data documentation
1.3 All required documentation 100% of the time.
3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES. All reasonable quantities of utilities will be available to the contractor without charge. Any temporary lines and connections that may be required shall be installed, maintained and removed by the contractor at his expense and in a manner satisfactory to the COR.
3.1. POLICE PROTECTION. Base Security Forces shall provide initial law enforcement response and services to the contractor. The Base Security Operations Desk can be reached at phone number (609) 562-6001.
3.2. FIRE PROTECTION. Base Fire Departments shall provide initial response and fire protection services to the contractor. The base Fire Alarm Control Centers can be reached at phone number 911 from a base telephone. If dialing 911 from a cell phone, the location must be fully identified to ensure that the proper responder is notified.
3.3. EMERGENCY MEDICAL SERVICE (EMS). The medical treatment facility may provide urgent health care to contract employees (contract employee is not a government employee but is a contractor or an employee of a contractor) for injuries occurring while on duty.
Urgent health care is defined as medical care authorized to the extent necessary to save life or limb and prevent undue pain and suffering. The contract employee will be transferred to a civilian medical facility as soon as the contract employee is stabilized. The cost of such treatment will be paid for, in full, within a reasonable period of time, by the contract employee and will not be borne by the 87th Medical Treatment Facility, the United States Air Force or the government. An AF Form 1127, Hospital Invoice/Receipt / Accounts Receivable Record, will be prepared to ensure collection and/or billing of charges. If a contract employee cannot pay for the treatment at the time of discharge, a statement of charges and a letter of indebtedness will be completed and billed to the contract employee for medical services rendered. An accounts receivable record will be established for each contract employee who receives medical care and is unable to pay at the time of discharge. Follow-up on accounts receivable will be completed in accordance with AFI 41-120, Medical Resource Operations. After an accounts receivable record is established and billing for outpatient medical services has occurred, the SF 558, Medical Record - Emergency Care and Treatment, will be annotated with the date of billing and the voucher number and forwarded to Outpatient Records to be filed in the medical record folder.
The contract employee shall ensure that he/she provides timely notice to his/her medical insurance company and that if the insurance company is to make payment, the insurance company has adequate information and documentation to make payment. A contract employee treated in a natural disaster is not charged for outpatient care.
3.4. RESTRICTED AREA BADGES. The government shall furnish an USAF Restricted Area Badge (AF Form 1199A) to all authorized contractor employees with proper security clearances and a validated need for access to flight line areas to perform maintenance services. The contractor shall coordinate the required request for restricted area badges with the COR.
3.5. RESTRICTED AREA ESCORTS. The government shall provide escort services for contractor employees to provide maintenance services within base restricted areas only until the contractor has been provided with the required AF Form 1199A (with escort authorization) to provide their own escorts. The contractor shall coordinate the necessary government escort services with the COR. The contractor is required to obtain restricted area badges for employees. The contractor shall obtain the appropriate number of employees with badges to escort the workforce.
3.6. PHYSICAL SECURITY. The contractor shall be held fully accountable for any failure to maintain the physical security of all base restricted areas, secured facilities or sites that they are responsible for providing services within. The contractor shall be responsible for the safekeeping and inventorying of all government-furnished keys and combinations issued for the performance of services within secured areas. All losses or damages caused by the contractor, or by the contractor’s failure or negligence in maintaining proper security of these areas will be paid for by the contractor. Upon termination or completion of the contract, the contractor shall secure the previously issued keys and return them to the COR within twenty-four (24) hours.
3.7. FLIGHTLINE DRIVERS TRAINING. The government shall provide all required flight drivers flight line certification training to the contractor as required to perform maintenance services. Once the contractor’s employees have successfully completed the required training, the government will issue to all employees a Base Flight line Competency Card (AF Form 483).
The contractor shall coordinate the required flight line driver’s training with the COR.
4.0. GENERAL INFORMATION.
4.1. HOURS OF OPERATION. The normal hours of operation for the contractor to perform normal maintenance and repair services required under this contract are 7:00 AM to 4:00 PM, Monday through Friday. The contractor is not required to provide normal service except for emergencies on the following days: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. The COR or CO must approve in advance, excluding legal holidays, any exceptions to work hours and designated workdays. The contractor shall submit their request to COR and CO no later than two (2) working days in advance of the requested change(s).
4.2. CONTRACTOR PERSONNEL. The contractor and their employees shall comply with all base regulations at all times and shall conduct themselves in a professional manner.
Uniforms, badges, and good behavioral conduct will be mandatory. The contractor shall provide a complete and current employee roster to the COR and CO within ten (10) working days of the contract award and each subsequent option renewal. The contractor’s employee roster shall identify the primary and alternate site manager or foreman and the Quality Control inspector and their telephone or beeper numbers. As required, the contractor shall provide updated copies of their employee roster to the COR and CO.
4.3. CONTRACTOR EMPLOYEE UNIFORMS AND IDENTIFICATION. All contractor employees shall wear a distinctive company logo on their outer garment at all times. The contractor employee shall be neat and professional in appearance and meet current commercial standards. In addition, the contractor’s employees shall wear a company-issued identification badge with the company’s name, employee’s name and employee’s photo prominently displayed on their outer clothing.
4.4. TOBACCO POLICY. The contractor shall ensure that all contractor employees do not use tobacco products within 50 ft. of any base facility, around fuel tanks and generators, within any clearly marked “No Smoking” areas or within 50 ft. of any flight line aircraft parking areas.
4.5. SAFETY AND ACCIDENT REPORTING. The contractor shall be responsible for providing services under this contract in accordance with (IAW) all base, local, state and Federal occupational safety requirements. The contractor shall ensure that all services are conducted safely at all times. The contractor shall ensure that all contractor employees are issued and properly use all required safety personal protective equipment. The contractor shall use mechanically sound and safe vehicles and equipment in the performance of services under this contract. The contractors shall take necessary corrective actions if the contractor’s employees are conducting operations in an unsafe manner. In the event of an accident, the contractor shall contact the base emergency 911 service and the COR immediately. Additionally, the contractor and contractor’s personnel will be knowledgeable of and comply with all other base incident-reporting procedures. See the Safety Guide for Civilian Contractors, July 2014, on Appendix B for additional information.
4.6. INCLEMENT WEATHER SCHEDULE. The contractor shall provide operational service during periods of inclement weather. No exceptions shall be granted.
4.7. HIRING GOVERNMENT PERSONNEL. The contractor is restricted from hiring the COR, inspectors, monitors or any other government employees whose employment could result in conflict of interests in accordance with DOD 5500.7R
4.8. SECURITY REQUIREMENTS / VEHICLES AND PASSES. All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. In addition, all vehicles described above must be registered through the Security Police Squadron, Pass and Registration and will comply with JB MDL directives. After award of contract, the contractor shall request through the COR, CO and Security Forces to be issued base passes and identification badges for their employees and work vehicles in accordance with the attached Contractor Security Appendix – 1 Oct 13. Reference:
Appendix C.
4.9. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY OR THE LOCAL INSTALLATION
COMMANDER. This service does not meet the criteria for continuation of performance during a crisis.
4.10. EXECUTIVE ORDER (EO) 13423 (Strengthening Federal Environmental, Energy, and Transportation Management). The contractor shall assist in compliance with this EO through the:
(a) Use of products with post-consumer recycled content
(b) Use of products that are recyclable
(c) Use of low toxicity or non-toxic products
(d) Use and installation of low-maintenance products
5.0. ENVIRONMENTAL COMPLIANCE. The contractor is required to comply with all applicable bases, local, state and Federal environmental laws and regulations, including Air Force Instructions, in effect at the time of performance of this contract. The contractor shall be responsible for obtaining and complying with any required operating permits. The contractor shall be responsible and liable for penalties, fines, or environmental damage claims that may be required or assessed by the local, state or Federal governments as a result of the contractor’s performance, or failure to perform, during the course of this contract. The government will inspect for environmental compliance at their discretion, and will notify the COR of any discrepancies found. In addition, the contractor may be subject to contractual sanctions including, but not limited to, termination, suspension, and debarment and adverse past performance assessment.
5.1. SOLID WASTE. The contractor is responsible for the proper handling and disposal of solid waste. The contractor shall also be responsible for any enforcement action that may be taken by the State of New Jersey, other State or the Federal Government related to handling, transportation and the proper disposal of solid waste materials. If notification, certifications, documentation, manifests, permits or any other written materials are required by law to be obtained, prepared and/or submitted, the contractor shall prepare same and provide a written copy to the COR. Any action, which violates permit requirements for compliance, must be reported to the Environmental Flight immediately.
5.2. NOTIFICATION OF ENVIRONMENTAL SPILLS. In the event that the contractor spills or releases any un-permitted substance, hazardous substance or hazardous waste into the environment, the contractor shall immediately report the incident to the Fire Department, the COR, and the CO. The contractor shall be liable for the costs of clean up and remediation of any spills or the release of such substance into the environment. The government shall provide the contractor reasonable amounts of electricity and water.
5.3. MATERIALS. All materials used in the performance of services on the installation shall be in compliance with industry standards, local, Federal and State laws, and will be used according to manufactures' recommendations. Materials will be used for intended purposes and will be stored and utilized in accordance with industry standards. The contractor will submit Material Safety Data Sheets on all materials to be used fifteen (15) days prior use for approval by the COR.
6. APPENDICES:
A. ESTIMATED WORKLOAD DATA
B. SAFETY GUIDE FOR CIVILIAN CONTRACTORS
C. SECURITY REQUIREMENTS
APPENDIX A
ESTIMATED WORKLOAD DATA
The estimated workload data is predicated on current known requirements and does not reflect a commitment or guarantee of firm work due to the dynamic mission of Joint Base McGuire-Dix-Lakehurst. The quantities listed on the bid schedule reflect the hangar fire protection systems to be serviced which could change due to facility modifications or budgetary constraints.
Facility Number
System Type
Valve Size
Mfr Model # Remarks Alarm Panel
Alarm Model # Funds Type
1757 Wet Pipe 6” Grinnell 590 FCI 7100-1 TWCF 1757 Wet Pipe 6” Grinnell 590 FCI 7100-1 TWCF 1757 Wet Pipe 6” Grinnell 590 FCI 7100-1 TWCF 1757 Wet Pipe 2” Gruvlock 7800 TP FCI 7100-1 TWCF 1757 Dry Pipe 6” Tyco DPV FCI 7100-1 TWCF 1757 Dry Pipe 6” Tyco DPV FCI 7100-1 TWCF 1757 Dry Pipe 4” Tyco DPV FCI 7100-1 O&M 1757 Wet Pipe 6” Grinnell 590 FCI 7100-1 O&M 1757 Wet Pipe 6” Grinnell 590 FCI 7100-1 O&M 1757 Dry Pipe 4” Tyco DPV-1 FCI 7100-1 O&M 1811 Wet Pipe 6” Victaulic V27V38 Siemens FS 250 O&M 1811 Deluge 12” Viking AFFF Siemens FS 250 O&M 1811 Deluge 12” Viking AFFF Siemens FS 250 O&M 1823 Wet Pipe 6” Viking J-1 Faraday MPC-1500 Plus TWCF 1823 Deluge 6” Viking E-1 HEF Potter PFC-4410-RC TWCF 1837 Wet Pipe 6” Viking J-1 Simplex 4020 O&M
1837 Deluge 6” Viking E-1
AFFF
Cannons
Notifier System 5000 O&M
1837 Deluge 6” Viking E-1
AFFF
Cannons
Notifier System 5000 O&M
1837 Deluge 6” Viking E-1
AFFF
Cannons
Notifier System 5000 O&M
1837 Deluge 6” Viking E-1 AFFF Notifier System 5000 O&M 1837 Wet Pipe 8” Viking J-1 Simplex 4020 O&M 2201 Deluge 6” Victaulic S/758 HEF Seimens MXL TWCF 2201 Wet Pipe 6” Victaulic 717R HEF Seimens MXL TWCF 2201 Wet Pipe 8” Victaulic 717R Seimens MXL TWCF 2201 Dry Pipe 6” Victaulic S/756 Seimens MXL TWCF
3209-1 Dry Pipe 6” Reliable D Monaco M2 O&M 3209-1 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-1 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-1 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-2 Dry Pipe 4” Reliable D Monaco M2 O&M 3209-2 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-2 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-3 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-3 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-3 Dry Pipe 4” Reliable D Monaco M2 O&M 3209-3 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-3 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-3 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-4 Dry Pipe 6” Reliable D Monaco M2 O&M 3209-4 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-4 Deluge 6” Reliable BX Notifier RP-1001 O&M 3209-4 Deluge 6” Reliable BX Notifier RP-1001 O&M 3211 Wet Pipe 6” Viking F-1 Faraday MPC-1500 Plus TWCF 3211 Deluge 6” Viking E-1 HEF Ansul Auto Pulse 4420 TWCF 3322 Wet Pipe 8” Victaulic Metron FD 4-5 ANG 3322 Wet Pipe 6” Victaulic Metron FD 4-5 ANG 3333 Deluge 6” Viking E-1 AFFF Simplex 4100 ANG
3333 Deluge 4” Viking E-1
AFFF
Cannons
Simplex 4100 ANG
3333 Wet Pipe 4” Viking H-2 Simplex 4100 ANG 3335 Wet Pipe 8” Kennedy AFFF Simplex 4100 ANG 3335 Wet Pipe 6” Kennedy Simplex 4100 ANG
3336 Wet Pipe 6” Viking J-1
Cannons FCI 72 Series ANG
3336 Deluge 4” Viking E-1 FCI 72 Series ANG 3336 Wet Pipe 4” CSC FCI 7200 ANG 3336 Wet Pipe 4” Viking H-2 FCI 7200 ANG 3370 Wet Pipe 10” Viking 607rw Siemens ID-SP O&M 3370 Wet Pipe 10” Viking 607rw Siemens ID-SP O&M 3370 Deluge 6” Viking 607rw AFFF Siemens ID-SP O&M 3370 Deluge 6” Viking 607rw AFFF Siemens ID-SP O&M 3370 Deluge 6” Viking 607rw AFFF Siemens ID-SP O&M 3370 Deluge 6” Viking 607rw AFFF Siemens ID-SP O&M 3370 Wet Pipe 8” Viking 607rw Siemens ID-SP O&M 3370 Wet Pipe 8” Viking 607rw Siemens ID-SP O&M 3370 Wet Pipe 8” Viking 607rw Siemens ID-SP O&M 3370 Wet Pipe 8” Viking 607rw Siemens ID-SP O&M 3370 Deluge 6” Viking 607rw AFFF Siemens ID-SP O&M
3370 Deluge 6” Viking 607rw AFFF Siemens ID-SP O&M 4401 Deluge 8” Viking 607rw AFFF GE EST Quickstart O&M 4401 Deluge 10” Viking 607rw AFFF GE EST Quickstart O&M 4401 Deluge 10” Viking 607rw AFFF GE EST Quickstart O&M
Building 4401 - AFFF systems &associated panels – coordination is required Scope of work includes the supporting pump house, Building 3102 All alarm panels have a built in transmitter
Table Key
HEF High Expansion Foam AFFF Aqueous Film-Forming Foam
APPENDIX B
SAFETY GUIDE FOR CIVILIAN CONTRACTORS
SAFETY BOOKLET
FOR CIVILIAN CONTR
APPENDIX C
SECURITY REQUIREMENTS
INSTALLATION ENTRY CONTROL PROCEDURES FOR ALL CONTRACTORS
After award of contract, the Contractor shall request through the COR, CO and Security Forces to be issued base passes and identification badges for their employees and work vehicles in accordance with the attached Contractor Security Appendix – 1 Oct 13.
CONTRACTOR
SECURITY APPENDIX
File details come from the government source that posted it. Updated .