Amendment 0003- Modification Document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006-_Modification_Document.pdf | ||
| Amendment_0005-Modification_D0cument.pdf | ||
| Questions_and_Answers-Set_3.docx | DOCX document | |
| AIRFIELD_CONCRETE-21_May_2013.pdf | ||
| Amendment_0004-Modification.pdf | ||
| Questions_and_Answers-Set_2-0003.pdf | ||
| AIRFIELD_CONCRETE-0003.pdf | ||
| Asphalt-DesignBuildSOW-ADDENDUM-0003.pdf | ||
| Amendment_0003-Conformed_Document.pdf | ||
| Airfield_Concrete_Ammendment_0002.pdf | ||
| Amend-01.pdf | ||
| Site_Visit_Minutes-Signed.pdf | ||
| Questions_and_Answers-Site_Visit.docx | DOCX document | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| Past_Performance.pdf | ||
| Environmental_Compliance_Statment.docx | DOCX document | |
| Wage_Determination.docx | DOCX document | |
| Airfield_Pavements_and_lighting_SOW_(Apr_2012).pdf | ||
| Solicitation.pdf | ||
| Summary.pdf | ||
| Questions_and_Answers-Synopses.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is the following:
A. Add Addendum 1, Airfield Asphalt Specifications
B. Add CLINS 0001AR-0001AW, 1001AR-1001AW, and 2001 AR- 2001AW for added Asphalt Specifications
C. Add revised Airfield Specification dated 29 April 2013
D. Corrected SF 1442, Block 11 from 360 days to 365 days
E. Add Performance and Payment bonds are required as per SF 1442, Block 12A within 10 days after award
F. Add Clause 52.228-15, Performance and Payment Bonds- Construction; Add Clause 52.215-5, Facsimile Proposals by full text; Add Clause
52.222-5, Davis-Bacon Act-Secondary Site of the Work by full text
G. Incorporate Question and Answers Set 2
H. Extend the response date from 22 May 2013 at 12:00 PM EST to 24 May 2013 at 1200 PM EST.
I. All other terms and conditions remain the same
***See Summary of Changes***
1. CONTRACT ID CODE PAGE OF PAGES
J 1 50
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4484-13-R-0010
X 9B. DATED (SEE ITEM 11)
01-Apr-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2013
CODE
87 CONS/LGC
2402 VANDENBERG AVE
JB MCGUIRE-DIX-LAKEHURST NJ 08641
FA4484 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4484-13-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 22-May-2013 12:00 PM to 24-May-
2013 12:00 PM.
The performance payment bonds has changed from No to Yes.
The contractor period of performance end date has increased by 5 days from 360 days to 365 days.
The performance payment bonds calendar days 10 has been added.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The option status has changed from No Status to Option.
CLIN 1001
CLIN 2001
SUBCLIN 0001AR is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AR 2,000 Square
Yard
Base Year
FFP
Provide and install asphalt surface 3" thick
FOB: Destination
NET AMT
SUBCLIN 0001AS is added as follows:
0001AS 1,000 Square
Fill potholes/leveling course ****Measured in Square Yard Inches****
SUBCLIN 0001AT is added as follows:
0001AT 1,000 Cubic
Provide and install new base course material
SUBCLIN 0001AU is added as follows:
0001AU 2,000 Linear
Foot
Seal cracks > 1/8"
SUBCLIN 0001AV is added as follows:
0001AV 12,000 Square
Remove/dispose asphalt pavement partial depth ***Measure in Square Yard
Inches***
SUBCLIN 0001AW is added as follows:
0001AW 1,000 Cubic
Remove and dispose base course material
SUBCLIN 1001AR is added as follows:
1001AR 2,000 Square
OPTION Option Year 1
SUBCLIN 1001AS is added as follows:
1001AS 1,000 Square
Fill potholes/leveling course ***Measured in Sqaure Yard Inches***
SUBCLIN 1001AT is added as follows:
1001AT 1,000 Cubic
SUBCLIN 1001AU is added as follows:
1001AU 2,000 Linear
SUBCLIN 1001AV is added as follows:
1001AV 12,000 Square
Remove/dispose asphalt pavement partial depth ***Measured in Square Yard
Inches***
SUBCLIN 1001AW is added as follows:
1001AW 1,000 Cubic
SUBCLIN 2001AR is added as follows:
2001AR 2,000 Square
OPTION Option Year 2
SUBCLIN 2001AS is added as follows:
2001AS 1,000 Square
Fill potholes/leveling course ***Measure in Square Yard Inches***
SUBCLIN 2001AT is added as follows:
2001AT 1,000 Cubic
SUBCLIN 2001AU is added as follows:
2001AU 2,000 Linear
SUBCLIN 2001AV is added as follows:
2001AV 12,000 Square
Remove/dispose asphalt pavement partial depth
***Measure in Square Yard Inches***
SUBCLIN 2001AW is added as follows:
2001AW 1,000 Cubic
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
ADDENDUM-SOW
ADDENDUM 1 to Solicitation Number: FA4484-13-R-0010
SPECIFICATIONS
FOR
CONSTRUCTION AND REPLACEMENT OF
CONCRETE PANELS, AIRFIELD ASPHALT AND MISCELLANEOUS AIRFIELD LIGHTING
AT
JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY
Changes to existing specifications are in bold and italicized. New specifications are added without bold or italics.
TABLE OF CONTENTS
SECTION TITLE PAGES
DIVISION 1 GENERAL REQUIREMENTS
01000 Statement of Work 01000-1 thru 01000-2
DIVISION 2 - SITE WORK
02485 Topsoil and Seeding 02485-1 thru 02485-5
02551 Bituminous Paving for Runways and Taxiways 02551-1 thru 02551-10
02558 Bituminous Tack Coat 02558-1 thru 02558-3
02559 Bituminous Prime Coat 02559-1 thru 02559-3
02561 Asphalt Slurry Seal 02561-1 thru 02561-7
02616 Resurfacing 02616-1 thru 02616-12
DIVISION 1
GENERAL REQUIREMENTS
SECTION 01000
STATEMENT OF WORK
PART I - GENERAL
1.1 DESCRIPTION OF WORK: The Contractor shall provide all plant, supervision, management, quality control, labor, tools, equipment, appliances and materials and perform all work necessary to design, construct and repair concrete airfield apron or asphalt runways and taxiways in strict accordance with the specifications and drawings forming parts thereof, subject to the terms and conditions of the contract. The description of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, and material required by the specifications and drawings to perform a complete and permanent job to adequately fulfill the intent of these specifications and to deliver a work product(s) that is fit for its intended purpose. The inspection clause of any resultant contract for this work shall not in any way be interpreted as waiving the Government’s requirement that the work product(s) be fit for its intended purpose.
1.2 LOCATION: The work site is located at various locations on the airfields of Joint Base McGuire-Dix-
Lakehurst, NJ (JB MDL) and will be site determined as appropriate and according to contract terms.
1.3 PRINCIPAL FEATURES: The work to be performed includes the principal features listed below. This general outline of principal features does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, and material required by the specifications and drawings to perform a complete and permanent job to adequately fulfill the intent of these specifications and to deliver a work product(s) that is fit for its intended purpose. The inspection clause of any resultant contract for this work shall not in any way be interpreted as waiving the Government’s requirement that the work product(s) be fit for its intended purpose. The scope of work includes but is not limited:
A. Replace whole and partial concrete slabs - full depth. This task includes demolition, preparation of sub base, and installation of new concrete panels ranging in size from 15’ by 10’ by 8” depth to 25’ by 25’ by
18” depth. Concrete panels shall be complete with compacted sub base, dowels, joint seal and finishing.
Bid pricing shall be based on CY of concrete.
B. Demolition of concrete or asphalt. This task shall include demolition of existing paved surfaces and restoration of disturbed area to existing grade with established turf. Bid pricing shall be in CY of in-place material prior to removal.
C. Rout and seal or reseal joints. This task is for routing and joint sealing of existing joints on airfield apron or asphalt areas. Joint formed by new slabs under this contract are excluded from this task. Bid pricing shall be in LF of joint seal.
D. Repair concrete spalls. This task includes repair of concrete spalls, edge spalls, corner spalls, and removal of bituminous patching and repairs as spalls. All are partial depth. Bid pricing shall be in SF of spall area.
E. Airfield Striping. Provide and install new pavement striping as needed to match existing. Bid pricing shall be in SF of painted surface, plus one mobilization charge for each delivery order.
F. Crack Repair. Repair large cracks by routing and sealing. Repair small hairline cracks by sealing per specifications. Bid pricing shall be in LF of crack.
G. Tie-downs, ground rods and embedded items. Replace steel embedded rods and anchors when encountered during a slab or asphalt replacement. Bid pricing shall be for each.
H. Methacrylate Treatment. Provide methacrylate seal coating where indicated. Bid pricing shall be on a SF basis.
I. Light Cans. Where indicated, replace light cans where encountered in slab or asphalt replacements per specifications. Bid pricing shall be for each one installed.
J. New 4” Conduit. Where indicated, replace 4” conduit in slab or asphalt replacement areas, per specifications. Bid pricing shall be for LF of conduit.
K. New Counterpoise. Where indicated, replace counterpoise in slab or asphalt replacement areas, per specifications. Bid pricing shall be for LF of counterpoise.
L. Replace Manhole Rings. When manhole tops are not flush with grade within slab or asphalt replacements, manhole lids shall be raised, lowered, or replaced to meet grade. Bid pricing shall be for each one indicated.
M. Repair asphalt shoulders. Asphalt repairs shall be as indicated and specified, and shall be based on a minimum order of square yards, 2” deep, and shall be priced in square yard inches (SYI).
N. Provide and install new asphalt surface course
O. Provide and install new base course material
P Seal asphalt cracks greater than 1/8”
Q Remove and dispose of existing asphalt pavement (partial depth)
R. Remove and dispose of existing asphalt pavement (full depth)
S. Remove and dispose of existing base course material
1.4 INVESTIGATION, DESIGN AND QUALITY CONTROL SERVICES: Investigation and engineering services are for verification of exact amounts of specific construction services required such as: amount of concrete slabs or asphalt requiring replacement; locations and square footage of spall repairs; linear footage of joint sealing;
and linear feet of striping required. The repair methods and quality control requirements are to be provided based on criteria in UFC 3-260-01, and UFC-3-260-02. Services are required to verify proposed government solutions with
UFC criteria and provide recommendations for compliance. Other services are required to assure construction work is performed, tested, and accepted in accordance with UFC and other applicable Air Force criteria. These services shall be priced in the line items listed in paragraph 1.3 and consist of the following:
1. Prepare, enforce, and report compliance with the Construction Quality Control Plan for construction work.
2. Perform inspection and testing services in accordance with the Construction Quality Control Plan.
3. Review and recommend acceptance, or rejection, of contract required submittals.
4. Maintain good rapport, coordination, and communications with other agencies and organizations involved in or which have an interest in the project. The contractor shall coordinate, on a daily basis, with BCE’s
Chief of Construction (or designated representative). Provide proactive, timely notice to the Government of any major issues, potential modifications, or other items of concern.
5. The contractor’s engineering representative shall become familiar with the local military installation regulations and will monitor the construction contractor’s compliance with these regulations. This representative is responsible for assisting the Air Force in coordinating activities with associated Base agencies to facilitate construction of this project. This includes, but is not limited to, Security Forces, Flight Line and Flight Operations Personnel, Civil Engineering Maintenance and Utility Shops, Communications Personnel, Contracting Personnel, Fire Department Personnel, and Wing Safety
Personnel. Special emphasis shall be coordination of work within the restricted area, and all areas of the airfield.
DIVISION 2
SITEWORK
SECTION 02485
TOPSOIL AND SEEDING
PART 1 – GENERAL
1.01 SCOPE OF WORK: This section covers all labor, materials, and equipment necessary to do all loaming, seeding, and related work as indicated on the drawings and/or as herein specified.
1.02 RELATED WORK: Section 02223, Backfilling
1.03 QUALITY ASSURANCE
A. For a particular source of loam, the Contracting Officer may require the Contractor to send approximately ten pounds of loam to an approved testing laboratory and have the following tests conducted:
1. Organic concentration
2. PH
3. Nitrogen concentration
4. Phosphorous concentration
5. Potash concentration
B. These tests shall be at the Contractor’s expense. Results and soil conditioning and fertilizing recommendations shall be forwarded to the Contracting Officer.
1.04 SUBMITTALS: In accordance with requirements of general specifications, submit the following to the
Contracting Officer:
A. Three sets of shop drawings detailing the seed mixes, fertilizer, mulch material, slope protection material (if required) and origin of loam.
B. Three sets of test results.
PART 2 – PRODUCT
2.01 LOAM
A. Loam shall be a natural, fertile, friable soil, atypical of productive soils in the vicinity, obtained from naturally well-drained areas, neither excessively acidic nor alkaline, and containing no substance harmful to grass growth. Loam shall not be delivered to the site in frozen or muddy condition and shall be reasonably free of stumps, roots, heavy or stiff clay, stones larger than one inch in diameter, lumps, coarse sand, noxious weeds, sticks, brush or other litter.
B. The loam shall contain not less than four percent nor more than 20 percent organic matter as determined by the loss of weight at a temperature of 230 degrees Fahrenheit.
2.02 LIME: Lime shall be standard commercial ground limestone containing at least 50 percent total oxides
(calcium oxide and magnesium oxide). Fifty percent of the material must pass through No. 100 mesh sieve and 98 percent passing a No. 2 mesh sieve.
2.03 FERTILIZER
A. Fertilizer shall be commercial, 10-10-10 fertilizer mixture containing at least 40 percent of organic nitrogen. It shall be delivered to the site in the original sealed containers, each showing the manufacturer’s guaranteed analysis. Store fertilizer so that when used is shall be dry and free flowing.
No fertilizer shall be used which has not been marketed in accordance with provisions of the General
Laws, Chapter 94, as amended, relating to fertilizers.
B. Fertilizer shall be applied in the slurry mix for hydro-seeding and shall have an analysis conforming to the following:
Constituent % Passing by Weight
Nitrogen (N) 13
Phosphorous (P) 13
Potassium (K) 13
C. Fertilizer shall be delivered in manufacturer’s standard container printed with manufacturer’s name, material, weight, and guaranteed analysis.
2.04 MULCH: Materials to be used in mulching shall conform to the following requirements:
A. Hay Mulch: shall consist mowed and properly cured grass or legume, reasonable free from swamp grass, weeds, twigs, debris or other deleterious material. It shall be free from rot or mold and shall be acceptable to the Contracting Officer. Mulch shall be mixed with other ingredients. No salt hay shall be used.
B. Straw Mulch: shall consist of stalks or stems of grain after threshing.
C. Wood Fiber Mulch for hydro-seeding slurry: shall be composed of virgin wood, contain green color additive, be weed free, and non-polluting, containing no germination of growth-inhibiting factors, similar to Hydromulch, manufactured by Conwed Corporation, St. Paul, Minnesota or approved equal.
Manufacturer listed is for quality only. Additionally, it should consist of wood fiber produced from clean, whole uncooked wood, formed into resilient bundles having a high degree of internal friction and shall be dry when delivered to the project.
D. Wood Fiber Mulch for landscaping: shall consist of commercially available, hand-placed bundles of pine bark mulch, cedar chip mulch, shredded hardwood mulch and/or licorice root.
2.05 SEED
A. Seed shall be of an approved mixture, previous year’s crop, clean, high in germinating value, and low in weed seed. Seed shall be obtained from a reliable seed company and shall be accompanied by certificates relative to mixture purity and germinating value.
B. Grass seed shall conform to the following requirements:
% by Weight Minimum %
Minimum%
Name of Seed
In Mixture Purity
Germination
Festuca elatior “Kentucky 31”
“Kentucky “31 Tall Fescue……………………..25 97
Poa pratensis Common
Kentucky Bluegrass …………………….…35 85 80
Lolium Multi-florum
Annual Ryegrass…………………………………20 95 90
Festuca rubra – “Ruba”
Creeping Red Fescue…………………………….20 97 85
PART 3 – EXECUTION
3.01 SURFACE PREPARATION
A. Where required by the Contracting Officer, Contractor shall apply new topsoil, fertilizer, and seed according to this specification. After approval of rough grading, loam shall be placed on areas affect by the Contractor’s operations. Loam shall be at least four inches thickness.
B. Lime shall be applied to bring the pH to 6.5 or, without a soil test, at the rate of 1000 pounds per acre.
Application of lime shall be reduced when placed around plantings of Azalea, Rhododendron, Laurel and other acid loving plants.
C. Fertilizer shall be applied according to the soil test, or without a soil test, at the rate of 1000 pounds per acre.
D. Loam shall be worked a minimum of three inches deep, thoroughly incorporating the lime and fertilizer into the soil. The loam shall then be raked until the surface is finely pulverized and smooth and compacted with rollers, weighing not over 100 pounds per linear foot of tread, to an even surface conforming to the prescribed lines and grades. Minimum depth shall be four inches after completion.
3.02 SEEDING
A. Seeding shall be done when weather conditions are approved as suitable, in the periods between April 1 and May 30 or August 15 to October 1, unless otherwise approved.
B. If there is delay in seeding, during which soil is washed out, the Contractor shall replace the soil before sowing the seed, without additional compensation.
Immediately before the seeding is started, the soil shall be lightly raked.
C. Seed shall be sown at the approved rate, on a calm day by machine. Water seeding will be permitted following approval by the Contracting Officer.
D. One-half of the seed shall be sown in one direction and the other half at right angles. Seed shall be raked lightly into the soil to a depth of quarter inch and rolled with a roller weighing no more than 100 pounds per linear foot of tread.
E. The surface shall be kept moist by a fine spray until the grass shows uniform germination over the entire area. Wherever poor germination occurs in areas larger than four square feet, the Contractor shall reseed, roll, and water as necessary to obtain proper germination.
F. The Contractor shall water, weed, cut and otherwise maintain and protect seeded areas as necessary to produce a dense, healthy growth of perennial lawn grass.
3.03 PLACING MULCH
A. Hay or straw mulch shall be loosely spread to a uniform depth over all areas designated on the plan, at the rate of four and a half tons per acre, or as otherwise directed.
B. Hay or straw mulch may be applied by mechanical apparatus, if in the judgment of the Contracting
Officer the apparatus spreads the mulch uniformly and forms a suitable mat to control slope erosion. The apparatus shall be capable of spreading as least 80 percent of the hay or straw in lengths of six inches or more, otherwise it shall be spread by hand without additional compensation.
C. Wood fiber mulch may be uniformly spread over all areas designated on the plants at the minimum rate of 1,400 pounds per acre instead of hay or straw mulch, at the option of the Contractor. It shall be placed by spraying from an approved spraying machine that has sufficient pressure to cover the entire area in one operation.
D. In all planting areas designated by the Contracting Officer, Contractor shall hand place landscaping mulch to a depth indicated by the Contracting Officer. Depth of mulch shall be a minimum of three inches compacted and a maximum of five inches compacted. Quantity of landscaping mulch shall be paid under the appropriate line item within the contract, per cubic foot of placement. Quantities shall be calculated by measuring the area to be treated in linear feet of length and width, to the nearest quarter foot, and multiplying this area by the average compacted depth to the nearest one inch. Type of mulch shall be determined by the Contracting Officer.
3.04 SEEDING AND MULCHING BY SPRAYING MACHINE
A. The application of lime, fertilizer, grass seed and mulch may be accomplished in one operation by the use of an approved spraying machine. The materials shall be mixed with water in the machine and kept in an agitated state in order that the materials may be uniformly suspended in the water. The spraying equipment shall be so designed that when the solution is sprayed over an area, the resulting deposits of lime, fertilizer, grass seed and mulch shall be equal to the specified quantities.
B. A certified statement shall be furnished, prior to start of work, to the Contracting Officer by the Contractor as to the number of pounds of limestone fertilizer, grass seed and mulch per 100 gallons of water.
C. This statement should also specify the number of square yards of seeding that can be covered with the solution specified above. If the results of the spray operation are unsatisfactory, the Contractor will be required to abandon this method and apply the lime, fertilizer, grass seed and mulch by other methods.
END OF SECTION 02485
SITE WORK
SECTION 02551
BITUMINOUS PAVING FOR RUNWAYS AND TAXIWAYS
1.01 SCOPE OF WORK: This section of the specification covers the requirements for bituminous paving for roads, streets, and open storage areas on an “on-call” basis when directed by the Contracting Officer or an authorized representative.
1.02 REFERENCES: The publications listed below, current as of the date of this solicitation, form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
A. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 88 Soundness of Aggregates by Use of Sodium Sulfate or
Magnesium Sulfate
ASTM C 131 Resistance to Degradation of Small Size Coarse Aggregate by
Abrasion and impact in the Los Angeles Machine
ASTM C 136 Sieve Analysis of Fine and Coarse Aggregates
ASTM C 618 Fly Ash and Raw or Calcined Natural Portland Cement
Concrete
ASTM D 75 Sampling Aggregates
ASTM D 140 Sampling Bituminous Materials
ASTM D 2216 Laboratory Determination of Water (Moisture) Content of Soil and Rock
ASTM D 3381 Viscosity-Graded Asphalt Cement for Use in Pavement
Construction
ASTM D 4791 Flat or Elongated Particles in Course Aggregate
B. NJDOT STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES
1.03 SUBMITTALS: The following shall be submitted in accordance with the requirements of the contract:
Coarse and Fine Aggregate; Bituminous Material; Fly Ash: Copies of test results and viscosity tests run after mixing and 15 and 30 minutes thereafter
1.04 PLANT, EQUIPMENT, MACHINES, AND TOOLS: Plant, equipment, machines, and tools shall be in accordance with Section 404 of the New Jersey Department of
Transportation Standard Specifications for Road and Bridges, latest version.
1.05 SAMPLING AND TESTING
A. Aggregates:
1. General: ASTM D 75 shall be used in sampling coarse and fine aggregates. The Contracting
Officer will designate points of sampling. The Contractor shall make all tests necessary to determine compliance with the specified requirements.
2. Sources: Sources of aggregates shall be selected well in advance of the time that the materials are required in the work. Samples shall be submitted 30 days before starting production. If a sample of material fails to meet specification requirements, the material represented by the sample shall be replaced, and the cost of testing the replaced sample shall be at the expense of the Contractor. Approval of the source of the aggregate does not relieve the Contractor of the responsibility to deliver aggregates that meet the specified requirements.
B. Bituminous Materials: Samples of bituminous materials shall be obtained in accordance with ASTM D
140. Sources shall be selected in advance of the time materials will be required for the work. In addition to the initial qualification testing of bituminous materials, samples shall be obtained and tested before and during construction when shipments of bituminous materials are received, or when necessary to assure that some condition of handling or storage has not been detrimental to the bituminous material.
1.06 DELIVERY, STORAGE, AND HANDLING OF MATERIALS
A. Mineral Aggregates: Mineral aggregates shall be delivered to the site of the bituminous mixing plant and stockpiled in such a manner as to preclude segregation or contamination with objectionable material.
B. Bituminous Materials: Bituminous materials shall be maintained below a temperature of
300 degrees F during storage and shall not be heated by the application of a direct flame to the walls of storage tanks or transfer lines. Storage tanks, transfer lines, and weigh buckets shall be thoroughly cleaned before a different type or grade of bitumen is introduced into the system.
1.07 ACCESS TO PLANT AND EQUIPMENT: The Contacting Officer shall have access at all times to all parts of the bituminous plant for checking adequacy of any equipment in use; inspecting operation of the plant; verifying weights, proportions, and character of materials; and checking temperatures maintained in preparation of the mixtures.
PART II MATERIALS
2.1 AGGREGATES
Aggregates shall consist of crushed stone, crushed gravel, crushed slag, screenings, natural sand and mineral filler, as required. The portion of material retained on the No. 4 sieve is coarse aggregate. The portion of material passing the No. 4 sieve and retained on the No. 200 sieve is fine aggregate. The portion passing the No. 200 sieve is defined as mineral filler. All aggregate test results and samples shall be submitted to the Contracting Officer/Engineer at least 14 days prior to start of construction. Aggregate testing shall have been performed within 90 days of performing the mix design.
2.1.1 Coarse Aggregate
Coarse aggregate shall consist of sound, tough, durable particles, free from films of material that would prevent thorough coating and bonding with the asphalt material and free from organic matter and other deleterious substances. The coarse aggregate particles shall meet the following requirements:
a. The percentage of loss shall not be greater than 40 percent after 500 revolutions when tested in accordance with ASTM C 131.
b. The sodium sulfate soundness loss shall not exceed 12 percent, or the magnesium sulfate soundness loss shall not exceed 18 percent after five cycles when tested in accordance with ASTM C 88.
c. At least 75 percent by weight of coarse aggregate shall have at least two or more fractured faces when tested in accordance with COE CRD-C 171. Fractured faces shall be produced by crushing.
d. The particle shape shall be essentially cubical and the aggregate shall not contain more than 20 percent, by weight, of flat and elongated particles (3:1 ratio of maximum to minimum) when tested in accordance with ASTM D 4791.
e. Slag shall be air-cooled, blast furnace slag, and shall have a compacted weight of not less than 75 lb/cu ft when tested in accordance with ASTM C 29/C 29M.
f. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C 142.
2.1.2 Fine Aggregate
Fine aggregate shall consist of clean, sound, tough, durable particles. The aggregate particles shall be free from coatings of clay, silt, or any objectionable material and shall contain no clay balls. The fine aggregate particles shall meet the following requirements:
a. The quantity of natural sand (noncrushed material) added to the aggregate blend shall not exceed 15 percent by weight of total aggregate.
b. The individual fine aggregate sources shall have a sand equivalent value greater than 45 when tested in accordance with ASTM D 2419.
c. The fine aggregate portion of the blended aggregate shall have an uncompacted void content greater than 45.0 percent when tested in accordance with ASTM C 1252 Method A.
d. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C 142.
2.1.3 Mineral Filler
Mineral filler shall be nonplastic material meeting the requirements of ASTM D 242.
2.1.4 Aggregate Gradation
The combined aggregate gradation shall conform to gradations specified in Table 6, when tested in accordance with ASTM C 136 and ASTM C 117, and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa, but grade uniformly from coarse to fine. Gradation 1 shall be used for underlying HMA layers. Gradation 2 shall be used for surface courses.
Table 6. Aggregate Gradations
Gradation 1 Gradation 2
Percent Passing Percent Passing Sieve Size, inch by Mass by Mass
1 100 --- 3/4 76-96 100 1/2 68-88 76-96 3/8 60-82 69-89
No. 4 45-67 53-73 No. 8 32-54 38-60 No. 16 22-44 26-48 No. 30 15-35 18-38 No. 50 9-25 11-27
No. 100 6-18 6-18 No. 200 3-6 3-6
2.2 ASPHALT CEMENT BINDER
Asphalt cement binder shall conform to AASHTO M 320 Performance Grade (PG) 76-22 for runway and taxiway pavement surface courses; PG 64-22 for underlying layers and shoulder pavement surface courses. Test data indicating grade certification shall be provided by the supplier at the time of delivery of each load to the mix plant. Copies of these certifications shall be submitted to the COTR. The supplier is defined as the last source of any modification to the binder. The COTR may sample and test the binder at the mix plant at any time before or during mix production. Samples for this verification testing shall be obtained in accordance with ASTM D 140 and in the presence of the COTR. These samples shall be furnished to the COTR for the verification testing, which shall be at no cost to the Contractor. Samples of the asphalt cement specified shall be submitted for approval not less than 14 days before start of the test section.
2.3 MIX DESIGN
Develop the mix design. The asphalt mix shall be composed of a mixture of well-graded aggregate, mineral filler if required, and asphalt material. The aggregate fractions shall be sized, handled in separate size groups, and combined in such proportions that the resulting mixture meets the grading requirements of the job mix formula (JMF). No hot-mix asphalt for payment shall be produced until a JMF has been approved. The hot-mix asphalt shall be designed using hand-held hammer procedures contained in AI MS-02 and the criteria shown in Table 7. Laboratory compaction temperatures for Polymer Modified Asphalts shall be as recommended by the asphalt cement manufacturer. If the Tensile Strength Ratio (TSR) of the composite mixture, as determined by ASTM D 4867/D 4867M is less than 75, the aggregates shall be rejected or the asphalt mixture treated with an anti-stripping agent. The amount of anti-stripping agent added shall be sufficient to produce a TSR of not less than 75. If an antistrip agent is required, it shall be provided at no additional cost to the Government. Sufficient materials to produce 200 pound of blended mixture shall be provided to the COTR for verification of mix design at least 14 days prior to construction of test section.
2.3.1 JMF Requirements
Submit the job mix formula in writing, for approval, at least 14 days prior to the start of the test section. 75 Blow Mix shall be used for all runway and taxiway pavements in all HMA layers. 50 Blow Mix shall be used for all shoulder pavements. JMF submittals shall include as a minimum:
a. Percent passing each sieve size.
b. Percent of asphalt cement.
c. Percent of each aggregate and mineral filler to be used.
d. Asphalt viscosity grade, penetration grade, or performance grade.
e. Number of blows of hammer per side of molded specimen.
f. Laboratory mixing temperature.
g. Lab compaction temperature.
h. Temperature-viscosity relationship of the asphalt cement.
i. Plot of the combined gradation on the 0.45 power gradation chart, stating the nominal maximum size.
j. Graphical plots and summary tabulation of stability, flow, air voids, voids in the mineral aggregate, and unit weight versus asphalt content as shown in AI MS-02. Summary tabulation shall include individual specimen data for each specimen tested.
k. Specific gravity and absorption of each aggregate.
l. Percent natural sand.
m. Percent particles with two or more fractured faces (in coarse aggregate).
n. Fine aggregate angularity.
o. Percent flat or elongated particles (in coarse aggregate).
p. Tensile Strength Ratio.
q. Antistrip agent (if required).
r. List of all modifiers.
s. Percentage and properties (asphalt content, binder properties, and aggregate properties) of RAP in accordance with paragraph RECYCLED HOT-MIX ASPHALT, if RAP is used.
Table 7. Marshall Design Criteria
Test Property 75 Blow Mix 50 Blow Mix
Stability, pounds minimum 2150 (1)
(1)
Flow, 0.01 inch 8-16 (2)
8-18 (2)
Air voids, percent 4 (4)
(4)
Percent Voids in mineral aggregate
(minimum) See Table 8 See Table 8
Dust Proportion (3)
0.8-1.2 0.8-1.2
TSR, minimum percent 75 75
(1) This is a minimum requirement. The average during construction shall be significantly higher than this number to ensure compliance with the specifications.
(2) The flow requirement is not applicable for Polymer Modified Asphalts
(3) Dust Proportion is calculated as the aggregate content, expressed as a percent of mass, passing the No. 200 sieve, divided by the effective asphalt content, in percent of total mass of the mixture.
(4) Select the JMF asphalt content corresponding to an air void content of 4 percent. Verify the other properties of Table 7 meet the specification requirements at this asphalt content.
Table 8. Minimum Percent Voids in Mineral Aggregate (VMA)(4)
Aggregate (See Table 6) Minimum VMA, percent
Gradation 1 13.0 Gradation 2 14.0 Gradation 3 15.0
(1) Calculate VMA in accordance with AI MS-02, based on ASTM D 2726 bulk specific gravity for the aggregate.
2.3.2 Adjustments to JMF
The JMF for each mixture shall be in effect until a new formula is approved in writing by the COTR. Should a change in sources of any materials be made, a new mix design shall be performed and a new JMF approved before the new material is used. The Contractor will be allowed to adjust the JMF within the limits specified below to optimize mix volumetric properties. Adjustments to the JMF shall be limited to plus or minus 4 percent on the No. 4 and coarser sieves; plus or minus 3 percent on the No. 8 to No. 50 sieves; and plus or minus 1 percent on the No. 100 sieve. Tolerances given above may permit the aggregate grading to be outside the limits shown in Table 6; this is acceptable. Adjustments to the JMF shall be limited to plus or minus 1.0 percent on the No. 200 sieve. The resulting aggregate grading on the No. 200 sieve shall not be outside the limits shown in Table 6. Asphalt content adjustments shall be limited to plus or minus 0.40 of binder content.
If adjustments are needed that exceed these limits, a new mix design shall be developed.
2.4 RECYCLED HOT MIX ASPHALT
Recycled HMA may be used in the JMF for HMA base layers on runways and taxiways and in HMA base and surface layers on shoulders and overuns. Recycled HMA may not be used in HMA surface course on Runways and Taxiways. Recycled HMA shall consist of reclaimed asphalt pavement (RAP), coarse aggregate, fine aggregate, mineral filler, and asphalt cement. The RAP shall be of a consistent gradation and asphalt content and properties. When RAP is fed into the plant, the maximum RAP chunk size shall not exceed 2 inches. The individual aggregates in a RAP chunk shall not exceed the maximum size aggregate of the gradation specified in Table 6. The recycled HMA mix shall be designed using procedures contained in AI MS-02. The job mix shall meet the requirements of paragraph MIX DESIGN. RAP should only be used for shoulder surface course mixes and for any intermediate courses. The amount of RAP shall be limited to 30 percent.
2.4.1 RAP Aggregates and Asphalt Cement
The blend of aggregates used in the recycled mix shall meet the requirements of paragraph AGGREGATES.
The percentage of asphalt in the RAP shall be established for the mixture design according to ASTM D 2172 using the appropriate dust correction procedure.
2.4.2 RAP Mix
The blend of new asphalt cement and the RAP asphalt binder shall meet the dynamic shear rheometer at high temperature and bending beam at low temperature requirements in paragraph ASPHALT CEMENT BINDER. The virgin asphalt cement shall not be more than two standard asphalt material grades different than that specified in paragraph ASPHALT CEMENT BINDER.
PART III - EXECUTION
3.01 WEATHER LIMITATIONS: The bituminous mixture shall not be placed upon a wet surface, in rain, in snow, or when the surface temperature of the underlying course is less than 50 degrees F. The Contracting Officer may waive the temperature requirements.
Once the bituminous mixture has been placed and if rain is imminent, protective materials, consisting of rolled polyethylene sheeting at least 4 mils thick of sufficient length and width to cover the mixture shall be placed. If the open graded bituminous mixture becomes saturated, the Contractor shall allow the pavement voids to thoroughly dry out prior to applying the slurry grout.
3.02 PREPARATION OF MIXTURES: Rates of feed of aggregates shall be regulated so that moisture content and temperature of aggregates will be within tolerances specified. Aggregates and bitumen shall be conveyed into the mixer in proportionate quantities required to meet the JMF. Mixing time shall be as required to obtain a uniform coating of the aggregate with the bituminous material. Temperature of bitumen at time of mixing shall not exceed 275 degrees F. Temperature of aggregate in the mixer shall not exceed 300 degrees F when bitumen is added. Overheated and carbonized mixtures or mixtures that foam shall not be used.
3.03 WATER CONTENT OF AGGREGATES: Drying operations shall reduce the water content of mixtures to less than 0.75 percent. Water content shall be determined in accordance with ASTM D 2216; weight of sample shall be at least 500 grams. The water content shall be reported as a percentage of the total mixture.
3.04 STORAGE OF MIXTURE: The open graded bituminous mixture shall not be stored for longer than one hour prior to hauling to the jobsite.
3.05 TRANSPORTATION OF MIXTURE: Transportation from the mixing plant to the jobsite shall be in trucks having tight, clean, smooth beds lightly coated with an approved releasing agent to prevent adhesion of mixture to truck bodies. Diesel fuel shall not be used as a releasing agent. Excessive release agent shall be drained prior to loading. Each load shall be covered with canvas or other approved material of ample size to protect mixture from the weather and to prevent loss of heat. Loads that have crusts of cold, unworkable material or have become wet will be rejected. Hauling over freshly placed material will not be permitted.
3.06 SURFACE PREPARATION OF UNDERLYING COURSE: Prior to placing of open graded bituminous mixture, the underlying course shall be cleaned of all foreign or objectionable matter with power brooms and hand brooms. All base surfaces to receive a bituminous surface course shall be compacted and treated with a uniform coating of a low viscosity Prime Coat IAW Section 02559 of this specification. All surface preparation of the underlying course shall be provided at no additional cost to the Government.
3.07 TACK COATING: Tack Coating is required when pavement is to be constructed over any stable, impervious contact surface. In all other cases, Prime Coating is required. Contact surfaces of previously constructed pavement shall be sprayed with a coat of bituminous Tack Coat IAW Section 02558 of this specification. Tack Coating and Prime Coating shall be provided at no additional cost to the Government.
3.08 JOINTS
A. Joints between successive lanes or RMP shall be made in such a manner as to ensure a continuous bond between the paving lanes. All RMP joints shall have the same texture, density, and smoothness as other sections of the course.
B. Joints between the RMP and any surrounding pavement surfaced with bituminous concrete or Portland cement concrete shall be saw cut to one-half of the RMP thickness and filled with a joint sealant material approved by the Contracting Officer.
3.09 ACCEPTABILITY OF WORK
A. Routine testing for acceptability of work shall be performed by the Contractor and approved by the
Contracting Officer. Additional tests required to determine acceptability of non-conforming material shall be performed by the Contractor at the expense of the Contractor. When a section of pavement fails to meet the specification requirements, that section shall be totally removed and replaced at the
Contractor’s expense. The Contracting Officer reserves the right to sample and test any area which appears to deviate from the specification requirements.
B. Field sampling of RMP materials shall be performed IAW Section 404 of the New Jersey Department of Transportation Standard Specification for Road and Bridge Construction, latest edition.
C. Thickness and Surface-Smoothness Requirements shall be IAW Section 404 of the New Jersey
Department of Transportation Standard Specification for Road and Bridge Construction, latest edition.
1. The thickness of the RMP shall meet the requirement shown on any applicable contract drawings, in the specification, and within the bid items of the contract. The measured thickness of the
RMP shall not exceed the design thickness by more than half-inch thickness, or be deficient in thickness by more than an eight-inch.
2. Surface smoothness shall be IAW Section 404 of the New Jersey Department of Transportation
Standard Specification for Road and Bridge Construction, latest edition.
D. All test samples shall be inspected for percentage of coverage of tack and prime coating at each interfacial junction. Total coverage of tack and prime coatings shall not be less than 95% of the sampled surface area.
END OF SECTION 02551
SECTION 02558
BITUMINOUS TACK COAT
1.01 SCOPE OF WORK: This section of the specification covers the requirements for bituminous tack coat for roads, streets, and open storage areas on an “on-call” basis when directed by the Contracting Officer or an authorized representative.
1.02 REFERENCES: The publications listed below, current as of the date of this solicitation, form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION
OFICIALS (AASHTO)
AASHTO M 81 Cut-Back Asphalt (Rapid Curing Type)
1.03 PLANT, EQUIPMENT, MACHINES, AND TOOLS
A. General Requirements: All plant, equipment, machines, and tools used in this work shall be subject to approval and shall be maintained in a satisfactory working condition at all times.
B. Bituminous Distributor: The distributor shall have pneumatic tires of such size and number to prevent rutting, shoving, or other damage to the base surface or other layers in the pavement structure. The distributor shall be designed and equipped to spray the bituminous material in a uniform coverage at the specified temperature, at readily determined and controlled rates, with an allowable variation from the specified rate of not more than plus or minus five percent, and at variable widths.
Distributor equipment shall include a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor. The distributor shall be equipped to circulate and agitate the bituminous material during the heating process.
C. Power Brooms and Power Blowers: Power brooms and power blowers shall be suitable for cleaning the surfaces to which the tack coat is to be applied.
D. Storage Tanks: Tanks shall be capable of heating the bituminous material, under effective and positive control at all times, to the required temperature. Heating shall be accomplished by steam coils, hot oil, or electricity. An armored thermometer shall be affixed to the tank so that the temperature of the bituminous material may be read at all times.
1.04 WEATHER LIMITATIONS: Tack coat shall be applied only when the surface to receive the tack coat is dry. Tack coat shall be applied only when the atmospheric temperature in the shade is 50 degrees
Fahrenheit or above and when the temperature has not been below 35 degrees Fahrenheit for the 12 hours prior to application.
PART II – PRODUCTS
2.01 BITUMINOUS MATERIAL: Cutback asphalt shall conform to AASHTO M 81 Grade
RC-70
2.02 TACK COAT MATERIAL: shall be emulsified asphalt, Grade RS-1, conforming to
ASTM D 977.
3.01 PREPARATION OF SURFACE: Tack Coat shall be applied in all cases where the new pavement is being placed over an existing pavement or immovable, impermeable structure. Care shall be taken not to place tack coat over existing manhole covers, catch basins, water or utility valve boxes, etc. Immediately before applying the tack coat, all loose material, dirt, clay, or other objectionable material shall be removed from the surface to be treated. The area to be tacked shall also be dry and clean. All preparation of the surface, to include actual application of tack coat, shall be performed at no additional cost to the government.
3.02 APPLICATION RATE: Bituminous material for the tack coat shall be applied at quantities of not less than
0.05 gallons nor more than 0.15 gallons per square yard of pavement surface. The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contracting
Officer.
3.03 APPLICATION TEMPERATURE: Asphalt application temperature shall provide an application viscosity between ten and 60 seconds, Saybolt Furol. The temperature viscosity relation shall be furnished to the
Contracting Officer.
Liquid Asphalts RC-70 120-200 degrees Fahrenheit*
Paving Grade Asphalts CSS-1 70-160 degrees F
CSS-1h 70-160 degrees F
Emulsions CSS-1 70-160 degrees F
CSS-1h 70-160 degrees F
*These temperature ranges exceed the flash point of the material and care should be taken in their heating.
3.04 APPLICATION: Following preparation and subsequent inspection of the surface, the tack coat shall be applied at the specified rate with uniform distribution over the surface to be treated. All areas and spots missed by the distributor shall be properly treated with the hand spray. Following application of the tack material and prior to application of the succeeding layer of pavement, the tack shall be allowed to cure and to obtain evaporation of any volatiles or moisture. Until the succeeding layer of pavement is placed, the tacked area shall be maintained by protecting the surface against damage and by repairing and re-tacking deficient areas at no additional cost to the Government. If required, clean dry sand shall be spread to effectively blot up any excess bituminous material. No smoking, fires, or flames other than the heaters that are a part of the equipment shall be permitted within 25 feet of heating, distributing, and transferring operations of bituminous material other than bituminous emulsions.
3.05 PAYMENT: Payment for all…