Attachment 5 - REVISED Performance Work Statement.docx
DOCX document 4 MB Posted
- Attached to
- B1231 Water Damage Restoration
- Solicitation number
- FA446025Q0303
About this file
This Performance Work Statement (PWS) details water and storm damage restoration services for Building 1231 at Little Rock Air Force Base in Arkansas. The project involves comprehensive restoration of 13 rooms and a hallway, totaling 5,138 square feet, damaged by a water line breakage during a winter storm. Specific restoration requirements include removing wet sheetrock and insulation, drying rooms, applying antimicrobial solutions, replacing drywall with fire-code compliant materials, repainting, and cleaning carpets. The contractor must complete moisture, mildew, and mold remediation within 60 days of contract award, using specialized equipment such as air movers, dehumidifiers, wall cavity dryers, and air purifiers. The work must comply with Fire Code, GA-214, and ANSI/IICRC S500 standards, with a 12-month warranty on all materials and workmanship. The Department of the Air Force Air Mobility Command is seeking a contractor to perform these restoration services using Lowest Price Technically Acceptable procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA - 19 CES - B1231 Water Damage_.docx | DOCX document | |
| QA - 19 CES - B1231 Water Damage_.docx | DOCX document | |
| Attachment 4 - Instrustions to offer.docx | DOCX document | |
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 2 - Clauses.pdf | ||
| Attachment 1 - Performance Work Statement.docx | DOCX document | |
| COMBO - 19 CES - B1231 Water Damage.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
RESTORATION SERVICE FOR WATER AND STORM DAMAGE BLDG. 1231
LITTLE ROCK AIR FORCE BASE, ARKANSAS 72099
1. DESCRIPTION OF SERVICES
1.1. The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to provide water and storm damage restoration in bldg. 1231 at Little Rock Air Force Base Arkansas, 72099. All work will be conducted in a satisfactory manner to fully restore the facility to its pre-water damaged condition. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall follow all Federal, State and local regulations, codes and license requirements. Moisture, mildew, mold remediation and wall repairs shall be accomplished in 60 days of award.
1.2. The requirements official has determined that none of the services to be performed are inherently governmental.
2. SAFETY AND REGULATORY REQUIREMENTS
2.1. General work area is located on Little Rock AFB. Work will be performed at facility 1231. Escort shall be provided by the user (as needed).
2.2. Pre-Install Requirements: Before services are commenced, the contractor shall inspect the work site and ascertain all information for the diligent performance of the service(s). The contractor shall notify the mission owner of any conditions that prevent the suitable completion of these services to include operations that could endanger Government personnel or property and require appropriate abatement action. If the contractor discovers problems associated with the work after starting, he or she shall immediately notify the Contracting Officer (CO) for their approval if the work is to continue. Coordinate with the Government designated representative to coordinate work and have utilities/fire alarms etc…turned on or off during the completion of the task.
2.3. Disposal of waste: All waste disposal is the responsibility of the Little Rock AFB except hazardous material used by the contractor for their equipment. Coordinate through your government representative or COR.
2.4. All work/materials shall be accomplished in accordance Fire Code, GA-214, and ANSI/IICRC S500 standard for professional water damage restoration and with all regulations regarding facility restorations.
3. WORK REQUIREMENTS
3.1. The contractor shall provide all qualified personnel, transportation, tools, equipment, materials, services, and incidentals needed to expeditiously accomplish work in 13 rooms and hallway in bldg. 1231. This will include but not limited to air movers, dehumidifiers, wall cavity dryers, air purifiers, trash bags, and any water damage restoration specific equipment.
3.2. Remove damaged/wet sheetrock on 3 walls in room 161 (2 interior walls and mechanical room wall); remove all wet insulation. Remove damaged/wet sheetrock in remaining 12 rooms and insulation from 2ft down to below base board and length of walls (see attach Facility Square Feet Restoration Data). Also, contractor must place protective barrier on floor and carpets prior to work start and clean up any debris from repairs. Finally, carpets will be cleaned and apply antimicrobial/mold prevention solution.
3.3. Contractor shall dehumidify/dry rooms, carpets and apply antimicrobial solution to prevent mold/mildew within walls and carpets prior to painting.
3.4 Drywall replacement will be Fire Code 5/8 inch gypsum board, tape and mud to GA-214 finish without seems, holes, or repair anomalies present. Replace damaged insulation in rooms to match previous batt insulation (see attached Floor Plan).
3.5. Replace any damaged cove base and repair holes. Repaint to match existing color with standard primer and paint overcoats to return facility to pre-existing condition once moisture remediation is complete.
3.6. 19 CES/CEOES COR will monitor and approve the effectiveness of the contractor’s performance on any planning and execution under this Statement of Work.
4. GOVERNMENT FURNISHED EQUIPMENT OR SERVICE
4.1. Dumpster for trash only.
5. GENERAL REQUIREMENTS
5.1. Contractor personnel and vehicles must possess appropriate passes. These shall be obtained from Installation Security Forces Pass and ID at the Vehicle Inspection Center.
5.2. The Contractor is subject to all installation fire, safety, security, and traffic regulations.
5.3. The Government contracts on the understanding that the Contractor is complying with applicable laws concerning workplace safety.
5.4. The Contractor is subject to all citations and penalties for violation of applicable workplace safety laws. The burden of compliance rests with the Contractor. Enforcement of workplace safety laws is the responsibility of the agency specified in the applicable law.
5.5. The Contracting Officer may notify the Contractor of hazards in Contractor operations that endanger Government personnel or property and require appropriate action. This provision does not constitute assumption of liability for Occupational Safety and Health compliance on the part of the Government or negate other agency responsibility for enforcement of applicable laws.
5.6. Accident prevention principles must be thoroughly integrated into all operations. Unsafe conditions and practices, as identified by the designated representative, must be corrected immediately.
5.7. Contractor Employees: While on the installation, the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the organization or by wearing appropriate badges containing the organization's name and the employee's name. Contractor personnel must wear issued base identification cards at all times while on the installation.
5.8. Service contracts shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
6.0. WARRANTY
6.1. Contractor shall guarantee all material, workmanship and labor from defects for a period of 12 months from the date of acceptance of the work.
7.0. APPENDIXES
Floor Plan
Facility Square Feet Restoration Data
Bldg 1231 Rooms w/ Water Damage/Restoration
| Rooms |
| Sqft |
| Total |
| Purpose |
| Remarks |
| 182 |
| 13 X 20 |
| 260 |
| Training |
| Dry carpet , repair drywall, replace insulation, and paint |
| 167 |
| 26 X 18 |
| 468 |
| Storage |
| Dry carpet , repair drywall, replace insulation, and paint |
| 163 |
| 17 X10 |
| 170 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 161 |
| 20 X 30 (x3) |
| 1,800 |
| Training |
| Dry carpet, drywall repair, and paint (3 walls to include mech rm) repair |
| 162 |
| 12 X 10 |
| 120 |
| Training |
| Dry carpet , repair drywall, replace insulation, and paint |
| 159 |
| 10 X 10 |
| 100 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 143 |
| 10 X 10 |
| 100 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 142 |
| 10 X 10 |
| 100 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 146 |
| 10 X 8 |
| 80 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 146 |
| 30 X 12 |
| 360 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 148 |
| 24 X 22 |
| 528 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 148 |
| 9 X 4 |
| 36 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 152 |
| 8 X 22 |
| 176 |
| Training |
| Dry carpet , repair drywall, replace insulation, and paint |
| 141 |
| 10 X 10 |
| 100 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| 137 |
| 10 X 10 |
| 100 |
| Office |
| Dry carpet , repair drywall, replace insulation, and paint |
| Hallway |
| 80 X 8 |
| 640 |
Dry carpet , repair drywall, replace insulation, and paint
14 Areas @ Total Sqft
5,138 image1.emf