Performance Work Statement Revision 2.pdf
PDF 302 KB Posted
- Attached to
- Pavement Markings and Signage IDIQ - Amendment 2
- Solicitation number
- FA446025Q0050
About this file
This is a Performance Work Statement (PWS) for Pavement Markings & Signage services at Little Rock Air Force Base (LRAFB) in Arkansas. The contract (Solicitation: FA4460-25-Q0050) is a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) with a base year and four 12-month option years. The contractor will provide all personnel, equipment, and materials to maintain pavement markings and replace or install new traffic signs, following Manual of Uniform Traffic Control Devices (MUTCD) requirements. Key specifications include using standard brown background colors for signs, reflectorized paint for markings, and breakaway steel square sign posts with brown sleeves. Work will be performed between 7:30 am and 4:30 pm Monday through Friday, with traffic control included in the pavement marking line item. The government will conduct quarterly progress meetings and performance assessments, with a warranty period of 1 year for all materials and workmanship.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4460-25-Q0050 PWS REVISION: 2 1
Performance Work Statement for
PAVEMENT MARKINGS & SIGNAGE
Solicitation: FA4460-25-Q0050
18 September 2025
FA4460-25-Q0050 PWS REVISION: 2 2
Table of Contents
1.0 SECTION I: DESCRIPTION OF SERVICES
1.1 General Scope 4
1.2 Benefit to United States Air Force (USAF) 4
1.3 Background 4
1.4 Inherently Governmental Function 5
1.5 Type of Contract 5
1.6 Period of Performance 5
1.7 Place of Performance 5
1.8 Deliverables 5
1.9 Specific Tasks 5
2.0 SECTION II: SERVICE SUMMARY
2.1 General 8
2.2 Performance Evaluation 8
2.3 Government Quality Assurance 8
2.4 Performance Assessment 9
2.5 Quarterly Progress Meetings 9
2.6 Contracting Officer’s Representative 10
2.7 Contractor’s Performance 10
3.0 SECTION III: GOVERNMENT FURNISHED PROPERTY and SERVICES
3.1 Government Furnished Services 11
3.2 Government Furnished Facilities 11
3.3 Government Furnished Property to include Equipment and Material 11
3.4 Contractor Furnished Property and Services 11
4.0 SECTION IV: GENERAL INFORMATION
4.1 General Services 12
FA4460-25-Q0050 PWS REVISION: 2 3
4.2 General Scope 12
4.3 General Information 12
4.4 Security Requirements 12
4.5 Access to Government Facilities 13
4.6 Hours of Operation 13
4.7 Special Qualifications 14
4.8 Post Award Conference/Periodic Progress Meetings 14
4.9 Inspection of Services 14
4.10 Key Personnel 14
4.11 Identification of Contractor Employees 15
4.12 Organizational Conflict of Interest (OCI) 15
4.13 Safety and Regulatory Requirements: 15
4.14 Warranty 16
4.16 Definitions and Acronyms 16
5.0 SECTION V APPENDICES & SPECIFICATIONS
APPENDIX 1 References and Specification 20
APPENDIX 604 Technical Specification 1 21
APPENDIX 718 Technical Specification 2 23
APPENDIX 726 Technical Specification 3 25
APPENDIX WORKLOAD Technical Specification 4 28
FA4460-25-Q0050 PWS REVISION: 2 4
PERFORMANCE WORK STATEMENT (PWS)
PAVEMENT MARKINGS & SIGNAGE
at LITTLE ROCK AFB, AR 72099
SECTION I
1.0 DESCRIPTION OF SERVICES
1.1 General Scope. This is a nonpersonal services contract to provide Pavement markings and signage. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the government
1.1.1 Introduction: The Contractor shall provide all qualified personnel, transportation, lifts, tools, equipment, materials and services required to accomplish the work in this PWS. The work shall be in compliance with all Federal, State and local regulations, codes and contractor must have a minimum of 5-years of experience in pavement markings and signage. Experience shall show that the Contractor has a good working knowledge of Manual for Uniform Traffic Control Devices (MUTCD) requirements related to all pavement markings and signage for streets and parking lots.
Work orders will be issued for each task to be accomplished. Prior to the start of work, material submittals for the following are required:
• Paint technical data and cut sheet
• Sign post technical data and cut sheet - Digging permit required if signpost is installed.
• Methodology of traffic control to accomplish work.
Work shall be accomplished within 60 days of material arrival. Material submittal/estimated delivery date of material is required to be sent to the CO and Contracting Officer Representative (COR) within 15 days of issuance of work order.
1.1.2 Objectives: This Performance Work Statement (PWS) describes the services required to provide Pavement Marking & Signage. These services include:
• Maintain pavement markings
• Replace or install new traffic signs
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) enhancing safety by making navigation easier for personnel and visitors. This upgrade supports mission readiness by ensuring compliance with regulations, maintaining a professional appearance and streamlining base operations.
FA4460-25-Q0050 PWS REVISION: 2 5
1.3 Background: Little Rock Air Force Base (LRAFB) is centrally located in Arkansas, approximately seventeen (17) miles northeast of Little Rock. The facility covers 6,217 acres with a resident population of over 3,300 and a working population of approximately 7,200.
The host unit at Little Rock AFB is the 19th Airlift Wing (19 AW), assigned to the Air Mobility Command's 18th Air Force. The wing provides the Department of Defense the largest C-130 Hercules transport fleet in the world, supplying humanitarian airlift relief to victims of disasters, as well as airdropping supplies and troops into the heart of contingency operations in hostile areas.
Other organizations at Little Rock AFB (LRAFB) include the 189th Airlift Wing of the Arkansas Air National Guard, and the C-130 division of the U.S. Air Force Weapons School. All of these organizations fly the C-130 Hercules.
Little Rock Air Force Base is the fourth largest employer in the state of Arkansas, with a local economic impact of $813.6 million.
1.4 Inherently Governmental Function. The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this PWS.
1.5 Type of Contract: The government will award a Firm Fixed Price Indefinite delivery/indefinite quantity (IDIQ)
1.6 Period of Performance. The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years, from the date of the award.
The Period of Performance reads as follows:
Base Year
Option Year I
Option Year II
Option Year III
Option Year IV
1.7 Place of Performance: The contractor shall perform the services in the PWS at Little Rock Air Force Base, AR.
1.8 Deliverables. See Table 2 in Section V.
1.9. Specific Tasks This is a non-personal services IDIQ contract to provide Pavement Markings and Signage. The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, transportation and other items and services necessary in accordance with this PWS.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. It shall be the responsibility of the Contractor to manage its
FA4460-25-Q0050 PWS REVISION: 2 6
employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the Contracting Officer (CO) immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.
1. General Scope: This contract is for multiple year/multiple locations pavement markings and signage as specified by the Government. The Government will provide the location, scope and time schedule of the work for each task order and Request for Proposal. After services have been completed the Contractor shall provide invoices with the actual quantities for review and approval.
The Contract will provide a vehicle to provide individual work orders with pre-priced line items over the Contract period. Work items included in the Contract are the following:
• Paint removal
• Pavement Markings - Traffic control will not be paid for separately and shall be included in the pavement marking line item. Government will review and approve/disapprove the Contractor’s proposed methodology for traffic control required to accomplish specified work. Total road closures are only acceptable with approval from Government.
• Signage and post
1. General Scope of Services include but not limited to:
4.2.1.1 Pre-Install Requirements: Before services are commenced, the contractor shall inspect the work site and ascertain all information for the diligent performance of the service(s). The contractor shall notify the Contracting Officer Representative (COR) of any conditions that prevent the suitable completion of the services to include operations that could endanger Government personnel or property and require appropriate abatement action. If the contractor discovers problems associated with the work after starting, he or she shall immediately notify the Contracting Officer (CO) for their approval if the work is to continue. If signposts are to be installed the Contractor is required to request a digging permit from the Government.
Disposal of waste: All waste disposals are the responsibility of the contractor to include any fees or permits. Recycling containers will be provided for the operation. Coordinate through your government representative or CO.
SECTION II
2.0 Services Summary
2.1 General
The contractor service requirements are summarized as performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success but do not represent all contract performance requirements. All contract performance requirements in this PWS will be monitored.
FA4460-25-Q0050 PWS REVISION: 2 7
2.2 Performance Evaluation
The performance of a service shall be evaluated to determine whether or not it meets the performance requirements of this contract. The re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate. In the case of issued Corrective Action Reports (CARs), the Contracting Officer (CO) shall take appropriate measures according to inspection of services clause in the contract, i.e., FAR 52.246-4, 52.246-5, or 52.212-4(a). Corrective Action Reports may categorize nonconformance as minor, major or critical IAW the following FAR 46.101 definitions:
“Minor nonconformance” means a nonconformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose or is a departure from established standards having little bearing on the effective use or operation of the supplies or services.
“Major nonconformance” means a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose.
“Critical nonconformance” means a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission.
Performance Objective PWS Reference Performance Threshold SS1. The contractor shall provide pavement markings and signage.
1.2, 2.1 & Technical
Specifications 1-4
100% Inspection: No more than 2 discrepancies per Work Task.
SS2. A period of performance will be provided for each work task depending on size and scope of work.
2.3.1 & 2.3.2 100% Inspection: No more than 1 workday late on scheduled timeline per work task.
2.3 Government Quality Assurance. The government shall inspect and evaluate the contractors’ performance to ensure services are received in accordance with the requirements set forth in this contract. The COR will use the contractor’s work schedule, or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the contractor’s performance. Government surveillance of tasks not listed in the PWS or by methods other than those listed in the PWS (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the CO as a result of the surveillance will be according to the terms of this contract.
2.3.1 The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government may inspect each task as completed and increase the number of quality assurance inspections if deemed appropriate because of repeated failures discovered during surveillance inspections or because of repeated
FA4460-25-Q0050 PWS REVISION: 2 8
customer complaints. Likewise, the government may decrease the number of quality assurance inspections if performance dictates.
2.3.2. When an observation indicates defective contractor performance, the COR will require the contractor’s Contract Manager or representative at the site to initial the observation. The formal process is, when a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the CO a Corrective Action Report (CAR) for issuance to the contactor. The contractor shall respond to the CAR IAW instructions provided and in the CAR. While the formal process of this paragraph addressing unacceptable contractor performance is always available, the Government reserves the right to initiate a less formal process involving the contractor, the COR and the CO meeting together at no additional cost to the Government regarding unacceptable contractor performance.
2.4 Performance Assessment.
2.4.1 Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
2.4.2 Customer Complaints. The COR will receive and investigate all complaints. The COR will be responsible for validating customer complaints. The CO shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor.
Validated customer complaints shall be reperformed, if possible, within 3 business days of notification at no additional cost to the Government IAW the inspection clause of the contract and the direction of the Contracting Officer.
2.4.3 Review of Audits. COR reviews the result of the contractor’s accepted quality management system audits and related quality metrics.
2.4.4 100 Percent Inspection. This method requires the COR to do 100 percent inspection on all tasks performed. Appropriate for tasks that occur infrequently. Usually only deals with Safety and/or Security, unless mandated by an Air Force Instruction (AFI) or industry standard.
2.5 Quarterly Progress Meetings. The CO, Government’s Program Manager (PM), / Services Acquisition Leader (SAL), COR, other government personnel as appropriate, and the contractor shall meet quarterly to discuss the contractor’s performance.
The following issues, at a minimum, shall be discussed:
• Opportunities to improve the contract,
• Any modifications required of the contract,
• Unsatisfactory inspections,
• Valid customer complaints against each performance objective observed, and
• Steps taken by the contractor to prevent occurrences in the future.
The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
FA4460-25-Q0050 PWS REVISION: 2 9
2.5.1 The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor will provide a written notification within 5 working days to the CO identifying areas of non-concurrence for resolution.
2.6 Contracting Officer Representative (COR). CORs are representatives of the CO and will participate in the administration of this contract. After the award of the contract, the contractor will be provided with a letter identifying the COR and setting forth their duties and authorities.
The COR is not authorized to change any of the terms and conditions of the contract/task order.
2.6.1 Acquisition Team Meetings. The contractor’s Contact Specialist (CS) with the CO, COR, and other government personnel constitute an acquisition team [See FAR 1.102 (c)] and shall meet on a regular basis. The Acquisition Team will establish how often meetings are needed based on contract complexity. As a subset of the Acquisition Team, Government members of the Acquisition Team are often referred to as the Multi-Functional Team (MFT) and may meet as determined by the MFT. The contractor may request a meeting with the CO when the contractor believes such a meeting is necessary. If the CO or CS deems necessary, written minutes of any such meeting shall be recorded by the CS in the contract file and signed by the COR and the CO or CS. If the contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the CO within 10 calendar days following receipt of the minutes.
2.7. Contractor’s Performance: The Government assesses a contractor’s performance on an ongoing basis, both positive and negative, and provides a record on a given contract during a specified period of time.
2.7.1 Past Performance Information (PPI): PPI can be provided to other government agencies as requested.
2.7.2 Contractor Performance Assessment Report (CPARS). Depending on the estimated value of the contract, formal assessment and reporting of contractor performance is required and is documented using the CPARS system. An assessment usually provided on an annual basis is sent to the contractor’s representative for their comment. The contractor will have up to 60 days to review and comment on the assessment.
SECTION III
3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1. Government Furnished Services (Base Support). The government will provide:
3.1.1 Utilities. The government will provide all electricity, water and sewage when available and appropriate at no additional cost to the contractor. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish requirements under this PWS.
3.2 Government Facilities. Not Used.
FA4460-25-Q0050 PWS REVISION: 2 10
3.3 Government Furnished Property (to include equipment and material). The government will provide existing drawings as availability permits.
3.3.1 Government Furnished Property (GFP). The contractor shall conduct an inventory of all GFP listed above during the phase-in transition period. The contractor shall sign a receipt for all equipment provided by the government. The contractor shall determine and certify the working order and condition of all equipment. Items of equipment missing or not in working order shall be recorded. If the contractor does not elect to participate in the inventory within the timeframe listed above, the contractor must accept as accurate, the listing and stated condition of equipment provided by the government. If the contractor participates in the inventory but does not agree with the government representative's determination as to the working order of the equipment, the equipment will be turned in as excess or the matter will be turned over to the CO for resolution.
The contractor shall designate a property custodian throughout the life of the contract to receipt and account for all GFP. By completion or extension of each yearly option of the contract, an inventory of GFP shall be conducted by the contractor and an audit performed by the government Property Administrator (PA). All equipment in need of repairs/maintenance shall be repaired/maintained by the government, depending on contract type and clauses elected for use in contract (i.e. 52.245-2(a) “as-is, where-is” condition) or unless the damage was caused by willful negligence of contractor.
3.4 Contractor Furnished Property and Services. Except for those items or services specifically stated to be government-furnished in Section III and any appendixes, the contractor shall furnish everything required to perform this contract in accordance with all of its terms. The following mentioned requirements are not all inclusive of the contractor’s furnished items and services required in the performance of this contract.
3.4.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.
3.4.2 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 2 of this PWS.
3.4.3 Materials: The Contractor shall furnish the materials, supplies, and equipment necessary to meet the requirements under this PWS.
3.4.4 Equipment: The Contractor shall furnish all equipment, pavement marking paint, signage, templates etc. to meet the requirements under this PWS.
SECTION IV
4.0 GENERAL INFORMATION
4.1 General Information
4..1.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander/Director has determined these services are not mission-essential and will not continue in the event of a crisis.
4.1.2 Recognized Holidays:
FA4460-25-Q0050 PWS REVISION: 2 11
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
4.1.3 Holidays and Facility Closings: Contractor/subcontractor personnel shall observe holidays and facility closings as authorized for government personnel. Contractor/subcontractor personnel shall only be permitted access to Government facilities when Government personnel are present.
4.2 Security Requirements
4.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility.
4.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities to use OPSEC to protect critical information for specified contracts, subcontracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.
4.2.3 Vehicle Requirements: Contractor personnel and vehicles must possess appropriate passes.
These passes shall be obtained from Installation Security Forces Pass and ID at the Vehicle Inspection Center.
4.2.4 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
4.2.5 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip
4.2.6 Service contracts shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
http://www.state.gov/j/tip
FA4460-25-Q0050 PWS REVISION: 2 12
4.3. Access to Government Facility or Military Installation: The Contractor shall ensure contractor/subcontractor personnel who require access to a Government facility or military installation comply with the security requirements of the facility or installation.
4.3.1 Identification (ID) Card/Badge
4.3.1.1 The Contractor shall ensure an ID card is obtained by all contractor/subcontractor personnel who require recurring access to a Government facility, but not local area network (LAN) access. The Contractor shall submit a letter to the CO listing all contractor/subcontractor personnel requiring access to the facility. The CO will approve the request and forward it to the issuing/registration office for processing. Contractor/subcontractor personnel shall report to the issuing/registration office to obtain the ID card(s). Effective 7 May 2025, ALL personnel entering Little Rock AFB (and all AF Installations) MUST have a REAL-ID compliant form of identification. State-issued driver’s licenses and identification cards from states not meeting the standards can no longer be used for accessing Federal facilities including Air Force installations. Individuals who do not possess a driver’s license or identification card compliant with the REAL ID Act will be denied access.
4.3.1.2 The Contractor shall submit a letter to the CO immediately if contractor/subcontractor personnel no longer require access, upon transfer/termination of contractor/subcontractor personnel or upon completion/termination of the contract/order. The letter shall identify the name(s) and social security number(s) of the contractor/subcontractor personnel. The Contractor shall return the ID card(s) to the issuing/registration office upon expiration, upon transfer/termination of contractor/subcontractor personnel, or once contractor/subcontractor personnel no longer require access to the facility. The Contractor shall return any and all ID cards to the issuing/registration office upon completion/termination of the contract
4.4 Hours of Operation: The contractor is responsible for conducting business between the hours of 7:30 am and 4:30 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.
The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.
4.5 Special Qualifications: The contractor is responsible for ensuring all employees’ work is supervised by qualified superintend/worker.
4.6 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, FA4460-25-Q0050 PWS REVISION: 2 13 being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
4.7 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.7.1 Quality Assurance: The Government shall inspect and evaluate the Contractor’s performance to ensure services are received IAW requirements set forth in this contract. The COR will periodically inspect by watching actual task performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not the performance meets the standards contained in this PWS.
The COR will use the Contractor’s work schedule to record surveillance results. This surveillance record then becomes the official Air Force record of the Contractor’s performance.
When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO with a Corrective Action Report (CAR), who will then issue the CAR to the Contractor. The Contractor shall respond to the CAR, IAW instructions provided and return it to the CO NLT ten calendar days of receipt.
4.7.2 Contracting Officer Representative (COR): The COR will be identified by separate letter.
The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
4.8 Key Personnel: The following personnel are considered key personnel by the government:
contract manager/alternate contract manager and superintendent/worker with a working knowledge of the MUTCD. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:30 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
4.9 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must
FA4460-25-Q0050 PWS REVISION: 2 14
also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
4.10 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may put into effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
4.11 Safety and Regulatory Requirements: The Contractor is subject to all installation fire, safety, security, and traffic regulations.
4.11.1 The Government contracts on the understanding that the Contractor is complying with applicable laws concerning workplace safety.
4.11.2 The Contractor is subject to all citations and penalties for violation of applicable workplace safety laws. The burden of compliance rests with the Contractor. Enforcement of workplace safety laws is the responsibility of the agency specified in the applicable law.
4.11.3 The Contracting Officer may notify the Contractor of hazards in Contractor operations that endanger Government personnel or property and require appropriate action. This provision does not constitute assumption of liability for Occupational Safety and Health compliance on the part of the Government or negate other agency responsibility for enforcement of applicable laws.
14.11.4 Accident prevention principles must be thoroughly integrated into all operations. Unsafe conditions and practices, as identified by the designated representative, must be corrected immediately.
4.11.5 Contractor Employees: While on the installation, the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the organization or by wearing appropriate badges containing the organization's name and the employee's name. Contractor personnel must wear issued base identification cards at all times while on the installation.
FA4460-25-Q0050 PWS REVISION: 2 15
4.12 Warranty: Contractor shall guarantee all material, workmanship and labor from defects for a period of 1 year from the date of acceptance of the work. A warranty letter detailing the work accomplished per facility is required to be furnished to the government representative upon acceptance of the work.
4.13 Definitions and Acronyms:
DEFINITIONS:
CONTRACTOR: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
CONTRACT SPECIALIST (CS). The individual within the contracting office who performs the day-to-day administration of the contract. The contract administrator may also be the contracting officer.
CONTRACTING OFFICER(CO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government.
Note: The only individual who can legally bind the government.
CORRECTIVE ACTION REPORT (CAR). Used to document unacceptable performance by the Contractor.
CONTRACTING OFFICER'S REPRESENTATIVE (COR): An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such an appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.
This individual does NOT have the authority to change the terms and conditions of the contract.
DEFECTIVE SERVICE: A service output that does not meet the standard of performance associated with the Performance Work Statement.
DELIVERABLE: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
GOVERNMENT FURNISHED PROPERTY (GFP). Facilities, equipment, tools, supplies, parts, or any other items furnished for the concessionaire's use by the Government.
KEY PERSONNEL: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
MAJOR DEFICIENCY. Major deficiency means an unsatisfactory condition that would endanger personnel, jeopardize equipment or system reliability, affect safety of flight, or warrant discontinuing the process or equipment operation.
FA4460-25-Q0050 PWS REVISION: 2 16
MINOR DEFICIENCY. Minor deficiency means an unsatisfactory condition that requires repair or correction, but does not endanger personnel, affect safety of flight, jeopardize equipment reliability, or warrant discontinuing a process or equipment operation.
NONCONFORMANCE. Nonconformance of supplies or services defined at FAR 46.101 may be of three kinds:
“Minor nonconformance” means a nonconformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose or is a departure from established standards having little bearing on the effective use or operation of the supplies or services.
“Major nonconformance” means a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose.
“Critical nonconformance” means a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission.
PERFORMANCE ASSESSMENT. A process that measures success towards achieving defined performance objectives or goals defined within the performance thresholds in the services summary or the process of assessing progress towards achieving the objectives/goals developed in a performance plan or partnering agreement.
PERFORMANCE INDICATOR. A measurable characteristic of an output of a work process.
Generally synonymous with attribute.
PERFORMANCE MANAGEMENT. The use of performance measurement information to effect positive change in organizational culture, systems, and processes, by helping to set agreed upon performance goals, allocating and prioritizing resources, informing managers to either confirm or change current policy or program directions to meet those goals, and sharing results of performance in pursuing those goals.
PERFORMANCE OBJECTIVE. The outcome is associated with successful contract performance in a specific area. This is a critical success factor in achieving the organization’s mission, vision and strategy which, if not achieved, would likely result in a significant decrease in customer satisfaction or risk mission failure. Obtaining multi-services/sub-services performed at a certain measurable standard and consistently ensures success in achieving the objectives critical to the mission.
PERFORMANCE THRESHOLD. The minimum performance level of a performance objective required by the Government.
PHYSICAL SECURITY: Actions that prevent the loss or damage of Government property.
QUALITY ASSURANCE (QA): The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
FA4460-25-Q0050 PWS REVISION: 2 17
QUALITY ASSURANCE SURVELLANCE PLAN (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
QUALITY CONTROL (QC): All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
SUBCONTRACTOR: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
TASK ORDER (TO): An order placed against an established contract, which may contain the general requirements and parameters of a proposed project. Included with the TO may be a PWS that defines specific technical requirements for the project. May also include information such as budget limitations, design certifications and drawings required to be prepared by the Contractor.
WORKDAY: The number of hours per day the Contractor provides services in accordance with the contract.
WORK WEEK: Monday through Friday, unless specified otherwise.
ACRONYMS:
AFI Air Force Instruction AFIMSC Air Force Installation and Mission Support Center AFPD Air Force Policy Directive AFOSH Air Force Occupational Safety and Health ANG Air National Guard AP Acquisition Plan ASP Acquisition Strategy Panel CCE Contracting Center of Excellence CFR Code of Federal Regulations CO Contracting Officer CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative CS Contract Specialist CUI Controlled Unclassified Information DD254 Department of Defense Contract Security Requirement List DAF Department of the Air Force DAFI Department of the Air Force Instruction DAU Defense Acquisition University DAWIA Defense Acquisition Workforce Improvement Act DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense DoDI Department of Defense Instruction FA Fire Alarm FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 MNS Mass Notification System OCI Organizational Conflict of Interest
FA4460-25-Q0050 PWS REVISION: 2 18
POC Point of Contact PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control SS Service Summary TE Technical Exhibit
FA4460-25-Q0050 PWS REVISION: 2 19
SECTION V
5.0 APPENDICES & SPECIFICATIONS
Appendix 1, Reference(s)
Table 1 Publication Title of Publication Date of
Publication MUTCD Manual Uniform Traffic Control Devices March 12, 2025 32 CFR Part 117 National Industrial Security Program Operating
Manual (NISPOM).
February 24, DoDD 4715.1E Environment, Safety, and Occupational Health
(ESOH)
March 19, 2005
DoDD 5205.02E DoD Operations Security (OPSEC) Program August 20, 2020 DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual October 29, 2020
Public Law 91- 596 as amended by Public Law 101-552
Occupational Safety and Health Act of 1970 December 29, as amended through January 1, 2004
Table 2 DELIVERABLES SCHEDULE
Deliverable Frequency # of
Copies Medium/Format Submit To Submittals for pavement marking paint and signage.
Traffic control methodology prior to start of work. Road closures need notification 3 weeks prior to start of work.
Request for digging permit.
Prior to start of work.
1 set. Electronic copy
(PDF)
19 CONS
No post project requirements. Not applicable. Same as above
Same as above Same as above
Table 3 Attachment/Technical Exhibit: Title of Exhibit
Attach 1/Technical Exhibit 1 Section Appendix 604 – Traffic control devices in construction zones
Attach 2/Technical Exhibit 2 Section Appendix 718 –Reflectorized paint pavement marking
Attach 3/Technical Exhibit 3 Section Appendix 726 – LRAFB standard signs and breakaway steel square post sign support with brown sleeve
Attach 4/Technical Exhibit 4 Estimated Workload Data
FA4460-25-Q0050 PWS REVISION: 2 20
TECHNICAL SPECIFICATION 1
SECTION APPENDIX 604- TRAFFIC CONTROL DEVICES IN CONSTRUCTION
ZONES
PART 1 - GENERAL
1.01 REFERENCES
The publication referenced below, but referred to thereafter by basic designation only, form a part of this specification.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT (AHTD):
AHTD Specification Section 604 Traffic Control Devices in Construction Zones This Specification Section has been included from the 2014 AHTD Standard Specification for Highway Construction. An electronic copy of the entire 2014 AHTD Standard Specification for Highway Construction can be downloaded from the following website https://www.ardot.gov/divisions/construction/standard-specifications/. The contractor shall maintain a copy of the 2014 AHTD Standard Specification for Highway Construction on the project site at all times in addition to the other required contract specification and drawings.
Where there are differences between the 2014 AHTD Standard Specification for Highway Construction and this contract, this contract shall govern. Reference the 2014 AHTD Standard Specification for Highway Construction for description, material requirements, construction requirements, and quality control requirements. Quality control testing is the responsibility of the contractor; the government reserves the right to validate the Contractor’s quality control testing with their own testing. Follow the measurement and payment below as it has been adjusted from the methodology of the AHTD to meet the requirements of this contract.
1.02 SUBMITTALS
Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Traffic Control Devices: AHTD Certificate/Certification, Manufacturer’s Product Data, MSDS’s.
Pavement Marking Removal: Concept of Operations (method), equipment, plan for protecting pavement to remain.
PART 2 - PRODUCTS
2.01 MATERIALS
Materials shall be on the Arkansas Highway Transportation Department Qualified Product List (QPL) https://www.ardot.gov/divisions/materials/qualified-product-list-qpl/.
PART 3 - EXECUTION
3.01 MEASUREMENT AND PAYMENT
All traffic control is paid in the pavement marking line item.
A. REMOVAL OF PERMANENT PAVEMENT MARKINGS
1. Method-of-Measurement: Removal of Permanent Pavement Markings will be measured by the linear foot of marking removed. When any pavement marking is removed in conjunction with the removal, scarification, milling, or grinding of the pavement, or is covered by a succeeding pavement course, the removal of the marking will not be measured for payment.
FA4460-25-Q0050 PWS REVISION: 2 21
2. Basis of Payment: The contract unit prices bid for these items shall be full compensation for removing pavement markings; and for all materials, labor, equipment, tools, and incidentals necessary to complete the work.
B. REMOVAL OF PERMANENT PAVEMENT MARKINGS (WORDS, ARROWS,
EMBLEMS)
1. Method-of-Measurement: Removal of Permanent Pavement Markings (Words), (Arrows), and (Emblems) will be measured by the unit. When any pavement marking is removed in conjunction with the removal, scarification, milling, or grinding of the pavement, or is covered by a succeeding pavement course, the removal of the marking will not be measured for payment.
2. Basis of Payment: The contract unit prices bid for these items shall be full compensation for removing pavement markings; and for all materials, labor, equipment, tools, and incidentals necessary to complete the work.
C. Pavement Markings. Permanent pavement markings will be measured and paid for under Sections 718 or 719 as applicable.
END OF SECTION
FA4460-25-Q0050 PWS REVISION: 2 22
TECHNICAL SPECIFICATION 2
SECTION APPENDIX 718 – REFLECTORIZED PAINT PAVEMENT MARKING
PART 1 - GENERAL
1.01 REFERENCES
The publication referenced below, but referred to thereafter by basic designation only, form a part of this specification.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT (AHTD):
AHTD Specification Section 718 Reflectorized Paint Pavement Marking This Specification Section has been included from the 2014 AHTD Standard Specification for Highway Construction. An electronic copy of the entire 2014 AHTD Standard Specification for Highway Construction can be downloaded from the following website https://www.ardot.gov/divisions/construction/standard-specifications/ . The contractor shall maintain a copy of the 2014 AHTD Standard Specification for Highway Construction on the project site at all times in addition to the other required contract specification and drawings.
Where there are differences between the 2014 AHTD Standard Specification for Highway Construction and this contract, this contract shall govern. Reference the 2014 AHTD Standard Specification for Highway Construction for description, material requirements, construction requirements, and quality control requirements. Quality control testing is the responsibility of the contractor; the government reserves the right to validate the Contractor’s quality control testing with their own testing. Follow the measurement and payment below as it has been adjusted from the methodology of the AHTD to meet the requirements of this contract.
1.02 SUBMITTALS
Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Reflectorized Paint Pavement Markings: AHTD Certificate/Certification, Paint: Manufacturer’s Data Sheets, MSDS’s, Manufacturer’s Color Chart Beads: Manufacturer’s Data Sheets, MSDS’s
PART 2 - PRODUCTS
2.01 MATERIALS
Materials shall be on the Arkansas Highway Transportation Department Qualified Product List (QPL)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .