This document contains Questions and Answers related to a federal contract opportunity. The key details are:

The contract is for the removal and replacement of a 2-MBTU/H boiler at Building 1231 on Little Rock AFB in Arkansas. The contractor must provide all personnel, transportation, tools, equipment, materials, and services required to complete the work within 45 days of material arrival. A site visit is scheduled for September 16, 2024, and all questions are due by September 17, 2024, with answers to be posted on SAM.gov. Quotes in response to the solicitation must be submitted by September 25, 2024. The contracting agency is the Department of the Air Force Air Mobility Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1. Are there any pictures available for this project – I did not provide pictures but a walk through was performed.

2. (PWS Page 2 of 180, Paragraph 3.2) The Grundfos Pump Model # shown in paragraph 3.2 on PWS page 2 of 180 is UPS 50-60F. The Model Number called out for the pump on page 112 of 180 is UP XL. Please advise which one is correct, sir. – I attached the pump sheet – UPS 50-60 F/SF has a 115 V version, meets the Head Range: 21ft, and meets the min flow for PK boiler of 120 GPM.

3. Are vehicles allowed to drive on grass to transport equipment to boiler room? Yes, but with common sense – if flood/rain not that day – use the walk path as much as possible to not tear up the grass then park off the walkway for students - you leave huge ruts in the grass you will have to make right. We have parked 120-Ton Portable chiller, on a trailer, in the grass area – it’s very solid