Questions and Answers.pdf
PDF 100 KB Posted
- Attached to
- C-130J Cargo Handling and Airdrop Training Load Storage System Federal contract opportunity
- Solicitation number
- FA446023Q0012
About this file
This document contains questions and answers regarding Solicitation FA446023Q0012 from the Department of the Air Force Air Mobility Command for a C-130J Cargo Handling and Airdrop Training Load Storage System. The storage system must be a mezzanine-style platform no lower than 4 feet and no higher than 5 feet off the ground, with a length of no more than 120 feet. It must include ball transfers, side skirting, and integrated stairways. Questions addressed include clarification on design and payment options, pictures of the installation area, product details, and anchoring requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers v1.pdf | ||
| Solicitation Amendment FA446023Q00120001 SF 30.pdf | ||
| Solicitation Amendment - FA446023Q00120001.pdf | ||
| Drawing.pdf | ||
| Solicitation - FA446023Q0012.pdf | ||
| J Model Cargo Handling and Storage System Specification 071323.pdf | ||
| Brand Name Justification and Approval.pdf | ||
| Service Contract Act Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers: Solicitation FA446023Q0012 - C-130J Cargo Handling and Airdrop Training Load Storage System
1. Is it possible to have a CLIN for design, or a progress payment? Many manufacturers are requiring down payments now upon PO, and this is a very sizable job.
No. This requirement is for a commodity. No design CLIN or progress payments will be included at this time.
2. Is it possible to have a picture taken of the area where this load system will be installed showing the floor?
See Pictures provided and note that this highline must remain within the 120’ in length due to entry ways (Doors).
3. CLIN 0001 Because you have asked for the Cogan mezzanine and not the elevated ball deck, the deck will be 6.5” high on top of the 4’ mezzanine. (not 4’ off the ground) We are ok with Cogan or equal raised/elevated deck that meets the height requirement of top of transfer system/Highline is no lower than 4 feet and no higher than 5 feet.
4. CLIN 0004 Because you have asked for the Cogan mezzanine and not the elevated ball deck, the tine way deck will be 6.5” high on top of the 4’ mezzanine. (Not 4’ off the ground) Reference answer on QUESTION 3.
5. CLIN 0005 The side guides do not have skirting as they will be anchored to the mezzanine floor.
We need the skirting to attach to the two sides opposite of the wall and east end (opposite of tine way/Load area) to hide the underneath. Skirting shall be made of industrial material (Not solid) resistant to tearing and chemical stain/fading that could be raised to gain access to underneath area.
6. CLIN 0006 The stairway for this CLIN was part of the elevated ball table design and does not work with the mezzanine underneath. The mezzanine manufacturer will need to requote the mezzanine adding this stairway. This CLIN is not required. It would be included in the mezzanine
CLIN.
See Reference to Question 3, there is also a need for stairways that is integrated into the elevated platform on the tine way end and midpoint of the highline.
7. CLIN 0007 Foot anchors were only required if the elevated ball table was being asked for. They do not apply to the mezzanine. The mezzanine will be anchored to the concrete with wedge anchors and leveled with shims and grout. This CLIN is not required
The only intent is that the high line system is anchored to the floor in accordance with best industry/commercial standards.
8. CLIN 0008 These ball transfers are Kietek made and “(Omni rollers)” does not apply. Omni rollers go with the gravity roller conveyor that previously quoted and not chosen as part of the design.
Correct, omni rollers doesn’t apply. We do require as stated in our brand name justification the KieTek KO1A0.
9. Item 4. Because you have asked for the stair design from the elevated ball deck to be on the mezzanine the square footage of the mezzanine bar grating will decrease Reference answer to question 3 & 6.
10. Item 7. Kietek K01A0 Ball transfers incorrectly states (Omni Rollers) this product is made by Kietek. Omni supplies gravity roller conveyors and those rollers are different than these ball transfers. (See CLIN 0008 above)
Agree, reference to question 8.
11. Item 9. 9.2.2.4 Removable stops are not applicable to this design. They are used in gravity roller conveyor to stop the pallets from moving forward/backward. In this design, the Weldon flip locks operate as a stop to keep the pallets from rolling off the table. These are not removable.
They “flip” up when in use, and down when not needed.
Agree.
12. Item 9. 9.2.2.16.1.1 Requires a skirt for the mezzanine however the skirt that was quoted previously was for an elevated ball table Kietek designed and not a part of the Cogan mezzanine.
Previously stated above at 9.2.2.16 it says that the floor space under the mezzanine should be accessible for cleaning/housing keeping as well. We have provided a 4’ high mezzanine in the past (for the same intended purpose) and it was required that the under sides remain open to be able to clean underneath. Do you want a partial skirt/kickplate around the mezzanine so you can still access underneath it?
Reference answer to Question 5.