MATERIAL_SUBMITTAL_FORM_rev_8_25_2015.xls
XLS spreadsheet 97 KB Posted
- Attached to
- Repair Sanitary Sewer Infrastructure Federal contract opportunity
- Solicitation number
- FA4460-15-B-0007
About this file
Revised Submittal Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_Responses.docx | DOCX document | |
| FA4460-15-B-0007-Conformed_Copy.pdf | ||
| FA4460-15-0007-0003.pdf | ||
| FA4460-15-B-0007-0002.pdf | ||
| Project_plan_sheet.pdf | ||
| FA4460-15-B-0007_Site_Visit_Sign_in_Sheet.pdf | ||
| 1_10_01_D-B_GENERAL_REQUIREMENTS_FOR_LRAFB_08-1036_(WW-08)_Rev_3_Sep_2015.docx | DOCX document | |
| FA4460-15-B-00007-0001.pdf | ||
| Attachment_7_-_LRAFB_Information.docx | DOCX document | |
| Attachment_5_-_C D_Report.doc | DOC document | |
| Attachment_8_-_LRAFB_Design_Criteria_Combined.pdf | ||
| FA4460-15-B-0007.pdf | ||
| Attachment_3_-_EMIS_Instruction_Guide.doc | DOC document | |
| Attachment_1_GENERAL_REQUIREMENTS_FOR_LRAFB_08-1036_(WW-08).pdf | ||
| Attachment_6-Schedule_of_Material_Submittals.pdf | ||
| Attachment_2-_LRAFB_WWIR_Drawings.pdf | ||
| Attachment_9-Wage_Determination_AR150169.pdf | ||
| Attachment_4_Environmental_MOA.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER NKAK 08-1036 | PROJECT TITLE Repair Sanitary Sewer Infrastructure (WW-08) and Arnold Road Water Line Replacement | SOLICITATION / CONTRACT NO. | ||||||||||||||||||||
| (To be completed by Project Architect or Engineer) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL ADDITIONAL MATERIAL SUBMITTAL ITEMS MAY BE REQUIRED AS THE DESIGN PROGRESSES | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| 1 | SDR 26 PVC Sewer Pipe | x | |||||||||||||||||||||
| 2 | Pre-cast Sewer Manholes (if used) | x | |||||||||||||||||||||
| 3 | Sewer service fittings | x | |||||||||||||||||||||
| 4 | Steel encasement pipe | x | |||||||||||||||||||||
| 5 | Casing spacers & End seals | x | |||||||||||||||||||||
| 6 | Gravel bedding and backfill material | x | |||||||||||||||||||||
| 7 | Manhole rings & covers | x | |||||||||||||||||||||
| 8 | C900 PVC Water Pipe | x | |||||||||||||||||||||
| 9 | Gate Valves | x | |||||||||||||||||||||
| 10 | Ductile Iron Fittings | x | |||||||||||||||||||||
| 11 | |||||||||||||||||||||||
| 12 | |||||||||||||||||||||||
| 13 | |||||||||||||||||||||||
| 14 | |||||||||||||||||||||||
| 15 | |||||||||||||||||||||||
| 16 | |||||||||||||||||||||||
| 17 | |||||||||||||||||||||||
| 18 | |||||||||||||||||||||||
| 19 | |||||||||||||||||||||||
| 20 | |||||||||||||||||||||||
| 21 | |||||||||||||||||||||||
| 22 | |||||||||||||||||||||||
| 23 | |||||||||||||||||||||||
| 24 | |||||||||||||||||||||||
| 25 | |||||||||||||||||||||||
| 26 | |||||||||||||||||||||||
| 27 | |||||||||||||||||||||||
| 28 | |||||||||||||||||||||||
| 29 | |||||||||||||||||||||||
| 30 | |||||||||||||||||||||||
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) |
Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
File details come from the government source that posted it. Updated .