Attachment_8_-_LRAFB_Design_Criteria_Combined.pdf
PDF 17 MB Posted
- Attached to
- Repair Sanitary Sewer Infrastructure Federal contract opportunity
- Solicitation number
- FA4460-15-B-0007
About this file
Attachment 8
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_Responses.docx | DOCX document | |
| FA4460-15-B-0007-Conformed_Copy.pdf | ||
| FA4460-15-0007-0003.pdf | ||
| FA4460-15-B-0007-0002.pdf | ||
| MATERIAL_SUBMITTAL_FORM_rev_8_25_2015.xls | XLS spreadsheet | |
| Project_plan_sheet.pdf | ||
| FA4460-15-B-0007_Site_Visit_Sign_in_Sheet.pdf | ||
| 1_10_01_D-B_GENERAL_REQUIREMENTS_FOR_LRAFB_08-1036_(WW-08)_Rev_3_Sep_2015.docx | DOCX document | |
| FA4460-15-B-00007-0001.pdf | ||
| Attachment_7_-_LRAFB_Information.docx | DOCX document | |
| Attachment_5_-_C D_Report.doc | DOC document | |
| FA4460-15-B-0007.pdf | ||
| Attachment_3_-_EMIS_Instruction_Guide.doc | DOC document | |
| Attachment_1_GENERAL_REQUIREMENTS_FOR_LRAFB_08-1036_(WW-08).pdf | ||
| Attachment_6-Schedule_of_Material_Submittals.pdf | ||
| Attachment_2-_LRAFB_WWIR_Drawings.pdf | ||
| Attachment_9-Wage_Determination_AR150169.pdf | ||
| Attachment_4_Environmental_MOA.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Current as of: 15 MAY 2013, Change 2 Update 23 January 2015 th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 1
DIVISION 50 – MINIMUM DESIGN REQUIREMENTS
SECTION 50 50 00 – 19th CES CIVIL/STRUCTURAL DESIGN CRITERIA
AND EXPECTATIONS
PART 1 - GENERAL
1.01 GENERAL
A. It is not the intent of these standards to inhibit design creativity. The intent is to introduce the designer to LRAFB standard design practices.
B. Sustainability
1. MILCON projects are expected to meet minimum LEED criteria for sustainable design.
Each such project will define a rating expectation (silver, platinum, gold, etc.), and decisions will be required on which ones are attainable for the project.
2. A life-cycle cost analysis is expected for selection of any roofing system other than SSMR for new construction. Results of that analysis, and resulting recommendations, are expected at the 35% design submittal.
3. All designs shall consider recycled material products. Products that utilize recycled materials shall be highlighted in the design analysis.
C. Codes and Requirements:
1. Designers shall conduct a thorough code review, and include all applicable requirements into the design. Listed below are some design requirements and resources:
a. Whole Building Design Guide: http://www.wbdg.org/
b. Unified Facility Criteria (UFC) http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
c. UFC 1-200-01 General Building Requirements - Review this document as it is applicable to all new and renovated Government-owned facilities for the Department of Defense. Review this document for current International Building Code (IBC) adoption, and other design criteria requirements.
d. Unified Facility Guide Specifications (UFGS) :
http://www.wbdg.org/ccb/browse_cat.php?c=3
e. Air Force Criteria: http://www.wbdg.org/ccb/browse_org.php?o=33
f. Air Force Civil Engineering Support Agency (AFCESA) Engineering Technical Letters (ETLs) : http://www.wbdg.org/ccb/browse_cat.php?c=125
g. SDDCTEA Design Manuals:
http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&To pic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&T opic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories
h. Tri-Service Transportation Design Criteria:
https://transportation.wes.army.mil/triservice/criteria.aspx
i. Architectural Barriers Act (ABA): http://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards/aba-standards http://www.wbdg.org/ http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 http://www.wbdg.org/ccb/browse_cat.php?c=3 http://www.wbdg.org/ccb/browse_org.php?o=33 http://www.wbdg.org/ccb/browse_cat.php?c=125 http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories https://transportation.wes.army.mil/triservice/criteria.aspx http://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards/aba-standards http://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards/aba-standards th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 2
j. Federal Highway Administration (FHWA):
i. Manual on Uniform Traffic Control Devices (MUTCD):
http://mutcd.fhwa.dot.gov/kno_2009r1r2.htm
ii. Standard Highway Signs and Markings (SHSM):
http://mutcd.fhwa.dot.gov/ser-shs_millennium.htm For new or replacement signage follow the minimum retroreflectivity levels in SDDCTEA Pamphlet 55-14 Traffic Engineering for Better Signs and Marking, section 2.1.8 Minimum Retroreflectivity Levels.
k. Pavement-Transportation Computer Assisted Structural Engineering (PCASE): https://transportation.wes.army.mil/pcase/Default.aspx
l. Hydrologic Engineering Centers River Analysis System (HEC-RAS):
http://www.hec.usace.army.mil/software/hec-ras/
m. Hydrologic Engineering Centers Hydrologic Modeling System (HEC-HMS):
http://www.hec.usace.army.mil/software/hec-hms/
n. Federal Highway Administration: http://www.fhwa.dot.gov/
i. FHWA Publications: http://www.fhwa.dot.gov/resources/pubstats/
ii. Alkali-Silica Reactivity Field Identification Handbook:
http://www.fhwa.dot.gov/pavement/concrete/asr/pubs/hif12022.pdf
o. Arkansas State Highway and Transportation Department (AHTD):
http://www.arkansashighways.com/
i. Roadway Design Division, Roadway Design Guidelines, Drainage Manual, and Manuals & Standard Roadway Drawings:
http://www.arkansashighways.com/roadway_design_division/roadway_desig n.aspx
ii. AHTD Specifications:
http://www.arkansashighways.com/standard_spec_2003.aspx
iii. AHTD Qualified Products List (QPL):
http://www.arkansashighways.com/materials_division/materials.aspx#
p. Arkansas Department of Environmental Quality (ADEQ):
http://www.adeq.state.ar.us/
i. ADEQ Construction Stormwater Program:
http://www.adeq.state.ar.us/water/branch_permits/general_permits/stormwat er/construction/construction.htm
ii. USGS National Field Manual for the Collection of Water Quality Data:
http://water.usgs.gov/owq/FieldManual/
q. Arkansas Department of Health:
i. Arkansas Department of Health, Engineering Home:
http://www.healthy.arkansas.gov/programsServices/environmentalHealth/En gineering/Pages/default.aspx
ii. Arkansas Department of Health, Rules and Regulations:
http://www.healthy.arkansas.gov/programsServices/environmentalHealth/En gineering/Pages/RulesRegulations.aspx http://mutcd.fhwa.dot.gov/kno_2009r1r2.htm http://mutcd.fhwa.dot.gov/ser-shs_millennium.htm https://transportation.wes.army.mil/pcase/Default.aspx http://www.hec.usace.army.mil/software/hec-ras/ http://www.hec.usace.army.mil/software/hec-hms/ http://www.fhwa.dot.gov/ http://www.fhwa.dot.gov/resources/pubstats/ http://www.fhwa.dot.gov/pavement/concrete/asr/pubs/hif12022.pdf http://www.arkansashighways.com/ http://www.arkansashighways.com/roadway_design_division/roadway_design.aspx http://www.arkansashighways.com/roadway_design_division/roadway_design.aspx http://www.arkansashighways.com/standard_spec_2003.aspx http://www.arkansashighways.com/materials_division/materials.aspx http://www.adeq.state.ar.us/ http://www.adeq.state.ar.us/water/branch_permits/general_permits/stormwater/construction/construction.htm http://www.adeq.state.ar.us/water/branch_permits/general_permits/stormwater/construction/construction.htm http://water.usgs.gov/owq/FieldManual/ http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/Pages/default.aspx http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/Pages/default.aspx http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/Pages/RulesRegulations.aspx http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/Pages/RulesRegulations.aspx th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 3
iii. Arkansas Department of Health, Plan Review Program:
http://www.healthy.arkansas.gov/programsServices/environmentalHealth/En gineering/planReview/Pages/default.aspx
iv. Arkansas Department of Health, Engineering Reports and Forms http://www.healthy.arkansas.gov/programsServices/environmentalHealth/En gineering/Pages/ReportsandForms.aspx
r. Ten State Standards for Water and Wastewater:
http://10statesstandards.com/index.html
s. American Water Works Association Bookstore:
http://www.awwa.org/Resources/Standards.cfm?ItemNumber=33777&navIte mNumber=33778&showLogin=N
t. US Army Corp of Engineers (USACE) Regulatory:
http://www.swl.usace.army.mil/regulatory/
u. United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS)
i. Web Soil Survey: http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm
ii. Technical Resources:
http://www.nrcs.usda.gov/wps/portal/nrcs/main/national/technical/
v. National Roofing Contractor’s Association (NRCA): http://www.nrca.net/
w. Metal Building Manufacturer’s Association (MBMA): http://www.mbma.com/
x. Registered Roof Consultants (RRC) and Registered Roof Observer (RRO) Directory: http://members.rci-online.org/wcm/RCIWeb/Directory/RCIWeb/Member_Listing.aspx?
y. Computer Aided Design (CAD) Standards: https://cadbim.usace.army.mil/cad
z. GIS
i. Spatial Data Standard for Facilities, Infrastructure, and Environment (SDSFIE) Standards: http://www.sdsfieonline.org/default.aspx
ii. U.S. Air Force GeoBase: Installation Geospatial Information & Services (this site may require CAC) https://cs.eis.af.mil/a7cportal/ProgramGroups/Resources/Pages/GeoBase.a spx
aa. Defense Installation Spatial Data Infrastructure (DISDI):
http://www.acq.osd.mil/ie/bei/disdi.shtml
bb. International Building Code (IBC):
http://publicecodes.cyberregs.com/icod/ibc/index.htm
cc. United States Army Corps of Engineers (USACE) Protective Design Center:
https://pdc.usace.army.mil/
dd. Federal Aviation Administration: http://www.faa.gov/
ee. Pulaski County Government (Arkansas) Planning and Development:
http://co.pulaski.ar.us/planning6.shtml http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/planReview/Pages/default.aspx http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/planReview/Pages/default.aspx http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/Pages/ReportsandForms.aspx http://www.healthy.arkansas.gov/programsServices/environmentalHealth/Engineering/Pages/ReportsandForms.aspx http://10statesstandards.com/index.html http://www.awwa.org/Resources/Standards.cfm?ItemNumber=33777&navItemNumber=33778&showLogin=N http://www.awwa.org/Resources/Standards.cfm?ItemNumber=33777&navItemNumber=33778&showLogin=N http://www.swl.usace.army.mil/regulatory/ http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm http://www.nrcs.usda.gov/wps/portal/nrcs/main/national/technical/ http://www.nrca.net/ http://www.mbma.com/ http://members.rci-online.org/wcm/RCIWeb/Directory/RCIWeb/Member_Listing.aspx http://members.rci-online.org/wcm/RCIWeb/Directory/RCIWeb/Member_Listing.aspx https://cadbim.usace.army.mil/cad http://www.sdsfieonline.org/default.aspx https://cs.eis.af.mil/a7cportal/ProgramGroups/Resources/Pages/GeoBase.aspx https://cs.eis.af.mil/a7cportal/ProgramGroups/Resources/Pages/GeoBase.aspx http://www.acq.osd.mil/ie/bei/disdi.shtml http://publicecodes.cyberregs.com/icod/ibc/index.htm https://pdc.usace.army.mil/ http://www.faa.gov/ http://co.pulaski.ar.us/planning6.shtml th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 4
2. All designs shall comply with the UFC 4-010-01 Department of Defense Minimum Antiterrorism Standards for Buildings.
3. All designs shall comply with the seismic requirements of UFC 3-310-04 Seismic Design for Buildings.
4. All designs shall comply with the seismic requirements of UFC 1-200-01 Design:
General Building Requirements.
5. Structural codes and references: Comply with current editions of ACI 318 Building Code Requirements for Structural Concrete, ACI Committee 302 Report, Guide to Concrete Floor and Slab Construction, ACI 360R Design of Slabs on Ground, ACI Manual of Concrete Practice, ASCE 7 Minimum Design Loads for Buildings and Other Structures, International Building Code, TM 5-809-6/AFM 88-3, Chapter 6 Structural Design Criteria for Structures Other Than Buildings, TM 5-809-12 / AFM 88-3, Chapter 15 Concrete Floor Slabs on Grade Subjected to Heavy Loads, TI 809-02 Structural Design Criteria for Buildings (including applicable references in Tables 1-1, 1-2, 1-3 Design Document Summaries), UFC 3-301-01 Structural Engineering, UFC 3-310-01 Structural Load Data, as is applicable.
6. All designs shall comply with the reliability and maintainability design checklist (ETL 01-
01) and the Little Rock AFB constructability checklist. For example for concrete design, provide a complete concrete design analysis of all major structural features, e.g. grade beams, foundation, floor slabs, columns, retaining walls. Show the work of how or why design decisions are made in sizing members, reinforcement chosen, and based on specific applicable references, e.g. American Concrete Institute, Concrete Reinforcing Steel Institute, Portland Cement Association, Precast/ Prestressed Concrete Institute, ASTM, International Building Code, TM/AFM, UFC. This includes design-build and design-bid-build project contracts.
7. STORM WATER:
EISA Section 438 (Title 42, US Code, Section 17094) established into law storm water design requirements for Federal development and redevelopment. Under these requirements, Federal facility projects over 5,000 square feet must “maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow. Reference DUSD (IE) Policy Memo dated 19 Jan 2010, “DoD Implementation of Strom Water Requirements under Section 438 of the Energy Independence and Security Acts (EISA)”. A copy of this memo is in the LRAFB Standard Specifications Division 50 “Minimum Design Criteria, Folder 7 Civil & Structural Requirements. Under EISA Section 438 requirements, Federal projects with a footprint over 5,000 square feet shall comply with UFC 3-210-10, Low Impact Development.
8. DIG PERMITS
Any design or construction work that penetrates the ground surface requires a LRAFB Approved Dig Permit prior to conducting work. Coordinate with the 19 th CES Project
Manager or Construction Manager to start the dig permit process. Dig permit approval can take 2-3 weeks, so plan accordingly.
9. CONCRETE JOINT LAYOUT
Designers shall provide a joint layout for all concrete work including structural and non-structural concrete. Provide details for each joint type to include expansion joints, contraction joints, and construction joints. This is applicable to all horizontal areas of concrete to include mezzanines (even if it is planned to receive a surfacing), drives, sidewalks, roads, airfields, parking areas, dumpster pads, facility entrances. Provide fillets.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 5
Where possible, joints shall not end in angles less than 90 degrees. Joint shall have a clean vertical face. Length to width ratio shall be .75 to 1.25. Joint spacing will be based upon thicknesses found in standard concrete practices or applicable Unified Facility Criteria.
Bottom line, the construction drawings will have a joint layout plan.
10. CONCRETE MIX DESIGNS
All concrete mix designs shall include a minimum of 25% Fly Ash to aid in mitigating Alkali Silica Reaction (ASR). The only exception shall be for interior structural concrete members not exposed to moisture. The requirement for 25% Fly ash includes, but is not limited to airfield concrete, slabs on grade, curb and gutter, sidewalks, concrete bridges, and concrete foundations.
1.02 SURVEYING
A. First Floor Elevations must be certified by a Licensed Surveyor.
B. HORIZONTAL DATUM:
The Arkansas State Plane Coordinate System (ASPCS) South based on the North American Datum of 1983 (NAD83) shall be used as the coordinate system and horizontal datum for projects.
C. VERTICAL DATUM:
The vertical datum shall be the National Geodetic Vertical Datum of 1988 (NGVD88). If the vertical datum for the prior surveys are determined not to be based on NGVD88, the surveyor shall provide the conversion formula relating to other known datum’s of record.
D. TERPS
Follow datum requirements of AFI 11-230. AFI 11-230, dated 30 Mar 2010, paragraph
1.5.12.3 states: All coordinates must be expressed as World Geodetic System-84 (WGS-
84) coordinates to at least two places past the decimal, with the map being associated to this coordinate system. The State Plane Coordinate System is not an acceptable aeronautical survey format.
E. MONUNMENTS AND BENCHMARKS:
1. Follow standards of US Army Corp of Engineers, Engineering and Design, Survey Markers and Monumentation, EM 1110-1-1002. This can be downloaded at http://publications.usace.army.mil/publications/eng-manuals/ .
2. Records and maps of known on base monuments and benchmarks can be obtained from 19CES Engineering Flight, Technical Support Section
3. New Monuments and Benchmarks shall be set by a Licensed Surveyor.
4. Submit documentation of new monuments and benchmarks to 19 CES Engineering Flight, Technical Support Section. See Chapter 6 of EM 1110-1-1002 for documentation requirements. Coordinate with 19 CES Engineering Flight, Technical Support Section before setting new monuments or benchmarks. The brass caps will be stamped with a benchmark ID number and date. Coordinate with the 19CES Programs Flight, Technical Support Section for Monument Layout, ID number and date format. For all newly placed benchmarks submit to the 19 CES Program Flights, Technical Support Section, to be included in the Base’s Benchmark Records and Maps, the following information: ID Number, Date Installed, Arkansas State Plane Coordinate System South Northing and Easting, NGVD88 Elevation, NAD83 Latitude and Longitude, Licensed Surveyor’s Name and Contact http://publications.usace.army.mil/publications/eng-manuals/ th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 6
Information who installed the benchmark, and any useful notes to aid in locating the benchmark.
5. Typical Monument Caps can be viewed in Appendix B of EM 1110-1-1002. Utilize the typical monument cap layout and size in a type compatible with the type of monument being set. In lieu of “CORP OF ENGINEERS – US ARMY” monuments shall bear the heading
“LITTLE ROCK AFB – USAF”
6. Monument and Benchmark Type and Construction Details: Follow EM 1110-1-1002 Chapter 3.
7. Typical monuments on LRAFB would be a Type G monument as defined in EM 1110-1- 1002. The construction details are illustrated in Figure 3-12. The Type G mark is constructed by excavating a 15-centimeter (6-inch)-diameter by 60-centimeter (2-foot)-deep hole. In areas where the maximum frost depth is greater than 2 feet, the excavated depth should be 1 foot below the maximum frost depth. The USACE disk may be driven into a 4-foot by 3/4-inch diameter pipe or on a 4-foot by No. 5 reinforcement steel bar (rebar). The pipe or bar assembly is then driven into the center of the hole until the disk is slightly above the surface. The hole is then filled with concrete to the disk. The use of a pipe or rebar is optional. The disk may be pushed directly into the fresh concrete; however, a magnet shall be placed in the concrete if pipe or rebar is omitted. The reactive nature of non-common materials may cause problems when placing aluminum caps on rebar. The use of a plastic insert serves as a barrier for the reaction and may prolong the life of the monument. The plastic insert is not necessary when using a standard brass disk. Below is a figure of a Type G monument.
8. At a minimum new benchmarks shall be set as follows: 8” Diameter concrete collar, 24” deep, with a 5/8” rebar approximately 4’ long, and a brass cap set on the rebar.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 7
9. In sensitive clay areas install a Type B monument as defined in EM 1110-1-1002. When the site geology is known to consist of sensitive clays, the Type B rod mark should be used.
The PVC sleeve should extend through the sensitive clay layer. The anchored section should be driven to refusal. When the site geology is known to consist of lacustrine clays, the Type B rod mark should be used. The PVC sleeve should extend through the highly desiccated soil. Reference Chapter 3 EM 1110-1-1002 for construction details of a type B monument. Below is a figure of a type B monument.
F. AERIAL IMAGERY
Prior to flying missions for aerial imagery coordinate with 19 th AW Airspace Manager and th
AW/XP.
1.03 UTILITY SYSTEMS
A. GENERAL:
1. All utilities shall be marked with tracing wire and warning tape on all new underground utilities.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 8
2. All utility crossings of roadways shall be accomplished by trenchless technology. If a waiver for open cut is approved, then a 8” 3,000 psi concrete bridge cap shall be provided that is supported by a minimum of 9” on the unexcavated sides of the trench and is capped with 2” HMA surface course. Sawcuts shall be neat and vertical. Install 4x4 No 10 gauge wire mesh at mid depth of concrete bridge over entire area.
B. Fire Protection Engineering
Reference UFC 3-600-01 Fire Protection Engineering for Fire Lane Access, Water Supply for Fire Protection, Fire Hydrants, Fire Department Connections. Fire Lane Access must take into account AT requirements. See Pavement Thickness Design below for Fire Lane Access Design.
C. DEMOLITION PROJECTS
1. All utilities taken out of service shall be removed. Abandon in place is not allowed.
2. Remove all service utility lines back to main water, sewer, natural gas or stormwater line. Remove all electrical service lines at the transformer. Remove all communication lines at the main pull box. Ensure no users between demolition project and main line will not be effected.
3. Remove all pavements that do not have a clear and required future use.
4. Demo and remove facility foundations in their entirety, not to slab or just below grade, but in whole.
5. Restore site to grass with 6” of topsoil and sod after grading. Grade to provide minimum of 2% slope to maintain positive drainage.
D. WATER SERVICE/DISTRIBUTION.
Any new line or replacement that exceeds 800 feet in length or has the potential to change the flow characteristics of the existing distribution system must be reviewed and approved by the Arkansas Department of Health and Human Services (ADHHS).
1. Design of potable water systems shall meet ADHHS and Ten States Standards for Water Works.
2. All exterior water lines shall be AWWA C900 PVC, DR 18 with ductile iron fittings.
3. Replacement of water mains and fire hydrant lines with C900 PVC pipes, foil warning tape and tracer wire. Locator wire shall be 10 gauge AWG solid, single conductor, insulated copper wire.
4. All valves shall be ductile iron or bronze gate valves. At TEES a gate valve should be installed on each branch; 3 gate valves per tee. Maximum distance between in-line gate valves is 500 feet.
5. Connections from new water mains to existing water mains shall be accomplished using a tapping valve-tapping saddle connection. Provide a typical detail.
6. Ebba -Megalugs are required at all MJ-MJ connections.
7. All valve, service and meter boxes shall be cast iron and rated for traffic loads.
8. All fire hydrants shall be 5-1/4 inch dry barrel type conforming to AWWA C502 and shall be a Mueller. Maximum distance between fire hydrants is 300 feet.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 9
9. All PIV’s shall conform to NFPA 24 and be provided with tamper switch connected to the buildings fire alarm system.
10. Connection to existing water lines shall be by “hot tap” with tapping valve and sleeve.
11. New lines shall be disinfected and hydrostatic pressure tested to meet ADHHS, Ten States Standards for Water Works, and industry standards.
12. Water meters and backflow preventers shall be installed in accordance with requirements specified in the LRAFB Mechanical Design Guide.
13. All above ground appurtenances shall be painted Sherwin Williams Bronze tone unless otherwise specified. Fire hydrants shall have the top color coded to indicate flow/pressure.
E. SANITARY SEWER.
Any new line or replacement that exceeds 800 feet in length or has the potential to affect the capacity of the existing system must be reviewed and approved by the Arkansas Department of Health and Human Services (ADHHS).
1. Design of sanitary sewer systems shall meet ADHHS and Ten States Standards for Wastewater Facilities.
2. All sanitary sewer lines should be SDR 26 PVC.
3. All manholes shall be cast in place or pre-cast concrete with water seals at all joints to preclude infiltration of groundwater.
F. STORM SEWER.
1. All storm sewers shall be reinforced concrete pipe.
2. Flared end sections are required – headwalls are not acceptable.
G. NATURAL GAS: Refer to the LRAFB Mechanical Design Guide for these requirements.
1.04 SITE WORK AND PAVEMENTS
A. Erosion control devices appropriate for each site shall be designed and provided to ensure compliance with ADEQ and LRAFB requirements.
B. Design shall comply with UFC 3-210-02, Low Impact Development.
C. Site drainage shall be designed to provide for positive drainage away from all structures on the site. Reference UFC 3-201-01.
D. Roof drains: See sub paragraphs of paragraph GUTTER, DOWNSPOUTS, SCUPPERS, AND DRAIN SYSTEMS for design guidance.
E. All disturbed areas shall be provided with 4” topsoil (fertile material free of trash, debris, and objects larger than ¾” diameter) and groundcover as follows:
1. All areas shall receive Bermuda sod, unless otherwise stated. The sod shall be rolled to present an even surface. It shall also be appropriately staked or pinned on slopes and in waterways to prevent washout.
2. In cases where seeding is allowed, the species is to be Bermuda and shall be applied by hydroseeding with a tackified mulch. Loose mulch such as straw and hay is not acceptable.
3. Sod and seed types for the airfield must be approved by LRAFB to be compliant with the BASH program.
F. Backfill & Structural Fill.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 10
1. “Donafil” (or other similar materials), organic materials, and expansive or highly plastic clays shall not be used on LRAFB as fill material.
2. In general, clean sands, sandy-clays, and gravels are acceptable fill materials
G. Concrete sidewalks shall be 4-1/2” thick by minimum 6’-0” wide unreinforced concrete (if reinforcement is required, fiber mesh shall be used). Provide a 4-inch thick base of crushed rock or washed gravel (not sand) for a capillary water barrier. Site conditions may dictate where a 6’ wide minimum sidewalk may not be desirable, and proposed alternatives may be considered on a case by case basis for approval by the 19 th CES Civil Engineer section.
H. Curb and gutter shall be 6” upright barrier type with integral 18” gutter.
I. Pavement Section Thickness Design
PCASE shall be used for pavement design. Pavement-Transportation Computer Assisted Structural Engineering (PCASE): https://transportation.wes.army.mil/pcase/Default.aspx Submit PCASE files for review with design submittals. Use UFC 3-250-01fa Pavement Design for Roads, Streets, Walks, and Open Storage Areas. PCASE shall also be used to design Fire Lane Access drives.
1. Asphalt pavements shall be designed using PCASE in accordance with UFC 3-250- 01FA, UFC 3-250-03, and UFC 3-250-18FA. Use the PCASE section except that the minimum flexible pavement section shall be 2” HMA surface course PG 64-22 per AHTD Specification Section 407 and placed per AHTD Spec Section 410, Tack Coat over full surface per AHTD Spec Section 401, 3” HMA binder course PG 64-22 per AHTD Specification Section 406 and placed per AHTD Spec Section 410, Prime Coat over full surface per AHTD Spec Section 401, over 9” Class 7 crushed aggregate base course per AHTD Specification Section 303 compacted to 98% modified proctor.
2. Road Shoulders: In road sections outside of curb and gutter, base course pavement section shall extend a minimum of 1foot beyond pavement section to receive asphalt, on each side of the roadway, for a built up shoulder. After asphalt is paved shoulders shall be dressed flush with asphalt. Beyond the minimum 1’ shoulders grade to drain away from road section.
J. Roadways and Parking Lots
1. Use UFC 3-250-18FA General Provisions and Geometric Design for Roads, Streets, Walks, and Open Storage Areas
2. Where practical use Arkansas Highway Transportation Department Standard Roadway Drawings and Drainage Manual. Incorporate Drawings into LRAFB Standard Drawing Layout: http://www.arkansashighways.com/roadway_design_division/roadway_design.aspx
3. Where practical specify AHTD Specifications: Incorporate Specifications into LRAFB Standard format.
http://www.arkansashighways.com/Construc/2003REMANUAL/2003_RE_Manual.aspx
4. Parking Lot Design use:
a. UFC 3-210-02 POV Site Circulation and Parking
b. SDDCTEA Pamphlet 55-17, Chapter 17 Parking
K. Accessibility
Design shall meet the DoD Policy meeting Architectural Barriers Act (ABA) Guidelines for accessibility. These guidelines are published at www.access-board.gov .
https://transportation.wes.army.mil/pcase/Default.aspx http://www.arkansashighways.com/roadway_design_division/roadway_design.aspx http://www.arkansashighways.com/Construc/2003REMANUAL/2003_RE_Manual.aspx http://www.access-board.gov/ th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 11
1. For Handicap Parking Signs/Stalls, AMC Sign Standards require the following:
a. ABA accessible parking spots will meet all ABA Accessible Design Standards including signage.
b. Use the “Standard Brown” background color with “Standard White” letters and symbols for all handicapped parking signs. Use FHWA SHSM Book Regulatory R7-8 and R7-8a for Van Accessible parking stalls.
c. Do not provide any handicapped symbols or wording to the parking surface of parking stalls. Handicapped parking access aisles will be stripped in “standard white” by diagonal stripes, 4” wide, 2’ on center. Blue color striping or sign panels are not acceptable. Do not display any “Fines” wordage or panel to handicapped signs.
d. Handicap Signs shall be pole mounted. Use the clear height of 5’-00” to the bottom of the panel unless safety dictates use of the 7’-00” height.
2. Accessible routes shall not terminate into curbs; handicap ramps shall be installed.
Projects including Design and Design-Build contracts which include installing sidewalks shall tie the sidewalks into the base sidewalk system. This means that if the project limits abut a roadway with a sidewalk crosswalk and the sidewalk across the street does not have a handicap ramp installed, the handicap ramp shall be installed as part of the project.
3. Toe of handicap ramps shall be flush with pavement
4. Reference SDDCTEA Pamphlet 55-17 Exhibit 11.3 for ADA Design Considerations.
L. Traffic Engineering and Entry Control Facility Design shall follow applicable UFC and Military Surface Deployment and Distribution Command Transportation Engineering Agency (SDDCTEA) Design Pamphlets, Manuals , and Directories including those listed below.
http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_ Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C %20Manuals%2C%20and%20Directories . SDDCTEA executes the Department of Defense’s overall transportation engineering program on behalf of the military services.
1. SDDCTEA Pamphlet 55-14 Traffic Engineering for Better Signs and Markings
2. SDDCTEA Pamphlet 55-10 Traffic Engineering for Better Roads
3. SDDCTEA Pamphlet 55-15 Traffic and Safety Engineering for Better Entry Control Facilities
4. SDDCTEA Pamphlet 55-8 Traffic Engineering Study References
5. SDDCTEA Pamphlet 55-17 Better Military Traffic Engineering
M. Signs and Markings
1. AMC Sign Standards shall be reviewed before specifying or detailing signage and pavement markings.
2. Reference SDDCTEA Pamphlet 55-14, Traffic Engineering for Better Signs and Markings
3. Follow MUTCD guidelines for sign and marking design.
4. Use the Standard Highway Signs and Markings (SHSM) Book for signs.
http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 12
5. Except as noted by AMC Sign Standards, signs shape, colors, and general design shall conform to those in the MUTCD and the SHSM book.
6. The backside of all signs shall have “standard brown” sheeting for full coverage. The backside of the sign that is “Standard Brown” is not required to meet the retroreflectivity standards.
7. Standard Size Sign: If more than one size sign is included in the SHSM Book, the standard size would be the size indicated by a black box with a white “C” in it, which represents the standard size for conventional roadways; Reference SDDCTEA Pamphlet 55-14 Exhibit 2.3.
8. Sign Supports (Reference SDDCTEA Pamplet 55-14, Paragraph 2.1.13 and AMC Sign Standard)
a. Sign Supports shall be “standard brown” or dark bronze. Bolts and brackets will match the surface color where attached.
b. For Signs with area less than 35 Square Feet steel Square Sign Posts shall be used. Submit from the steel square post supplier:
i. Certification Concerning FHWA’s approval, including the maximum number of sign posts that are allowed within a 7-foot path
ii. Documentation showing the maximum sign area that the posts will support at various sign heights, based on the locale’s design wind and soil conditions
iii. Proper installation instruction
9. Parking lot paint markings shall be white.
10. Crosswalk Markings: Reference SDDCTEA Pamphlet 55-17, Paragraph 11.4 CROSSWALKS for design considerations when considering crosswalks. Crosswalks shall be solid white line dimensioned as follows: 1’ wide, 6’ in the direction of vehicular travel, and spaced at 5’ on center. See below figure for typical:
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 13
11. Marking Retroreflectivity: Reference SDDCTEA Pamphlet 55-14, paragraph 3.2.3.
Supplement longitudinal lines with snowplowable raised retroreflective pavement markers (RRPMs). RRPMs shall be 3M Snowplowable Raised Pavement Marker RPM 190 (48mm width) or equal.
12. Sign Retrorelectivity Standards Follow SDDCTEA design guidelines published at the following link:
http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_ Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C %20Manuals%2C%20and%20Directories .For new or replacement signage follow the minimum retroreflectivity levels in SDDCTEA Pamphlet 55-14 Traffic Engineering for Better Signs and Marking, section 2.1.8 Minimum Retroreflectivity Levels, figure below.
http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories http://www.tea.army.mil/pubs/nr/DynaListDOD.asp?Cat_id=4&Sub_id=14&Topic_id=0&Cat_Name=DOD%20Programs%20for%20National%20Defense&Topic_Name=Pamphlets%2C%20Manuals%2C%20and%20Directories th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 14 th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 15
1.05 AIRFIELD PAVEMENTS
Design Airfield Pavements to meet all applicable Unified Facility (UFC) and Unified Facility Guide Specifications (UFGS) requirements.
A. TECHNICAL REVIEW OF MAJOR AIRFIELD PROJECTS
All major (over $1M) airfield pavement projects shall be reviewed by the Corps of Engineers (COE) Transportation System Center (TSC). Submittal documents at each major design review milestone shall be sent to the TSC for review. There is a fee for this service, which should be paid using project design funds. Reference AMC Policy Memo “Technical Review of Major Airfield Projects” dated 6 Feb 2002.
B. REFERENCES:
Additional Unified Facility Criteria and Engineering Technical Letter requirements exist beyond the below listed. Designers shall do a thorough code review for all applicable criteria. Airfield Designs should be to UFC and UFGS criteria not other criteria such as FAA, reference AMC Policy Memo on Design Criteria for Airfield Facilities.
1. UFC 3-260-01 - Airfield and Heliport Planning and Design
2. UFC 3-260-02 - Pavement Design For Airfields
3. AFI 32-1041 - Airfield Evaluation Program
4. AFI 32-1042 - Standards for Marking Airfields
5. ETL 04-2 - Standard Airfield Pavement Marking Schemes
6. ETL 09-6 - C-130 and C-17 Landing Zone (LZ) Dimensional, Marking, and Lighting Criteria
7. ETL 04-10 - Determining the Need for Runway Rubber Removal
8. ETL 04-4 Trenchless Technology (TT) for Crossing Air Force Pavements
C. RUBBER REMOVAL:
Rubber Removal shall be by the Chemical Detergent Method, Avion 50 or equal. Rubber removal extents shall be as determined using ETL 04-10 Determining the Need for Runway Rubber Removal
1.06 STRUCTURAL
A. UFC 1-200-01 General Building Requirements - Review this document as it is applicable to all new and renovated Government-owned facilities for the Department of Defense. Review this document for current International Building Code (IBC) adoption, and other design criteria requirements.
B. Structural Concrete.
1. Exterior concrete shall be air entrained (generally 5-7%).
2. In general, the slump should not exceed 4” unless it is being pumped (then it must be no more than 4” at point of deposit). Some types of concrete require slumps as low as 1”-2” to provide requisite characteristics (i.e. curb and gutter, etc).
3. With the exception of air entrainment, the use of other admixtures is not allowed unless approved by LRAFB and the mix design and trial batch are proportioned with the products included.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 16
4. The mix design shall incorporate fly ash in accordance with the Affirmative Procurement requirements, unless there is a technical or economic justification for not doing so.
5. Use 4,000 psi concrete with reinforcing bars with maximum spacing of 12-inch on center for building, dock, and drive slabs supported on 3-inch cubical precast concrete blocks. Do not use WWF. Dock walls will be a minimum of 12” thick.
C. 2. Pre-engineered Metal Buildings.
1. When masonry veneer is to be incorporated into the exterior finish of a pre-engineered metal building structure, the maximum allowable drift shall be L/600.
2. Installation of overhead cranes in a pre-engineered metal building shall require a rigorous structural analysis and likely additional bracing members and heavier connections.
1.07 ROOFING
All roofing projects, including both design-build and design-bid-build, shall be designed consistent with UFC 3-110-03 Roofing, requirements of the applicable Unified Facility Guide Specifications (UFGS) (Appendix A of UFC 3-110-03 lists applicable UFGS documents), and the below LRAFB roofing requirements. To complete a design to this criteria and UFC 3-110-03 it will require the use of the Current Editions of the National Roofing Contractors Association (NRCA) Roofing Manuals (NRCA Manual) http://www.nrca.net/rp/pubstore/products.aspx?c=4 , the NRCA technical bulletins, the NRCA Construction Details, the Metal Building Manufacturers Association (MBMA) Metal Roofing System Design Manual (MBMA Roofing Manual) http://www.mbmamanual.com/Products/6-metal-roofing-systems-design-manual.aspx .
A. ROOFING DESIGN
1. ROOFING SYSTEM DESIGN TEAM
Pending the design complexity, the roofing system design team will typically require the following Professionally Licensed / Registered Design Professionals:
a. Roof Designer of Record, (See Paragraph Below for Roof Designer of Record requirements)
b. Structural Engineer, PE (Required on all re-roof and new construction)
c. Plumbing Engineer: Either a Mechanical Engineer, PE or Civil Engineer, PE (Required for low slope roof drainage calculations)
d. Mechanical Engineer, PE, (Insulation, Ventilation, Rooftop Equipment, Fire Protection)
e. Civil Engineer, PE
f. Electrical Engineer, PE (lightning protection)
g. Registered Architect, AIA
2. ROOF DESIGNER OF RECORD PROFESSIONAL QUALIFICATIONS:
The roof design including specification editing, drawings, and details shall be completed by a member of the Design Team that is a Registered Roof Consultant (RRC) or a registered PE or RA that derives his or her principal income from roofing design (Reference UFC 3- 110-03, Paragraph 1-8.10). Design requirements related to the roof, but under the expertise of other members of the design team such as structural related issues shall be Designed, Stamped, and Sealed by the respective professional. The Roof Designer of http://www.nrca.net/rp/pubstore/products.aspx?c=4 http://www.mbmamanual.com/Products/6-metal-roofing-systems-design-manual.aspx th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 17
Record for the roofing system shall attend all design review meetings and present the design for the roof system. The Roof Designer of Record for the roofing system shall review all required roofing system related submittals and sign off for approval prior to Government submittal for approval. Provide the Government with contact information for the Roof Designer of Record for the roofing system to answer all Government roofing system related questions or comments as related to the roofing system for this project.
3. ROOF DESIGN AND ANALYSIS SUBMITTAL REQUIREMENTS:
Follow roofing design requirements applicable to the type of roof system being installed as detailed in this Civil Design Criteria, UFC 3-110-03, and applicable NRCA/MBMA Design Criteria as detailed in UFC 3-110-03 Paragraph 1-4.1 System Design. A full design must be complete prior to scheduling the Pre-Roofing Conference. A full design shall be submitted in drawings, details, and design analysis all of which shall be sealed and signed by the designer of record. The responsibility will be to the Roof Designer of Record to present to the Government in submittal documents and meetings how the Roofing Details included meet or exceed the minimum requirements of the required NRCA or MBMBA construction details and the additional detail requirements in UFC 3-110-03. Details shall be annotated with the NRCA and MBMA detail that they are derived from. The Roof Designer of Record shall supplement the standard details with details required for project specific conditions and full roof system design. A complete, full design shall include the following documents submitted and Government approved:
a. Fully edited Unified Facility Guide Specifications (UFGS) required for the roofing system and project specific conditions
b. Roof plan and elevation drawings fully annotated with detail callouts, showing all penetrations relative to layout of the roofing system. Label with arrows the intended drainage paths of the roofing system. See section below on penetrations for additional requirements.
c. For re-roofing projects include a roof demolition plan.
d. Details of all flashing and components of the roofing system logically referenced to the roofing plan.
e. UFC 3-110-03, Paragraph 1-8 and all applicable Subparagraphs, General Design Requirements
f. UFC 3-110-03, Paragraph 1-8 .2, Wind Resistance Rating. The designer of record shall determine wind uplift pressures and dimensions of the corners, perimeter, and field of the roof in accordance with ASCE-7, Minimum Design Loads for Buildings and other Structures. Delineate calculated values in the roof specification or drawings. Utilize independently tested and rated roof systems, such as Factory Mutual (FM), Underwriters Laboratory (UL), and Single Ply Roofing Industry (SPRI).
g. Thermal Expansion: Material Specifications and Details
h. Ventilation Requirements calculations (applicable to attic spaces)
i. Air and Vapor Barrier: Material Specifications and Details
j. Fall Hazards: The Roof Designer of Record shall submit to the Government as part of the design analysis a certification that the design meets the requirements of American National Standards Institute, ANSI/ASSE Z359 Fall th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 18
Protection Code, ANSI/ASSE A1264.1 Standard and DOL - 29 CFR Part 1910, Subpart D. Include Material Specifications and Details
k. Roof Hatches (when replacing, required by fire code, or when new attic space is created): Location, Specification, Details
l. Skylights (only if specifically requested for a project): Location, Material Specification, Details
m. Photovoltaic Systems (only if specifically requested for a project): Location, Material Specification, Details
n. Insulation and Coverboard specifications, Attachment Requirements. Provide “R-Value” calculations and a drawing detail of the roofing system section with “R-Values” showing how the R-38 requirement shall be met.
o. Tapered Insulation plan (for roofing systems in which this would be required)
p. Penetrations, Curbs, Crickets, Flashing, Counter-flashing, Coping Cap, Gutter, Downspouts, Drains, and Scuppers: location, details, and material specifications
q. Snow Retention Devices and Lightning Protection (applicable to metal roofing) requirements, locations, details, and specifications
r. Positive Drainage, Drawing. Quantity, Size, Locations, and Details of Roof Drains. UFC 3-110-03 Paragraph 2-3.1
s. Wind Design for Metal Roofs: Reference UFC 3-110-03, Paragraph 5-2.11 Wind Design, Roofing System ASTM E 1592 tested assembly
t. Structural Analysis requirements of new and re-roofing projects
u. In this Civil Design Criteria document see section General, B2. Sustainability, for sustainability roofing requirement submittals (applicable only to new construction for any roof system other than a SSMR)
v. The roof system shall meet or exceed the requirements of Engineering Technical Letter (ETL) 08-13, Incorporating Sustainable Design and Development (SDD) and Facility Energy Attributes in the Air Force Construction Program, paragraph 13.11, Roofing, which states: In other than Northern Tier Installations, roofing shall meet or exceed Cool Roof Rating Council Solar Reflectance Index (SRI) of ≥ 78 for low slope roofs (≤ 2:12) and ≥29 for high-slope roofs (> 2:12). “Northern Tier” is defined as heating degree days (HDD) greater than 7,000 and cooling degree days (CDD) less than 2,000. .” Designers shall detail in the design analysis how this requirement is met. Submit documentation of how this paragraph will be met.
w. Warranty Information: Warranty Information from the Manufacturer including a letter of transmittal from the roofing system manufacturer stating that their roofing system meets or exceeds all requirements
x. Any additional applicable Roof Design Requirement listed in this document, UFC 3-110-03, NRCA/MBMA Manuals, and UFGS.
B. GENERAL ROOFING REQUIREMENTS
The below requirements are applicable to all roofing system types excepts as noted.
th
CES CIVIL/STRUCTURAL DESIGN CRITERIA AND EXPECTATIONS
50 50 00 - 19
1. WARRANTIES
Warranties including Manufacturers and General Contractor’s Workmanship warranties that require periodic inspections or repairs at the Government’s expense to maintain the warranty are not permitted. The warranty terms, exclusions, and limits must be enumerated in the specifications and require that all roof curbs and penetration flashings integrated into the roof system are covered under the warranty including penetrations, flashing, counter flashing, and metal work. Roof Warranties shall be submitted for review and approval prior to material ordering. The General Contractor shall submit a letter of transmittal from the roofing system manufacturer with the roofing warranty information, stating that they have the requirements of this document and all referenced roofing requirements, and that the roof warranty is in compliance with the requirements of this document and all referenced roofing requirements. Warranties with unreasonable exclusions will be disapproved. Roof warranties shall clearly explain the warranty claim process. It is the General Contractor’s responsibility to select a roofing system that meets the roofing requirements in this document, the referenced roofing requirements, the contract documents, and to ensure the roof is installed to meet all the requirements of the roof warranties. A roof warranty that allows standards of installation below the requirements of this document will not override the requirements of this document; as stated previously it is the General Contractor’s responsibility to select a roofing system that will meet these requirements.
a. Single Source Roof System Manufacturer’s Minimum 20 year, Non-Prorated, No Dollar Limit, Water-Tightness and Material Finish Warranties:
The roofing system shall be provided with a fully executed Single Source Roof System Manufacturer’s Minimum 20 year, Non-Prorated, No Dollar Limit, Water-Tightness and Material Finish Warranties. The manufacturer’s warranties shall be from a single source manufacturer. Repairs required due to a breach in the warranties, to include material and labor, shall be covered by the warranty without any additional cost to the Government.
Signatures on manufacturer’s warranties will include the manufacturer, the General Contractor, and the Government representative (the contracting officer or a delegated representative). The Warranty shall be written such that the warranty will remain in affect between the manufacturer and the Government if the General Contractor goes out of business.
b. General Contractor’s Bonded 5 Year, Non-Prorated, No Dollar Limit, Water- Tightness Warranty:
The roofing system shall be provided with a fully executed General Contractor’s Bonded 5 Year Non-Prorated, No Dollar Limit, Water-Tightness Warranty. Leaks during the 5 year period starting at acceptance shall be repaired by the General Contractor with no cost to the Government. This warranty shall be with the General Contractor and the Government.