Attachment1-AR03000713Jun03Street-Highway-Runway.doc
DOC document 39 KB Posted
- Attached to
- Base Civil Engineering Works Federal contract opportunity
- Solicitation number
- FA4460-06-R-0007
About this file
Attachment 1 - General Wage Determination AR030007
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: FA4460-06-R-0007
Contract No.: FA4460-06-D-______
General Decision Number AR030007 06/13/2003 AR7
Superseded General Decision No. AR020007
State: Arkansas
Construction Type:
HIGHWAY
County(ies):
STATEWIDE
CONSTRUCTION, ALTERATION, AND/OR REPAIR OF STREETS, HIGHWAYS,
AND RUNWAY PROJECTS (does not include structures on highway rest areas)
Modification Number Publication Date
0 06/13/2003
COUNTY(ies):
STATEWIDE
SUAR2001A 01/19/1990
Rates Fringes
BRICKLAYERS 7.20
CARPENTERS 7.20
CONCRETE FINISHERS 7.20
ELECTRICIANS 8.75
IRONWORKERS:
Structural 6.30
Reinforcing 5.45
LABORERS:
Air tool operators 5.15
Asphalt heater operators 5.15
Asphalt rakers 5.85
Chain saw oeprators 5.15
Checker graders 5.45
Concrete joint sealers 5.15
Concrete saw operators 5.15
Formsetters 5.45
Laborers 5.15
Pipelayers 5.45
Powdermen 6.40
Vibratormen 5.15
PAINTERS 6.20
PILE DRIVER LEADMEN 6.20
POWER EQUIPMENT OPERATORS:
Aggregate Spreader operators 5.80
Asphalt plant firemen 5.15
Asphalt plantdriver operators 5.15
Batch plant operators 5.80
Bulldozer Operators:
Finish 6.90
Rough 5.65
Bull Float operators 5.65
Concrete curing machine operators 5.65
Concrete mixer operators:
Less than 5 sacks 5.15
5 sacks and over 6.20
Backhoe Operator - Rubber tired
(1 yard or less) 6.10
Cherry picker operators 6.10
Concrete paver operators 6.70
Concrete sperader operators 6.70
Crane, Derrick, Dragline, Shovel, Backhoe, Operators
1-1/2 yards or less 6.70 over 1-1/2 yards 7.20
Crusher operators 5.65
Distributor operators 5.65
Drill operators (Wagon or truck) 5.65
Elevating Grader operators 6.70
Euclid or like equipment operator (Bottom or end dump) 5.25
Finishing Machine Operators 6.10
Flaggers 5.15
Forkliff operators 5.15
Form grader operators 5.15
Front end loader operators
Finish 6.70
Rough 5.65
Hdro Seeder operators 5.15
Mechanics 6.90
Motor Patrol Operators:
Finish 6.90
Rough 5.65
Mulching machine operators 5.15
Oilers and Greasers 5.45
Piledriver operators 6.20
Power broom operators 5.15
Pug mill operators 5.15
Roller Operators (self propelled) 5.25
Scraper Operators:
Finish 6.90
Rough 5.65
Sod slicing machine operators 5.15
Stabilizer mixing machine operators 5.65
Tractor operators (crawler type) 5.15
Tractor operators (farm and sheel) 5.15
Tractor operators-wheel type
(with attach.-1 yd. or under) 5.55
Trenching Machine operators 5.55
STONEMASONS 7.20
TRUCK DRIVERS:
Distributor truck drivers 5.45
Semi-trailer 5.45
Lowboy drivers 5.65
Transit mix truck drivers 5.45
Truck Drivers (heavy-maximum pay load in excess of 3,000 lbs.) 5.15
Truck Drivers (light-maximum pay load 3,000 lbs.) 5.15
WELL DRILLERS 6.90
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under that identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U. S. Department of Labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review
Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U. S. Department of Labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION