FA445226R0016_Attachment 1_Bldg 730 Mini Splits_SOW.pdf

PDF 415 KB Posted

Attached to
FA445226R0016_Installation of Mini-Split Units in Building 730 ATC Simulator Rooms
Solicitation number
FA445226R0016
Issued by

About this file

This is a Statement of Work for the installation of mini-split air conditioning units at Pope Army Airfield, North Carolina. The 352nd Special Warfare Training Squadron requires the procurement, installation, and commissioning of two 3-ton ductless mini-split air conditioning systems in the Air Traffic Control Simulator Rooms located in Building 730. The work must comply with all local building codes and electrical standards.

The contractor shall install two 3-ton mini-split indoor units mounted on either the West or South wall of each simulator room with readily accessible controls. For outdoor installation, the contractor must install two condenser units on the West side of Building 730 as close to the building exterior as manufacturer specifications allow, complete with pre-made condenser pads and 40 AMP disconnect switches equipped with padlock capabilities for each unit. All electrical conduit and piping must be sealed and insulated at building entry points. Interior conduits must route above the drop ceiling until reaching the location above the indoor units, then be securely wall-mounted in a professional manner. Electrical supply wiring must originate from the main panel box in the hallway outside the Jumpmaster Classroom. Work is scheduled during normal hours of 0730-0430, with arrangements required for any outside-hours work through the Facility Manager. Personnel and work trucks must enter through the Ft. Bragg Knox Street Access Control Point with valid REAL ID. Upon completion, the contractor must perform full system testing to ensure both units operate within manufacturer specifications and leave the work area clean and debris-free. The contractor shall provide a minimum one-year warranty on all materials and workmanship from the date of Government acceptance. The Statement of Work includes attachments showing the Building 730 floorplan and aerial view.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR THE

INSTALL OF MINI-SPLIT UNITS IN

BLD 730 ATC SIMULATOR ROOMS

352 SWTS POPE ARMY AIRFIELD

21 Jul 2026

1.0 Purpose

The 352nd Special Warfare Training Squadron (352 SWTS) at 2477 Surveyor St, Pope Army Airfield, NC 28308 requires installation of mini splits to mitigate heating and air control. The objective of this project is to procure, install, and successfully commission two (2) 3-ton ductless mini-split air conditioning systems in the Air Traffic Control (ATC) Simulator Rooms located in BLD 730. This includes all necessary indoor units, outdoor condensers, electrical wiring, and conduit routing as outlined in the specific requirements below.

2.0 Scope of Work

The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the installation of the mini-split systems. All work must comply with local building codes, electrical standards, and the specifications detailed in this statement of work.

3.0 Specific Requirements

3.1. Indoor Unit Installation (Mini-Splits)

• Quantity and Capacity: Contractor Install a total of two (2) 3-ton mini-split indoor units (one for each ATC simulator room).

• Placement: Units shall be mounted on either the West or South wall of each respective room.

• Controls: The control systems for each unit (whether remote or unit-mounted) must be readily accessible to personnel operating within the ATC Simulator Rooms.

3.2. Outdoor Unit Installation (Condensers)

• Quantity: Contractor shall install two (2) condenser units (one for each mini-split).

• Placement: Condensers must be installed on the West side of BLD 730, situated as close to the building exterior as safely allowable by the manufacturer's specifications.

• Mounting: Provide and install a pre-made condenser pad for each outdoor unit.

• Disconnects:

o Contractor shall install a 40 AMP disconnect switch for each condenser unit.

o Each disconnect switch must be equipped with padlock capabilities to ensure safety and security.

3.3. Conduit and Electrical Routing

• Sealing: Contractor shall ensure all conduit and piping entering BLD 730 from the outside must be thoroughly sealed and insulated at the entry point to protect against weather elements and insect intrusion.

• Interior Conduit Routing:

o All interior conduits must be routed above the drop ceiling until it reaches the location immediately above the indoor unit(s).

o Any conduit leading from the ceiling down to the indoor unit must be securely wall-mounted and presented in a neat, professional manner.

• Power Supply: All electrical supply wiring must be run from the main panel box located in the hallway immediately outside the Jumpmaster Classroom.

3.4 Work Hours

Normal work hours are 0730-0430. If work needs to be performed outside of these hours, arrangements will be made ahead of time with the Facility Manager. On Federal Holidays, the facility will be closed. All work will be scheduled ahead of time with the Facility Manager to deconflict with training schedules.

3.5 Base Access

All work trucks must enter through the Ft. Bragg Knox Street ACP (Access Control Point). Any personnel entering must be a citizen and have a REAL ID. NOTE: The All-American Gate is closed for the foreseeable future. However, the All-American Visitor’s center is still open for Base Passes.

3.6 Warranty: The contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.

4.0 Testing and Acceptance

Upon completion of the installation, the contractor shall perform a full system test to ensure both mini-split units are operating within manufacturer specifications. The work area must be left clean and free of any installation debris.

Attachment 1. Building 730 Floorplan

BLD730.pdf

Attachment 2. Building 730 Aerial view

END OF STATEMENT OF WORK