FA445226R0016_Attachment 4_Price Proposal.pdf
PDF 140 KB Posted
- Solicitation number
- FA445226R0016
About this file
This is a Price Proposal template (Volume III, Attachment 4) for RFP FA445226R0016 issued by the Air Force for Building 730 Mini Splits Installation at Fort Bragg, NC. The template is structured to capture the contractor's pricing for labor, equipment, and materials necessary to complete the work as defined in the accompanying Statement of Work.
The proposal format includes one base Contract Line Item Number (CLIN 0001) priced as a single lot, with a designated field for the contractor to enter the base project total rounded to the nearest dollar. The template also accommodates proposed alternatives or additive work items, with instructions to reference Section F (Evaluation Information) of the RFP Letter for specific details on acceptable alternatives and betterments. Contractors must provide a combined total reflecting both the base project cost and all proposed alternates, also rounded to the nearest dollar. The document is marked as Controlled Unclassified Information (CUI) and contains no pre-filled pricing guidance, requiring offerors to develop and submit their own cost estimates based on the project scope and requirements outlined in the associated Statement of Work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP FA445226R0016
Attachment 4
CUI
CUI
Volume III, Price Proposal
CLIN DESCRIPTION
UNIT OF
ISSUE AMOUNT
The contractor shall provide all, labor, equipment, and material necessary to complete the work as identified in the Statement of Work for Building 730 Mini Splits Installation at Fort
Bragg, NC
Lot $________________
Base Project Total
Round to nearest dollar
Alt. ## Alternatives
(Refer to Alternatives under Section F – Evaluation Information in the RFP Letter.)
Lot $________________
(Insert a line for each Proposed Additive, Alternate, or Betterment)
Base Project Total and All Proposed Alternates Total $________________ Round to nearest dollar
File details come from the government source that posted it. Updated .