Attachment 8_QandA Matrix_FA445225R0039_Amendment 01.pdf

PDF 52 KB Posted

Attached to
43 Air Mobility Operations Group (AMOG) Door Repair Bldg 289, 347, 753- Fort Bragg/Pope AAF
Solicitation number
FA445225R0039
Issued by

About this file

This document is a Question/Answer Matrix for solicitation FA445225R0039, detailing specific clarifications about door hardware and closure requirements. The matrix covers three key questions regarding door replacements and modifications for Building B753's 1st Floor: (1) contractors are to replace one door closure on one leaf of double doors, with pneumatic door shocks to be replaced but not remote-controlled; (2) interior wood doors require replacement of panic locking mechanisms to ensure proper closing and securing; and (3) four doors on the Flightline side will require exterior key access, marked as item #7. The government's responses provide precise technical guidance about the scope of door hardware work, specifying exact replacement and modification requirements for the specified location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment Reference Question/Comment # Question/Comment Government

Response/Answer # Government Response/Answer

Attachment 1 - Statement of Work

Per SOW item (i) contractors will only be required to replace one door closure on one leaf of the double doors? Does this building have capability for pneumatic (air controlled) closures? This door closure will not function as a locking mechanism. Please confirm.

NO PNEUMATIC Actuators/controls remote from door. The door shocks are pneumatic/hydraulic and need to be replaced. Not replacing lock at this time

Attachment 1 - Statement of Work B753 1st Floor (pg.14)

For item 2 on the two interior wood doors are contractors required to repair the existing panic locking mechanisms for the doors to secure, or replacing door closures? Please advise. Repair or replace per SOW picture.

Replace the mechanism. Ensure door will close and be secured by locking mechanism.

Attachment 1 - Statement of Work B753 1st Floor (pg.14)

Item 3 Please confirm the four doors are egress only door hardware and will not have a key access from the exterior and no additional work to be completed at each door?

Four doors on the Flightline side will require exterior key access.

Marked by #7