This Statement of Work (SOW) details a construction contract for door repairs at three buildings (289, 347, and 753) located at Fort Bragg, North Carolina. The project involves comprehensive door modifications, including installing new locks (BEST LOCK® 7-pin core compatible), adding cypher locks, installing keypad systems, repairing panic bars, installing pneumatic door closure devices, painting doors, and installing double wood doors with glass windows and specialized locking mechanisms. The work must be completed within 60 days from removal to completion, with all materials prepared in advance and coordinated through the 43d Air Mobility Operations Group (AMOG) Contracting Officer's Representative (COR).

Key requirements include compliance with multiple safety and environmental regulations, including Corps of Engineers Safety Manual, OSHA standards, and Fort Bragg installation guidelines. Contractor personnel must be U.S. citizens, fluent in English, and complete iWATCH training within 5 calendar days of award. The contractor is responsible for proper waste disposal, using state-certified landfills, and maintaining detailed waste management records. The project includes a minimum one-year warranty on all materials and workmanship, with work to be performed between 7:30 AM - 4:00 PM, Monday through Friday, and requiring prior approval for weekend or holiday work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 8CUI

Statement of Work

Project Location: Ft. Bragg, North Carolina

Contract Type: Construction

Project Description: Repair Doors at 289, 347, 753

Project Number: P2-00011-25

Document Status: 25 JULY 2025

Prepared By: 43d AMOG, Business Office

P2-00011-25 Repair Doors at 289,347,753

CUI

STATEMENT OF WORK

25 JULY 2025

NOTE: ONLY CHECKED BOXES APPLY

1. Request for Construction Services: P2-00011-25 Repair Doors at 289, 347, 753

2. Description of Work: Furnish all labor, material, equipment, incidentals, supervision, and transportation for work necessary to repair doors (a total of twenty doors to be modified, repaired, or painted plus one door installed) at buildings 289, 347, and 753 located on Fort Bragg. All work shall be performed in accordance with the purchase order specifications, manufacturer’s recommendations, and UFC 1-200-01 and UFC 1-200-02. Work performed under this task order shall comply with the latest edition of all required publications, Federal, Department of the Army, State of North Carolina, and Fort Bragg construction safety and environmental protection laws, regulations, rules, and codes (i.e. American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), ASTM International (ASTM), U.S. Department of Defense (DOD), U.S. Environmental Protection Agency (EPA), etc.) and the Fort Bragg Installation Design Guide (IDG), dated at the time of the task order award. When a required publication is not specifically referenced in the contract, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.

3. AT/OPSEC Requirements: See AT/OPSEC Coversheet

Access, General Protection, and Security Policy and Procedures.

The Contractor and all associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal, Director of Emergency Services, or Security Office. The Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or individual facility change, the Government may require changes in contractor security matters or processes.

iWATCH Training.

The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the contracting officer’s representative (COR). This training shall be completed within 5 calendar days of purchase order award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 15 calendar days after purchase order award. This information is available at the following website: https://www.youtube.com/watch?v=vlzYhQp7fPw https://www.youtube.com/watch?v=vlzYhQp7fPw

4. Monthly Anticipated Adverse Weather Delay: Workdays Based on 5-Day Work Week.

These days are included in the POP.

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

10 9 6 4 4 6 8 7 4 4 5 9

5. Interface with Government Personnel: Access to and from the site shall be coordinated through 43d Air Mobility Operations Group (AMOG). Contractor will coordinate work schedule with the designated 43d AMOG COR.

6. Contractor Requirements:

A. Project Involves Handling of Asbestos or Lead Base Paint.

Record of Survey is provided.

Record of Survey has not been completed.

REC provided: See Appendix L

B. Occupancy During Construction

C. CQC System Requirements CQC Manager

D. Quality Control System (QCS) Required

E. Submittals are required on the following materials.

All Materials (FIO Approval)

F. After task order award:

APP – Accident Prevention Plan (GA Approval)

Contractors must submit all required submittals, including the APP within 10 calendar days of issuance of the AWARD.

7. Government Furnished Items/Work: None.

8. Scope of Work: This job includes all labor, materials and equipment required for full performance of the work. The scope of work of this purchase order includes, but is not limited to the following specific items of work:

A. Architectural:

1. Remove and replace existing doors and locks as required by Appendix A of this Statement of Work for Buildings 289, 347, and 753. All locksets shall be BEST LOCK ® 7-pin core compatible.

2. All keys (to open door lock, and the security access compartment on the lock) and combinations shall be left with the 43 AMOG COR.

a. Building 289

i. Provide and install new cypher lock on interior door to secure the 43 AMOG Honor Guard storage area.

b. Building 347

i. Provide and install Best Lock ® 7-pin core compatible keypad.

c. Building 753 provide and install the following equipment:

i. Pneumatic door closure devices one (1) in total

ii. Panic device hardware for door closure two (2) in total.

iii. Repair and replace as necessary parts for broken panic bar and door four (4) in total.

iv. Repair panic bar device hardware one (1) in total.

v. Paint doors, ten (10) in total, to match existing in accordance with the IDG.

vi. Install double wood doors with single glass window, upper and lower bolts, and keyed slide bolt locking mechanism.

3. Refer to Appendix A for locations of work.

4. Patch and paint all existing walls around door frames after new doors are hung to match existing in accordance with the IDG.

5. The contractor shall repair all damage, however incidental, caused by the contractor during installation to include patching, painting, and repair of any item broken to working condition. All painting will match existing paint, texture and finish of area to be repaired.

B. Electrical:

1. Coordinate any identified electrical issues with Fort Bragg Department of Public Works through the 43 AMOG COR.

C. The Contractor is responsible to verify all measurements and conditions pre-bid. The

Government intends to only hold one official site visit. Requests for additional site access must go through the 763 ESS/OL-Pope Contracting Squadron (763 ESS) point of contact (POC) listed in the Request for Proposal. Any additional site access will be made available to all Contractors solicited for this project. Acceptance of the purchase order shall constitute acceptance of the existing conditions. The contractor shall: protect existing, in-place, and new work, always provide adequate protection for persons and property, and execute the work in such a manner to avoid any hazard to persons and property as necessary.

D. The Government referenced details indicate the general extent of the work. The references are not intended to indicate or describe all work required for the full performance and completion of the requirements of the job.

E. The Contractor shall provide a timeline to completion during the RFP phase; and must adhere to schedule given, not to exceed 60 days from removal to completion.

F. All materials shall be on hand before any work commences. Secure storage is the responsibility of the contractor. The Government accepts no liability for storage of contractor parts or equipment.

9. ADDITIONAL ENCLOSURES: It is the responsibility of the contractor to ensure they are in receipt of and have reviewed all appendices prior to the award.

A. Appendix A – Site Map and Floor Plans / Record Drawings

10. DISPOSAL OF WASTE: Loose debris on trucks leaving the site shall be loaded in a manner that shall prevent losing or dropping of materials on streets and conform to local ordinances/ laws. Fasten suitable cover, such as a tarpaulin, over the load before entering surrounding streets. The Contractor shall be responsible for cleaning up any materials that fall from trucks and held liable for any resulting damages. The Contractor is solely responsible for spillage from its vehicles, and such spillage shall be cleaned up immediately. The Contractor shall report all spills to the Fort Bragg Fire Department 910.432.0911 or 911. For the duration of this purchase order and on a daily basis, the Contractor shall remove from all roads and / or streets asphalt, mud, soil, rocks, trash, and debris that result from its operations. All roads and / or streets affected shall be cleaned before the close of business on the day affected.

Contractor is also responsible for restoring the site/grounds back to its original condition.

Grass/soil must be restored to its original condition.

A. The Contractor shall submit all trip tickets from the off-post landfill facility to the COR/ACOR within three working days to show all debris is being land-filled in accordance with all Federal requirements and in an approved location.

B. The Contracting Officer (CO) will determine if materials removed from and not reused in the project are salvageable or unsalvageable. Salvageable materials shall be disposed of as directed by the CO. When material is designated as unsalvageable, the material from that point shall become the property of the Contractor.

C. The Fort Bragg Lamont Construction and Demolition (C&D) Landfill is closed and is not accepting any C&D Waste or Asbestos Waste. The Municipal Solid Waste (MSW) Transfer Station at the Lamont Landfill Facility is closed and is not accepting MSW at the facility.

D. All contractors shall use a State Certified C&D Landfill or Subtitle “D” Landfill outside Department of Defense land for the disposal of C&D waste, asbestos waste, and MSW. The contractor shall maintain data of all waste disposed (C&D and MSW) and all materials recycled in execution of a purchase order. The Department of the Army (DA) and the North Carolina Department of Environmental Quality (NCDEQ) requires monthly and annual reporting of all materials (waste and recyclables) managed by Fort Bragg. The Fort Bragg Environmental Compliance Branch, Solid Waste/Recycling Office is responsible for compiling data into monthly Directorate Reports to be consolidated into reports for DA and NCDEQ. A form from the Solid Waste/Recycling Office or a Contractor form shall be completed by the Contractor with the type of waste or recycled material, the weight of the waste/material (tons or pounds), and the certified facility accepting the waste/material. This information shall be submitted to Fort Bragg Solid Waste/Recycling Office no later than the second Friday of each month. Information can be submitted in person or by fax (910.396.4188). The phone number is 910-396- 3372.

E. All recyclable materials generated during execution is Government property unless the purchase order specifies that the Contractor can obtain the materials. State Law and Fort Bragg regulations require covering of loads of waste or recyclables to prevent litter. All waste and recyclable material loads are subject to be inspected of their contents while on Department of Defense land. The Lamont Landfill Facility Recycling Area will accept specific recyclable items as indicated below.

F. Concrete, Brick, Block and Asphalt: tested and free of asbestos and lead based paint to be recycled; no larger than 2 feet by 2 feet pieces or equivalent; minimal amount of dirt in load; no rebar protruding out of the concrete.

G. Trees, Limbs, and Stumps: 6 feet or less in length for diameter < 3 feet; 3 feet or less in length for diameter => 3 feet; minimal amount of dirt in load and in stump roots;

ground wood chips accepted; no trash in load.

H. Pallets: serviceable and non-serviceable.

I. Steel and Aluminum: no items requiring demilitarization; no items containing or coated with liquid.

J. Cardboard: clean of trash, plastic, Styrofoam, wood, metal, etc.; 40 cubic yard dumpster available for material; alternate acceptance location at Fort Bragg Recycling Center (Building 3-1240, DPW Compound at Butner Road / Reilly Road intersection).

11. AVAILABILITY AND USE OF UTILITY SERVICES: Utility services are available on site (power and water) for the completion of the work required. Any additional utility services will be furnished at an additional cost to the Contractor.

The Government will make no connections or alterations to the existing utility systems for the Contractor. Utilities for offices and/or storage buildings or areas will be billed to the Contractor monthly and will not be furnished free of charge. The Contractor shall be responsible for installing meters or other connections at no cost to the Government. At the conclusion of the contract, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia unless otherwise notified by the COR.

Prior to installing any utility connections at an office/storage site, the plan will be approved by the COR. When utility meters are installed, the Contractor shall notify the COR for the initial meter reading. Failure to obtain this initial reading will result in the Contractor being charged for the entire amount shown on the meter.

12. CONTRACTOR STORAGE AND TRAILERS: The Contractor shall place or paint a sign on all storage trailer(s) and building(s) used on this purchase order. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the contractor can be reached. The trailer(s) and building(s) shall be completed with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the purchase order and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean.

13. SAFETY: Safety will follow the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes.

The Contractor is responsible for daily clean up and complete restoration of the area once the purchase order is complete. Additional safety references to be followed include:

A. 29 CFR 1910, OSHA General Industry Standard B. 29 CFR 1926, OSHA Interim Construction Standard C. DA Pamphlet 385-10, The Army Safety Program D. Fort Bragg Regulation 385-10, Fort Bragg Safety Program

14. CONTRACTOR’S PERSONNEL

• Contractor personnel performing work under this purchase order shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed, and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

• Contractor personnel performing work under this purchase order shall be able to read, write, speak, and understand the English language to effectively carry out all purchase order requirements. They shall have a command of both the written and spoken English language to communicate in person properly, clearly, and effectively or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

• Contractor personnel must act as guests on the installation, which they are. Employees are expected to be always on the job site. In the event a contractor employee’s conduct is unsatisfactory, the foreman/supervisor is expected to handle the situation accordingly and in a timely manner.

15. HOURS OF WORK: Work shall be accomplished between the hours of 7:30 AM - 4:00 PM, Monday through Friday. No work shall be done on weekends or federal holidays without prior approval from the Contracting Officer. Legal holidays falling on Saturday are observed on the proceeding Friday and those falling on Sunday are observed on the following Monday. Work schedule and facility security shall be coordinated with the COR for facility access and security maintenance during duration of work. The Contractor shall not work outside of the stated hours of work, without first obtaining approval from the

COR.

16. WARRANTY: The Contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.

17. PHOTOGRAPHY: Photography on Fort Bragg is regulated/restricted. All contractors needing to photograph as part of their work must gain approval from Shane Woodmancy at shane.r.woodmancy.civ@army.mil (910) 908-1086 or Don Mollett at donald.l.mollett.civ@army.mil (910) 907-5293 for Ft. Bragg, Simmons Army Airfield and Pope Army Field, prior to taking photographs. Tag geolocation data and other metadata must be turned off.

END OF STATEMENT OF WORK

APPENDIX A

pgs. 9-15

B347

B289

B753 1st Floor

1. Pneumatic door closure devices one (1) in total

2. Panic device hardware for door closure two (2) in total.

3. Repair and replace as necessary parts for broken panic bar and door four (4) in total.

4. Repair panic bar device hardware one (1) in total.

5. Paint doors ten (10) in total.

6. Install double wood doors with glass windows, upper and lower bolts, and keyed slide bolt locking mechanism.

4555555

B753 2nd Floor 1. Pneumatic door closure devices three (3) in total

2. Panic device hardware for door closure one (1) in total.

3. Repair and replace as necessary parts for broken panic bar and door two (2) in total.

4. Repair panic bar device hardware one (1) in total.

5. Paint doors ten (10) in total.

6. Install double wood doors with glass windows, upper and lower bolts, and keyed slide bolt locking mechanism.

25 JULY 2025
Appendix A - P2-00011-25 Repair doors 289,347,753_MAPS_2_20250805.pdf
Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7

File details come from the government source that posted it. Updated .