This is a Statement of Work (SOW) for mailbox removal and installation services at an Official Postal Center, dated 10 September 2026.

The contractor must remove and dispose of existing dormitory mailboxes across eight buildings (1304, 1305, 1308, 1309, 1334, 1352, 1353, and 1355) and install USPS-approved replacement mailboxes. The total scope includes 693 mailboxes with varying dimensions across the facilities. All mailboxes must be front-loading with replaceable name slots, no engraving required. Each mailbox requires one master key and two keys per compartment. Work must be performed between 0800 a.m. and 4:30 p.m., Monday through Friday. The contractor is responsible for providing all labor, materials, specialized equipment, delivery coordination, uncrating, installation, and off-base disposal of removed items. Mailboxes will be replaced on a one-for-one basis with no retrofitting or alterations to existing support structures. The contractor must maintain control of all tools and equipment on-site and complete daily debris removal with final cleanup prior to inspection. A commissioning walk-through will occur within five days of completion with the Official Postal Manager, Postal Service Center, and Resource Advisor to verify functionality and safety compliance. Any deficiencies or rework required due to workmanship or non-compliance with the SOW must be corrected at no additional cost to the government. The contractor must comply with OSHA regulations, applicable federal and state environmental laws, National Electric Code standards, and coordinate all work with Dorm Management and the Official Postal Manager.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) for

Official Postal Center

Mailbox removal and Installation

10 September 2026

BACKGROUND

The dormitory mailboxes need to be replaced as many of them no longer function correctly. New replacement boxes are needed so that the Postal Service Center can properly deliver letter mail and dormitory residents can access their letter mail during non-customer service hours.

1. PROJECT LOCATION

Work for this contract must be performed at Building 1355,1353, 1352, 1334, 1309, 1308, 1305 &

1304. Work at the site must be accomplished between the hours of 0800a.m. and 4:30 p.m., Monday through Friday.

2. SCOPE

2.1. General

This statement of work encompasses the detailed requirements for the removal and installation of USPS approved mailboxes. The Contractor must provide all labor, materials, and specialized equipment as necessary to perform the work described herein as well as disposal of the removed items.

All must be front loading mailboxes. Replaceable name slots in each mailbox, no engraving required.

2.2. Description of Work

The contractor must disassemble, disconnect, remove and dispose (off-base) of the existing mailboxes.

The contractor will be responsible to offload, uncrate new mailboxes, and install new mailboxes. Each mailbox must have one master key and 2 keys per mailbox compartment.

3. INSTALLATION REQUIREMENTS

Contractor must supply all parts, labor, and equipment necessary to permanently install new mailboxes. The opening and closing of all regular and master locks must function smoothly and not require excessive force to open. The Contractor must effectively collaborate with Official Mail

Center as well as the Facility Manager by providing information about the location, design, dimensions, and all aspects of the project throughout the install process. All mailboxes will be swapped one for one and there will be no retrofitting or alterations of the current support structure.

4. COMMISSIONING

A walk-through will take place within 5 days of completion with the Official Postal Manager, Postal

Service Center and Resource Advisor. The contractor must demonstrate functionality and compliance acceptable to all safety standards. All deficiencies must be rectified by the Contractor at no extra charge to the Government in a later specified amount of time if/when any defects are noted.

5. JOB CONDITIONS

5.1. Delivery/Storage/Handling

Work and storage space is limited at the site. The contractor will be responsible for coordinating delivery, removal, and installation of mailboxes with Government listed point of contract.

5.2. Cleanup

The Contractor must remove all debris resulting from their work from the premises at the site and dispose of properly daily. Also, a final cleanup must be conducted when the work is complete and prior to final inspection.

5.3. Power

Electrical power required for the project work will be made available to the Contractor at no cost. The Contractor, at their expense, must provide all temporary connections, fittings, etc., from the source to the point of use. Arrangements for use of these facilities must be coordinated with Dorm Management.

6. GENERAL

6.1. Pre-Work Site Meeting

A site visit or teleconference must be made by the Contractor's key personnel who will be performing the on-site work to discuss disposal areas for any removed materials, procedures for working around the operating facility, etc. The Contractor must comply with the latest OSHA regulations Title 29 Code of Federal Regulations (CFR) regarding safety in the work area.

The Contractor must also comply with applicable Federal and State laws and regulations concerning human health and environmental protection, including those pertaining to air and water pollution, and the disposal of solid and hazardous wastes, substances, and materials.

The Contractor must consult the latest referenced OSHA, Environmental Protection Agency

(EPA), State, and local documents for pertinent regulations. In the event of an emergency or drill the contractor employees must follow diagrammed e x i t procedures which are posted in numerous locations in the area.

6.2. Contractor Personnel

All labor must be in strict conformance with rules, regulations, and recommendations of

OSHA, National Electric Code (NEC), municipal and State codes, National Building Code, or any other authorities having local jur isdiction pertaining to the work. An effort must also be made to use the objectionable product outside of peak operational hours.

6.3. Vendor Responsibilities

Vendor technicians will maintain control of all vendor tools and equipment at the jobsite. At no time will the government be responsible for lost, damaged, or missing tools, equipment, or parts that are property of the vendor on the jobsite. Any debris or trash created by the vendor on the job site will be disposed of by the vendor. Contractor personnel are only to be in their assigned areas and are not allowed in other areas without section supervision approval and/or escort.

6.4. Vendor Checkout

After completing the work that is outlined in this SOW, the vendor must check out with the Official

Postal Manager (OPM). OPM will inspect all work performed and will ensure work has been accomplished IAW this SOW and meets requirements necessary for the government.

6.4.1. Any dust, dirt, and debris on the ground that is caused by the contract will be swept up and cleaned before the contract leaves and will be disposed of. The areas will be checked by the OPM and contractor will not be released until area is clean.

6.4.2. Any work accomplished that is not according to this SOW or items that require rework due to workmanship or neglect will be corrected at no additional cost to the Government at the discretion of the Contracting Officer.

7. Building Break Downs

7.1 BLDG 1304

Total Number of Boxes – 87

Dimensions –

109 in W x 35 in H

7.2 BLDG 1305

Total Number of Boxes – 87

109 ½ in W x 34 ¼ in H

7.3 BLDG 1308

109 ½ in W x 34 ¼ in H

7.4 BLDG 1309

Dimensions -

7.5 BLDG 1334

Dimensions -

7.6 BLDG 1352

Total Number of Boxes – 79

77 in W x 39 1/4 in H

7.7 BLDG 1353

Total Number of Boxes – 79

77 in W x 39 1/4 in H

7.8 BLDG 1355

Total Number of Boxes – 105

Dimensions –

Left – 34 in W x 38 in H

Right – 70 in W x 38 in H